ITEM SPEC DESCRIPTION UNIT QUANTITY Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL Unit Price TOTAL 1 0210 Mobilization LS 1 30,000.00 $ 30,000.00 $ 58,000.00 $ 58,000.00 $ 87,109.60 $ 87,109.60 $ 66,000.00 $ 66,000.00 $ 76,500.00 $ 76,500.00 $ 122,000.00 $ 122,000.00 $ 74,000.00 $ 74,000.00 $ 2 0221 Temporary Protection and Direction of Traffic LS 1 13,500.00 $ 13,500.00 $ 36,000.00 $ 36,000.00 $ 28,415.58 $ 28,415.58 $ 63,000.00 $ 63,000.00 $ 25,065.00 $ 25,065.00 $ 53,000.00 $ 53,000.00 $ 23,000.00 $ 23,000.00 $ 3 0222 Temporary Signs SF 700 32.50 $ 22,750.00 $ 32.00 $ 22,400.00 $ 22.89 $ 16,023.00 $ 35.00 $ 24,500.00 $ 24.00 $ 16,800.00 $ 23.50 $ 16,450.00 $ 24.00 $ 16,800.00 $ 4 0222 Portable Changeable Message Signs EA 4 3,475.00 $ 13,900.00 $ 4,500.00 $ 18,000.00 $ 5,502.34 $ 22,009.36 $ 3,000.00 $ 12,000.00 $ 3,000.00 $ 12,000.00 $ 2,600.00 $ 10,400.00 $ 2,000.00 $ 8,000.00 $ 5 0224 Temporary Barricades, Type II EA 12 215.00 $ 2,580.00 $ 68.00 $ 816.00 $ 76.70 $ 920.40 $ 60.00 $ 720.00 $ 140.00 $ 1,680.00 $ 176.00 $ 2,112.00 $ 125.00 $ 1,500.00 $ 6 0224 Temporary Barricades, Type III EA 12 400.00 $ 4,800.00 $ 205.00 $ 2,460.00 $ 206.50 $ 2,478.00 $ 120.00 $ 1,440.00 $ 270.00 $ 3,240.00 $ 94.25 $ 1,131.00 $ 425.00 $ 5,100.00 $ 7 0225 Stripe Removal LF 2,816 2.00 $ 5,632.00 $ 2.00 $ 5,632.00 $ 3.24 $ 9,123.84 $ 1.75 $ 4,928.00 $ 3.00 $ 8,448.00 $ 1.75 $ 4,928.00 $ 1.95 $ 5,491.20 $ 8 0225 Legend Removal SF 60 10.00 $ 600.00 $ 5.00 $ 300.00 $ 78.27 $ 4,696.20 $ 9.00 $ 540.00 $ 20.00 $ 1,200.00 $ 9.00 $ 540.00 $ 10.00 $ 600.00 $ 9 0228 Pedestrian Channelizing Devices LF 250 41.00 $ 10,250.00 $ 30.00 $ 7,500.00 $ 25.03 $ 6,257.50 $ 32.00 $ 8,000.00 $ 29.00 $ 7,250.00 $ 38.80 $ 9,700.00 $ 9.25 $ 2,312.50 $ 10 0228 Temporary Curb Ramp, Constructed EA 2 2,800.00 $ 5,600.00 $ 3,800.00 $ 7,600.00 $ 1,416.00 $ 2,832.00 $ 1,200.00 $ 2,400.00 $ 1,988.00 $ 3,976.00 $ 5,200.00 $ 10,400.00 $ 440.00 $ 880.00 $ 11 0280 Erosion Control LS 1 1,500.00 $ 1,500.00 $ 7,000.00 $ 7,000.00 $ 2,840.26 $ 2,840.26 $ 10,000.00 $ 10,000.00 $ 6,000.00 $ 6,000.00 $ 3,000.00 $ 3,000.00 $ 5,500.00 $ 5,500.00 $ 12 0280 Concrete Washout Facility EA 1 650.00 $ 650.00 $ 675.00 $ 675.00 $ 1,150.00 $ 1,150.00 $ 2,500.00 $ 2,500.00 $ 500.00 $ 500.00 $ 1,250.00 $ 1,250.00 $ 