Full Text
Item No. Description Quantity Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization 1 LS 45,000.00 $ 45,000.00 $ 44,500.00 $ 44,500.00 $ 37,465.50 $ 37,465.50 $ 35,000.00 $ 35,000.00 $ 51,500.00 $ 51,500.00 $ 2 Temporary Protection and Direction of Traffic 1 LS 5,715.00 $ 5,715.00 $ 27,000.00 $ 27,000.00 $ 33812 33,812.00 $ 35,000.00 $ 35,000.00 $ 81,750.00 $ 81,750.00 $ 3 Erosion Control (00280) 1 LS 5,965.00 $ 5,965.00 $ 1,850.00 $ 1,850.00 $ 750 750.00 $ 3,000.00 $ 3,000.00 $ 2,500.00 $ 2,500.00 $ 4 Pavement Overlay Geotextile (00350) 8,606 SY 2.68 $ 23,064.08 $ 6.00 $ 51,636.00 $ 2.94 $ 25,301.64 $ 3.75 $ 32,272.50 $ 3.00 $ 25,818.00 $ 5 Cold Plane Pavement Removal, 0-2" (00620) 8,606 SY 4.17 $ 35,887.02 $ 5.50 $ 47,333.00 $ 3.90 $ 33,563.40 $ 2.85 $ 24,527.10 $ 6.00 $ 51,636.00 $ 6 Aggregate Base (00641) 62 TN 96.50 $ 5,983.00 $ 42.00 $ 2,604.00 $ 75.50 $ 4,681.00 $ 50.00 $ 3,100.00 $ 125.00 $ 7,750.00 $ 7 Level 2, 1/2-Inch Dense ACP (00744) 1,051 TN 111.90 $ 117,606.90 $ 119.00 $ 125,069.00 $ 98.80 $ 103,838.80 $ 90.00 $ 94,590.00 $ 110.00 $ 115,610.00 $ 8 3-inch Asphalt Concrete Pavement Repair (00748) 36 SY 53.50 $ 1,926.00 $ 78.00 $ 2,808.00 $ 83.00 $ 2,988.00 $ 45.00 $ 1,620.00 $ 87.00 $ 3,132.00 $ 9 12-inch Asphalt Concrete Pavement Repair (00748) 60 SY 136.30 $ 8,178.00 $ 95.00 $ 5,700.00 $ 83.00 $ 4,980.00 $ 95.00 $ 5,700.00 $ 106.00 $ 6,360.00 $ 10 Concrete Curb, Type A (00759) 477 LF 63.00 $ 30,051.00 $ 75.00 $ 35,775.00 $ 106.70 $ 50,895.90 $ 95.00 $ 45,315.00 $ 47.00 $ 22,419.00 $ 11 Concrete Walks (00759) 2,991 SF 24.00 $ 71,784.00 $ 18.00 $ 53,838.00 $ 27.50 $ 82,252.50 $ 40.00 $ 119,640.00 $ 20.00 $ 59,820.00 $ 12 Truncated Domes on New Surfaces (00759) 200 SF 31.00 $ 6,200.00 $ 30.00 $ 6,000.00 $ 59.40 $ 11,880.00 $ 50.00 $ 10,000.00 $ 30.00 $ 6,000.00 $ 13 Extra for New Curb Ramps (00759) 20 EA 1,768.00 $ 35,360.00 $ 1,295.00 $ 25,900.00 $ 2,365.00 $ 47,300.00 $ 2,200.00 $ 44,000.00 $ 1,500.00 $ 30,000.00 $ 14 Longitudinal Pavement Markings - Paint (00860) 760 LF 2.70 $ 2,052.00 $ 3.00 $ 2,280.00 $ 2.75 $ 2,090.00 $ 2.50 $ 1,900.00 $ 2.50 $ 1,900.00 $ 15 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 612 SF 20.50 $ 12,546.00 $ 21.00 $ 12,852.00 $ 20.35 $ 12,454.20 $ 18.50 $ 11,322.00 $ 18.50 $ 11,322.00 $ 16 Pavement Bar, Type B-HS: Stop Bar (00867) 27 SF 20.00 $ 540.00 $ 21.00 $ 567.00 $ 20.35 $ 549.45 $ 18.50 $ 499.50 $ 18.50 $ 499.50 $ 17 Curb Marking, Paint (00869) 20 LF 11.00 $ 220.00 $ 20.00 $ 400.00 $ 11.00 $ 220.00 $ 10.00 $ 200.00 $ 10.00 $ 200.00 $ 18 Remove and Reinstall Existing Signs (00900) 1 LS 1,400.00 $ 1,400.00 $ 2,250.00 $ 2,250.00 $ 715.00 $ 715.00 $ 700.00 $ 700.00 $ 2,000.00 $ 2,000.00 $ 19 Crosswalk Closed Sign Supports (00902) 4 EA 1,095.00 $ 4,380.00 $ 1,295.00 $ 5,180.00 $ 1,650.00 $ 6,600.00 $ 1,500.00 $ 6,000.00 $ 1,500.00 $ 6,000.00 $ 20 Perforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 2,965.00 $ 2,965.00 $ 1,575.00 $ 1,575.00 $ 8,250.00 $ 8,250.00 $ 5,000.00 $ 5,000.00 $ 3,000.00 $ 3,000.00 $ 21 Signs, Standard Sheeting, Extruded Aluminum (00940) 21 SF 49.00 $ 1,029.00 $ 29.00 $ 609.00 $ 49.50 $ 1,039.50 $ 60.00 $ 1,260.00 $ 36.00 $ 756.00 $ 22 Evergreen Path: Level 2, 1/2-Inch Dense ACP (00744) 240 TN 130.00 $ 31,200.00 $ 139.00 $ 33,360.00 $ 108.62 26,068.80 $ 115.00 $ 27,600.00 $ 115.00 $ 27,600.00 $ TOTAL: 449,052.00 $ TOTAL: 489,086.00 $ TOTAL: 497,695.69 $ TOTAL: 508,246.10 $ TOTAL: 517,572.50 $ Jesse Rodriguez Const. H & H Paving Roy Houck Constr. N Santiam Paving 2025 Pavement Maintenance Bid Tabulation Knife River City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -1