Full Text
Updated 8/8/2023 METHOD of FOUNDATION VERIFICATION Permit Number Date Address I will have string lines installed prior to the requested time of the footing inspection (minimum one at the rear of the lot and one side of the lot). I certify that these string lines are the true property boundaries. Note: If you choose this option and do not provide the string lines, the inspector will not be able to inspect your footing and/or foundation. I will provide a certification from a surveyor verifying the buildings location on the property at the time of foundation inspection. Signature of Applicant CITY OF WOODBURN Building Department 270 Montgomery St Woodburn, Oregon 97071 (503) 982-5250 [EMAIL REDACTED]