1,500.00 $ 1,500.00 $ 13 0280 Inlet Protection, Type 3 EA 6 180.00 $ 1,080.00 $ 71.00 $ 426.00 $ 26.50 $ 159.00 $ 75.00 $ 450.00 $ 100.00 $ 600.00 $ 91.00 $ 546.00 $ 65.00 $ 390.00 $ 14 0280 Inlet Protection, Type 4 EA 1 450.00 $ 450.00 $ 47.00 $ 47.00 $ 42.00 $ 42.00 $ 120.00 $ 120.00 $ 175.00 $ 175.00 $ 70.00 $ 70.00 $ 1,500.00 $ 1,500.00 $ 15 0280 Sediment Barrier, Type 8 LF 362 8.50 $ 3,077.00 $ 8.20 $ 2,968.40 $ 9.68 $ 3,504.16 $ 12.00 $ 4,344.00 $ 8.00 $ 2,896.00 $ 6.80 $ 2,461.60 $ 5.50 $ 1,991.00 $ 16 0290 Pollution Control Plan LS 1 250.00 $ 250.00 $ 500.00 $ 500.00 $ 522.74 $ 522.74 $ 1,500.00 $ 1,500.00 $ 800.00 $ 800.00 $ 280.00 $ 280.00 $ 780.00 $ 780.00 $ 17 0305 Construction Survey Work LS 1 21,775.00 $ 21,775.00 $ 10,000.00 $ 10,000.00 $ 12,980.00 $ 12,980.00 $ 16,000.00 $ 16,000.00 $ 13,000.00 $ 13,000.00 $ 8,200.00 $ 8,200.00 $ 22,000.00 $ 22,000.00 $ 18 0310 Removal of Structures and Obstructions LS 1 5,650.00 $ 5,650.00 $ 13,500.00 $ 13,500.00 $ 16,480.00 $ 16,480.00 $ 24,000.00 $ 24,000.00 $ 12,000.00 $ 12,000.00 $ 12,500.00 $ 12,500.00 $ 23,000.00 $ 23,000.00 $ 19 0320 Clearing and Grubbing LS 1 5,000.00 $ 5,000.00 $ 15,000.00 $ 15,000.00 $ 8,138.00 $ 8,138.00 $ 7,500.00 $ 7,500.00 $ 5,000.00 $ 5,000.00 $ 5,750.00 $ 5,750.00 $ 9,000.00 $ 9,000.00 $ 20 0330 General Excavation CY 730 75.25 $ 54,932.50 $ 75.00 $ 54,750.00 $ 35.91 $ 26,214.30 $ 20.00 $ 14,600.00 $ 115.00 $ 83,950.00 $ 47.75 $ 34,857.50 $ 52.00 $ 37,960.00 $ 21 0331 12 Inch Subgrade Stabilization SY 120 36.00 $ 4,320.00 $ 63.00 $ 7,560.00 $ 41.38 $ 4,965.60 $ 35.00 $ 4,200.00 $ 90.00 $ 10,800.00 $ 37.75 $ 4,530.00 $ 85.00 $ 10,200.00 $ 22 0350 Subgrade Geotextile SY 1,172 2.00 $ 2,344.00 $ 2.00 $ 2,344.00 $ 0.96 $ 1,125.12 $ 2.00 $ 2,344.00 $ 4.00 $ 4,688.00 $ 1.75 $ 2,051.00 $ 6.00 $ 7,032.00 $ 23 0587 Pedestrian Rail LS 1 16,700.00 $ 16,700.00 $ 27,000.00 $ 27,000.00 $ 28,931.00 $ 28,931.00 $ 55,000.00 $ 55,000.00 $ 33,333.00 $ 33,333.00 $ 33,500.00 $ 33,500.00 $ 76,000.00 $ 76,000.00 $ 24 0641 Aggregate Base TON 770 63.50 $ 48,895.00 $ 79.00 $ 60,830.00 $ 57.12 $ 43,982.40 $ 45.00 $ 34,650.00 $ 88.00 $ 67,760.00 $ 77.80 $ 59,906.00 $ 48.00 $ 36,960.00 $ 25 0744 Level 3, 1/2 Inch, ACP Mixture TON 330 141.75 $ 46,777.50 $ 150.00 $ 49,500.00 $ 152.04 $ 50,173.20 $ 130.00 $ 42,900.00 $ 140.00 $ 46,200.00 $ 165.00 $ 54,450.00 $ 208.00 $ 68,640.00 $ 26 0759 Concrete Curbs, Curb and Gutter LF 316 48.00 $ 15,168.00 $ 34.40 $ 10,870.40 $ 24.69 $ 7,802.04 $ 65.00 $ 20,540.00 $ 95.00 $ 30,020.00 $ 58.75 $ 18,565.00 $ 66.00 $ 20,856.00 $ 27 0759 Concrete Curbs, Standard Curb LF 197 45.00 $ 8,865.00 $ 29.50 $ 5,811.50 $ 21.09 $ 4,154.73 $ 60.00 $ 11,820.00 $ 76.00 $ 14,972.00 $ 53.00 $ 10,441.00 $ 60.00 $ 11,820.00 $ 28 0759 Concrete Curbs, Low Profile Mountable Curb LF 176 41.50 $ 7,304.00 $ 27.80 $ 4,892.80 $ 21.06 $ 3,706.56 $ 50.00 $ 8,800.00 $ 53.00 $ 9,328.00 $ 51.00 $ 8,976.00 $ 60.00 $ 10,560.00 $ 29 0759 Concrete Islands SF 255 27.25 $ 6,948.75 $ 17.10 $ 4,360.50 $ 31.44 $ 8,017.20 $ 25.00 $ 6,375.00 $ 38.00 $ 9,690.00 $ 30.00 $ 7,650.00 $ 20.00 $ 5,100.00 $ 30 0759 Concrete Walks SF 3,360 11.25 $ 37,800.00 $ 7.50 $ 25,200.00 $ 12.96 $ 43,545.60 $ 15.00 $ 50,400.00 $ 17.00 $ 57,120.00 $ 11.50 $ 38,640.00 $ 15.00 $ 50,400.00 $ 31 0759 Truck Apron Concrete Surfacing SF 1,437 17.25 $ 24,788.25 $ 12.00 $ 17,244.00 $ 16.11 $ 23,150.07 $ 20.00 $ 28,740.00 $ 17.00 $ 24,429.00 $ 17.00 $ 24,429.00 $ 22.00 $ 31,614.00 $ 32 0759 Extra for New Curb Ramps EA 5 1,700.00 $ 8,500.00 $ 910.00 $ 4,550.00 $ 1,723.60 $ 8,618.00 $ 2,500.00 $ 12,500.00 $ 950.00 $ 4,750.00 $ 1,000.00 $ 5,000.00 $ 3,000.00 $ 15,000.00 $ 33 0759 Truncated Domes On New Surfaces SF 87 37.25 $ 3,240.75 $ 30.00 $ 2,610.00 $ 40.72 $ 3,542.64 $ 60.00 $ 5,220.00 $ 70.00 $ 6,090.00 $ 35.00 $ 3,045.00 $ 45.00 $ 3,915.00 $ 34 0810 Guardrail Terminals, Non-flared MSKT EA 1 6,850.00 $ 6,850.00 $ 3,500.00 $ 3,500.00 $ 9,440.00 $ 9,440.00 $ 6,300.00 $ 6,300.00 $ 8,000.00 $ 8,000.00 $ 7,500.00 $ 7,500.00 $ 8,500.00 $ 8,500.00 $ 35 0810 Extra for Hand Dug Guardrail Post Holes EA 4 400.00 $ 1,600.00 $ 200.00 $ 800.00 $ 383.50 $ 1,534.00 $ 375.00 $ 1,500.00 $ 600.00 $ 2,400.00 $ 300.00 $ 1,200.00 $ 350.00 $ 1,400.00 $ 36 0810 Midwest Guardrail System, Type 2A LF 32 100.00 $ 3,200.00 $ 50.00 $ 1,600.00 $ 95.56 $ 3,057.92 $ 95.00 $ 3,040.00 $ 198.00 $ 6,336.00 $ 195.00 $ 6,240.00 $ 214.00 $ 6,848.00 $ 37 0810 Guardrail Height Conversion, Type 2A EA 1 2,125.00 $ 2,125.00 $ 2,500.00 $ 2,500.00 $ 2,030.00 $ 2,030.