Full Text
ATTACHMENT PUBLIC WORKS Regulation, Product or Service Fee Notes (Add'l Fees, Equipment, Etc.) PUBLIC WORKS Construction Permit for Work in the ROW – Per Ordinance No. 1795 Under $5000 5% of Imp. Cost But not less than $100 $5000 to $25,000 $250 + 4% over 5K $25,000 to $100,000 $1,000 + 3% over 25K Over $100,000 $3,000 + 2% over 100K Weep Holes - First $300.00 ea. For First Weep Hole Weep Holes – Each Additional $50.00 ea. Ea. Additional Sewer Tap $202 Water Service Installation Charges & Meter Deposits 1 Inch Line 5/8” Meter $368/00 ea. - Meter Deposit $75.00 1 Inch Line and Meter $547.00 ea. - Meter Deposit $90.00 1½ Inch Line and Meter $1,134.00 - Meter Deposit $125.00 2 Inch Line and Meter $1,134.00 - Meter Deposit $150.00 3 Inch Line and Meter Cost based on actual labor and material cost + 15% - Meter Deposit $170.00 4 Inch Line and Meter Cost based on actual labor and material cost + 15% - Meter Deposit $275.00 6 Inch Line and Meter Cost based on actual labor and material cost + 15% - Meter Deposit $540.00 8 Inch Line and Meter Cost based on actual labor and material cost + 15% - Meter Deposit $600