← Back to Morgan County, GA

Document Morgancountyga_doc_d6d30ebf1f

Full Text

Agricultural Permit Application (ALL APPLICATIONS HAVE TO BE FILLED OUT COMPLETELY IN ORDER TO BE PROCESSED) MORGAN COUNTY PLANNING AND DEVELOPMENT Post Office Box 1357 150 East Washington Street, Suite 200 Madison, Georgia 30650 (706) 342-4373 Office (706) 343-6455 Fax Property Owner’s Name: Cell phone#: Address: Home phone#: City: State: Zip Code: Email Address: Property Owners Information Project Name: Jurisdiction: Property Address: City: State: Zip Code: Nearest Intersection or Address: Name of Subdivision: Lot#: (if applicable) Property Location All Contractors Must Provide a copy of State Contractor’s and Business License Contractor’s Name: Cell phone Contractor’s Address: Office Fax City: State: Zip Code: Email Address: State Certification Expiration date: Occupational Tax Issuing County: Project Managers Name: Telephone Contractors Information Type of Building Permit Requested: (Check all that apply) βͺ Addition & Remodel βͺ Grain Silo βͺ Implement Shed βͺ Retaining Wall βͺ Addition βͺ Hay Barn βͺ Livestock Barn βͺ Other (Explain) βͺ Animal Arena βͺ Hog Polar βͺ Pole Barn βͺ Dairy Barn βͺ Horse Barn βͺ Poultry House βͺ Permit Renewal βͺ Horticultural Structure βͺ Remodel Explanation: ---PAGE BREAK--- Building Information: (Please fill in all pertinent information) Total cost of construction: $ (cost should be estimated to Fair Market Value) Structure will have: βͺ Electrical βͺ HVAC βͺ Plumbing Building Dimensions (Foot print): Total square footage of building: Heated: Unheated: 1st Floor Heated/Unheated: 2nd Floor Heated/Unheated: Living Quarters and/or Bathrooms: (if applicable) Bedroom(s) Half bathroom(s) Full bathroom(s) Kitchen(s) Office _______Total number of rooms Foundation: βͺ Basement βͺ Basement/Crawlspace βͺ Basement/Slab βͺ Crawlspace βͺ Crawlspace/Slab βͺ Monolithic Slab Foundation Material: βͺ Dirt βͺ Wood βͺ Poured Concrete βͺ Gravel/Stone βͺ Block βͺ Brick Structure Material/Support: βͺ Wood βͺ Steel βͺ Concrete βͺ Block βͺ Brick βͺ Poles βͺ Combination Exterior Materials/Covering: (Please check all that apply): βͺ Aluminum Siding βͺ Brick βͺ Stone βͺ Block βͺ Concrete βͺ Hardi-Plank/Hardboard Siding βͺ Vinyl βͺ Fiber Cement Siding βͺ Wood/Plywood Siding βͺ Metal βͺ Stucco/Masonry Veneer βͺ Particleboard Siding βͺOther Explain Roof Construction: βͺ Steel Truss βͺ Structural Steel βͺ Wood Truss βͺ Dimensional Lumber βͺ Engineered Lumber βͺ Heavy Timber βͺ Steel Joist βͺ Combination Roof Covering: βͺ Asphalt/Fiberglass Shingles βͺ Concrete Tile βͺ Mineral-Surfaced Roll Roofing βͺ Wood Shingles/Shake βͺ Metal Roof Panel βͺ Metal Roof Panel Shingle βͺ Single-ply Membrane Roof βͺ Slate βͺ Terracotta Tiles βͺ Built up Roof Covering βͺ Other Explain Fireplace: βͺ Insert βͺ Masonry βͺ Pre-fabricated βͺ Wood Stove Garage: βͺ Attached βͺ Carport βͺ Detached βͺ No Garage ---PAGE BREAK--- Type of Heating System (if applicable): βͺ Electric βͺ Heat Pump βͺ Gas βͺ Duel Fuel βͺ Solar βͺ Geo - thermal Power Company : βͺ Georgia Power βͺ Walton EMC βͺ Central Georgia EMC βͺ Snapping Shoals EMC βͺ Rayle EMC βͺ Tri County EMC Water Supply: βͺ Private Well βͺ City of Bostwick βͺ Private Water System βͺ City of Rutledge βͺ Morgan County βͺ Town of Buckhead βͺ City of Madison Sewage (if applicable): βͺ Private Septic βͺ City of Madison βͺ Private Sewage System βͺ City of Rutledge Environmental: Is the building within 200 feet of State Waters? βͺ Yes βͺ No Are there wetlands on the property? βͺ Yes βͺ No Is there flood plain on the property? βͺ Yes βͺ No Is the property in Conservation Use Program? βͺ Yes βͺ No All information is true and accurate to the best of my knowledge. Applicant Date Occupancy Classification and Group: (Check all that apply) ο€Š Assembly ο€Š A-1 ο€Š A-2 ο€Š A-3 ο€Š A-4 ο€Š A-5 ο€Š Business ο€Š B ο€Š Mercantile ο€Š M ο€Š Educational ο€Š E ο€Š Factory – Industrial ο€Š F-1 ο€Š F-2 ο€Š Residential ο€Š R-1 ο€Š R-2 ο€Š R-3 ο€Š R-4 ο€Š High Hazard ο€Š H-1 ο€Š H-2 ο€Š H-3 ο€Š H-4 ο€Š H-5 ο€Š Institutional ο€Š I-1 ο€Š I-2 ο€Š I-3 ο€Š I-4 ο€Š Storage ο€Š S-1 ο€Š S-2 ο€Š Utility & Miscellaneous ο€Š U ο€Š Single Family Dwelling ο€Š Two Family Dwelling