← Back to Woodburn

Document Woodburn_doc_b349733b40

Full Text

Fee Note More than 1.00 acre $5,315 WDO 5.04.01 Less than or equal to 1.00 acre $2,657 WDO 5.04.01 Appeal to City Council (Type III) See Note. $140 + half of original application fee, but maximum total $2,797. Appeal to City Council (Type II) $250 Maximum $250 per Oregon Revised Statutes (ORS) 227.175(10)(b) [2019]. $4,869 WDO 5.04.02 Non-Specific $5,584 WDO 5.03.01 Specific: Historically or Architecturally Significant Building $1,787 WDO 5.03.08 Specific: Telecommunications Facility $3,403 WDO 5.03.11 Type I $710 WDO 5.01.02 Type II or higher: Up to 3,000 total square feet (sq ft) $6,335 WDO 5.02.03 or 5.03.02 Type II or higher: More than 3,000 and fewer than 30,000 total sq ft $9,832 WDO 5.02.03 or 5.03.02 Type II or higher: 30,000 or more total sq ft $20,140 WDO 5.02.03 or 5.03.02 Free WDO 2.06.02 & 5.01.03 Partition (FPAR) $1,927 WDO 5.01.06 Subdivision (FSUB) $4,020 WDO 5.01.06 Middle Housing Land Division $1,927 ORS 92.031 Planned Unit Development (FPUD) $4,020 WDO 5.01.06 & 5.01.07 $710 WDO 5.01.04 Free WDO 2.07.10 Preliminary Approval (MDP) $4,880 WDO 5.03.04 Final Approval (FMDP) $1,684 WDO 5.01.05 Middle Housing Land Division (MHLD) Preliminary Approval $3,854 Per SB 1537 (2024), codified in ORS 197A. See Note. $140 + half of original fee for related application(s). WDO 4.02.07 Partition (PAR) Preliminary Approval $3,854 WDO 5.02.05 $2,222 WDO 5.03.05 Conceptual Development Plan $4,641 + $57/lot Base fee is for first lot, each additional lot is $57.WDO 3.09 & 5.03.06 Detailed Development Plan $1,425 WDO 5.01.07 & 5.03.07 $710 WDO 4.01.13 More than 1.00 acre $2,098 WDO 5.01.08 Less than or equal to 1.00 acre $710 WDO 5.01.08 $559 WDO 5.02.02 $710 Per SB 1537 (2024), codified in ORS 197A. $694 WDO 2.05.05 & 5.01.09 Permanent: Freestanding $539 WDO 3.10 & 5.01.10 Permanent: Other than freestanding $119 WDO 3.10 & 5.01.10 Temporary Free WDO 3.10 & 5.01.10 $171 WDO 2.07.17 & 5.01.12 Type II $4,185 WDO 5.02.04 Type III or higher $4,724 WDO 4.01.07 & 5.03.03 Subdivision (SUB) Preliminary Approval $5,869 + $57/lot Base fee is for first lot, each additional lot is $57. WDO 5.03.10 Tier 1 $228 application fee + $155 mitigation deposit Applicant has 1 year after permit issuance to plant mitigation tree(s) and request refund of mitigation deposit(s). WDO 3.06.07 & 5.01.11. Tier 2 $435 (Significant) or $539 (Tremendous) application fee + $155 mitigation deposit Applicant has 1 year after permit issuance to plant mitigation tree(s) and request refund of mitigation deposit(s). WDO 3.06.07 & 5.01.11. Tier 3 Significant: $642 application fee + $259 mitigation deposit; Tremendous: $850 application fee + $518 mitigation deposit Applicant has 1 year after permit issuance to plant mitigation tree(s) and request refund of mitigation deposit(s). WDO 3.06.07 & 5.01.11. Significant Tree Removal Permit (TREE) Street Adjustment (SA) Special Event Permit (SPEV) Grading Permit (GRAD) Home occupation review Modification of Conditions (MOC) Sign Permit (SIGN) City of Woodburn, Oregon: Planning Division Fee Schedule Residential "Mandatory Adjustment" Request Riparian Corridor & Wetland Overlay District Permit (RCWOD) Residential Architectural Standards Substitution (RSS) Phasing Plan (PP) Pre-Application Conference (PRE) Land Use Applications Conditional Use Permit (CU) Annexation (ANX) Appeal, Land Use Design Review (DR) Final Plat Approval Property Line Adjustment; Lot Consolidation (PLA) Planned Unit Development (PUD) Manufactured Dwelling Park Fence Permit (FNC) Comprehensive Plan Map Amendment (CMPA) ---PAGE BREAK--- Tier 4 Significant: $850 (Multiple-dwelling development) or $1,471 (Other type of development) application fee + $518 mitigation deposit; Tremendous: $155 per inch of diameter at breast height ($6,527 maximum fee for multiple-family dwelling, $13,054 for other type of development) + $984 mitigation deposit Applicant has 1 year after permit issuance to plant mitigation tree(s) and request refund of mitigation deposit(s). WDO 3.06.07 & 5.01.11. Annexation context Equal to the highest removal fee among those for T4. WDO 3.06.07J 1st request $4,864 WDO 5.03.12 Each additional request $710 WDO 5.03.12 $4,781 WDO 5.04.04 $3,647 WDO 5.02.06 Fee Note Base fee $228 For a residential, commercial, or industrial complex of buildings Base fee for first building + $4 per additional building For multiple lots and/or tracts Base fee for first lot or tract + $4 per additional lot or tract $52 Only applicable for bonds held by the Planning Division. 1st submittal $363 2nd and successive submittals $259 $2,590 Development agreement: ORS 94.504 (2007). IGA, MOU: ORS 190.010 (1991). Middle Housing Land Division $9,386 ORS 197.380 (2021) Partition (other than middle housing) $6,548 ORS 197.360-380 (2021) Subdivision (other than middle housing) $9,386 ORS 197.360-380 (2021) $93/hour For land use review, not building permit review, and distinct from "Expedited Land Use Review". Subject to staff availability and as allowed by law for use. Fee is in addition to application fees and is based on an hourly rate for overtime. $710 WDO 4.02.05 $2,735 Plus costs if Oregon Ballot Measure 56 (1998), codified in ORS 227.186, is applicable. WDO 1.03.04, 2.01.03, & 4.02.06. $355 Free $93/hour Applied per Director discretion. Mimics the Public Works fee schedule for printing and copying. Applicable only if total charge would be $10 or more. 1st & 2nd inspection is free. 3rd and successive inspections are $259 each. For public infrastructure improvements and private development improvements associated with a land use and/or building permit approval. $932 Applicable if a land use application requires a TIA per WDO 3.04.05. (Recoups cost to City of retaining a transportation consultant to assist with development review.) $104 Significant Tree Removal Permit (TREE), cont'd Expedited review Zoning Map Amendment (ZMA) Zoning Adjustment (ZA) Expedited Land Use Review Variance (VAR) Addressing Assignment, Street Planning Division Services Planning service 1.5 hours or more (by appointment) Printing and copying Transportation impact analysis (TIA) review Zoning verification letter Site inspection Interpretation of the WDO, formal Land Use Compatability Statement (LUCS) or other jurisdictional Extension of a development decision Planning front counter, email, and phone inquiry service Bond or performance guarantee release or status letter Drafting of development agreement, intergovernmental agreement (IGA), or memorandum of understanding (MOU) Civil engineering plan review For Planning Division review of Public Works Department permit materials.