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 4,675.00 $ 4,675.00 $ 5,200.00 $ 5,200.00 $ 38 0855 Bi-Directional Yellow Type I Markers EA 2 31.00 $ 62.00 $ 10.00 $ 20.00 $ 30.00 $ 60.00 $ 30.00 $ 60.00 $ 88.00 $ 176.00 $ 29.00 $ 58.00 $ 32.00 $ 64.00 $ 39 0856 Permanent Surface Mounted Tubular Markers EA 5 310.00 $ 1,550.00 $ 100.00 $ 500.00 $ 295.00 $ 1,475.00 $ 275.00 $ 1,375.00 $ 300.00 $ 1,500.00 $ 290.00 $ 1,450.00 $ 325.00 $ 1,625.00 $ 40 0858 Surface Mounted Plastic Curb with Tubular Marker EA 69 700.00 $ 48,300.00 $ 250.00 $ 17,250.00 $ 649.00 $ 44,781.00 $ 600.00 $ 41,400.00 $ 580.00 $ 40,020.00 $ 650.00 $ 44,850.00 $ 715.00 $ 49,335.00 $ 41 0860 Longitudinal Pavement Markings - Paint LF 55 5.00 $ 275.00 $ 5.00 $ 275.00 $ 4.73 $ 260.15 $ 5.00 $ 275.00 $ 8.00 $ 440.00 $ 4.50 $ 247.50 $ 5.00 $ 275.00 $ 42 0865 Thermoplastic, Extruded, Surface, Non-Profiled LF 4,375 3.00 $ 13,125.00 $ 8.00 $ 35,000.00 $ 2.66 $ 11,637.50 $ 2.40 $ 10,500.00 $ 2.00 $ 8,750.00 $ 2.75 $ 12,031.25 $ 3.00 $ 13,125.00 $ 43 0867 Pavement Legend, Type B-HS: Arrows EA 1 500.00 $ 500.00 $ 350.00 $ 350.00 $ 442.50 $ 442.50 $ 400.00 $ 400.00 $ 500.00 $ 500.00 $ 440.00 $ 440.00 $ 450.00 $ 450.00 $ 44 0867 Pavement Legend, Type B-HS: "SCHOOL" EA 1 2,400.00 $ 2,400.00 $ 750.00 $ 750.00 $ 2,218.40 $ 2,218.40 $ 2,100.00 $ 2,100.00 $ 2,000.00 $ 2,000.00 $ 2,200.00 $ 2,200.00 $ 2,500.00 $ 2,500.00 $ 45 0867 Pavement Legend, Type B-HS: Shared Use Path Pedestrian Stencil EA 2 600.00 $ 1,200.00 $ 500.00 $ 1,000.00 $ 590.00 $ 1,180.00 $ 550.00 $ 1,100.00 $ 600.00 $ 1,200.00 $ 585.00 $ 1,170.00 $ 650.00 $ 1,300.00 $ 46 0867 Pavement Legend, Type B-HS: Shared Use Path Bicycle Stencil EA 2 600.00 $ 1,200.00 $ 500.00 $ 1,000.00 $ 590.00 $ 1,180.00 $ 550.00 $ 1,100.00 $ 600.00 $ 1,200.00 $ 585.00 $ 1,170.00 $ 650.00 $ 1,300.00 $ 47 0867 Pavement Bar, Type B-HS SF 298 23.00 $ 6,854.00 $ 8.00 $ 2,384.00 $ 22.51 $ 6,707.98 $ 20.00 $ 5,960.00 $ 18.00 $ 5,364.00 $ 21.50 $ 6,407.00 $ 25.00 $ 7,450.00 $ 48 0902 Crosswalk Closure Supports EA 2 1,150.00 $ 2,300.00 $ 1,143.00 $ 2,286.00 $ 1,048.00 $ 2,096.00 $ 1,300.00 $ 2,600.00 $ 900.00 $ 1,800.00 $ 700.00 $ 1,400.00 $ 1,400.00 $ 2,800.00 $ 49 0905 Remove Existing Signs LS 1 1,225.00 $ 1,225.00 $ 875.00 $ 875.00 $ 679.68 $ 679.68 $ 1,000.00 $ 1,000.00 $ 7,000.00 $ 7,000.00 $ 350.00 $ 350.00 $ 2,000.00 $ 2,000.00 $ 50 0920 Sign Support Footings LS 1 2,950.00 $ 2,950.00 $ 2,922.00 $ 2,922.00 $ 1,672.00 $ 1,672.00 $ 3,300.00 $ 3,300.00 $ 16,000.00 $ 16,000.00 $ 350.00 $ 350.00 $ 4,000.00 $ 4,000.00 $ 51 0930 Perforated Steel Square Tube Slip Base Sign Supports LS 1 5,200.00 $ 5,200.00 $ 4,012.00 $ 4,012.00 $ 4,806.00 $ 4,806.00 $ 4,500.00 $ 4,500.00 $ 3,800.00 $ 3,800.00 $ 350.00 $ 350.00 $ 3,500.00 $ 3,500.00 $ 52 0930 Perforated Steel Square Tube Anchor Sign Supports LS 1 2,275.00 $ 2,275.00 $ 1,951.00 $ 1,951.00 $ 1,446.68 $ 1,446.68 $ 2,100.00 $ 2,100.00 $ 11,000.00 $ 11,000.00 $ 350.00 $ 350.00 $ 1,500.00 $ 1,500.00 $ 53 0940 Signs, Standard Sheeting, Sheet Aluminum SF 76 34.00 $ 2,584.00 $ 36.00 $ 2,736.00 $ 18.88 $ 1,434.88 $ 40.00 $ 3,040.00 $ 54.00 $ 4,104.00 $ 23.50 $ 1,786.00 $ 150.00 $ 11,400.00 $ 54 0970 Pole Foundations LS 1 2,350.00 $ 2,350.00 $ 1,900.00 $ 1,900.00 $ 5,305.00 $ 5,305.00 $ 3,000.00 $ 3,000.00 $ 5,000.00 $ 5,000.00 $ 2,200.00 $ 2,200.00 $ 2,500.00 $ 2,500.00 $ 55 0970 Lighting Poles and Arms LS 1 875.00 $ 875.00 $ 700.00 $ 700.00 $ 9,385.00 $ 9,385.00 $ 6,000.00 $ 6,000.00 $ 1,500.00 $ 1,500.00 $ 815.00 $ 815.00 $ 1,000.00 $ 1,000.00 $ 56 0970 Luminaires, Lamps, and Ballasts LS 1 5,400.00 $ 5,400.00 $ 4,350.00 $ 4,350.00 $ 3,350.00 $ 3,350.00 $ 3,000.00 $ 3,000.00 $ 6,000.00 $ 6,000.00 $ 5,000.00 $ 5,000.00 $ 5,500.00 $ 5,500.00 $ 57 0970 Switching, Conduit, and Wiring LS 1 10,600.00 $ 10,600.00 $ 8,550.00 $ 8,550.00 $ 3,528.00 $ 3,528.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 9,950.30 $ 9,950.30 $ 12,000.00 $ 12,000.00 $ 58 1030 Permanent Seeding SY 461 7.00 $ 3,227.00 $ 3.60 $ 1,659.60 $ 4.25 $ 1,959.25 $ 5.00 $ 2,305.00 $ 22.00 $ 10,142.00 $ 5.85 $ 2,696.85 $ 12.00 $ 5,532.00 $ 59 1040 Topsoil CY 52 110.00 $ 5,720.00 $ 88.00 $ 4,576.00 $ 103.82 $ 5,398.64 $ 70.00 $ 3,640.00 $ 298.00 $ 15,496.00 $ 58.50 $ 3,042.00 $ 150.00 $ 7,800.00 $ TOTAL: 569,574.75 $ TOTAL: 589,794.20 $ TOTAL: 610,675.68 $ TOTAL: 669,626.00 $ TOTAL: 771,988.00 $ TOTAL: 688,688.00 $ TOTAL: 748,305.70 $ Pacific Excavation Western United Civil Group Turney Excavation, Inc. Kerr Contractors Civil West Construction K&E Excavating Inc. Brown Contracting WOODBURN HIGH SCHOOL FRONT STREET SAFE ROUTES TO SCHOOLS PROJECT BID TAB