Full Text
Item No. Description Quantity Unit Unit Price Total Unit Price Total Unit Price Total 1 Mobilization 1 LS 28,796.75 $ 28,796.75 $ 10,000.00 $ 10,000.00 $ 13,000.00 $ 13,000.00 $ 2 Temporary Protection and Direction of Traffic 1 LS 1,767.15 $ 1,767.15 $ 15,000.00 $ 15,000.00 $ 9,000.00 $ 9,000.00 $ 3 Inlet Protection, Type 3 (00280) 4 ES 25.50 $ 102.00 $ 400.00 $ 1,600.00 $ 100.00 $ 400.00 $ 4 General Excavation (00330) 11 CY 742.00 $ 8,162.00 $ 500.00 $ 5,500.00 $ 100.00 $ 1,100.00 $ 5 Aggregate Base (00641) 45 TN 154.09 $ 6,934.05 $ 115.00 $ 5,175.00 $ 80.00 $ 3,600.00 $ 6 Crushed Stone Path (00641) 500 SF 1.94 $ 970.00 $ 15.00 $ 7,500.00 $ 4.00 $ 2,000.00 $ 7 Level 2, 1/2-Inch Dense ACP (00744) 34 TN 240.35 $ 8,171.90 $ 350.00 $ 11,900.00 $ 400.00 $ 13,600.00 $ 8 Concrete Curb, Type A (00759) 137 LF 42.00 $ 5,754.00 $ 50.00 $ 6,850.00 $ 60.00 $ 8,220.00 $ 9 Concrete Curb, Type C (00759) 35 LF 36.75 $ 1,286.25 $ 50.00 $ 1,750.00 $ 60.00 $ 2,100.00 $ 10 Concrete Walks (00759) 873 SF 18.38 $ 16,045.74 $ 26.00 $ 22,698.00 $ 16.00 $ 13,968.00 $ 11 Concrete Islands (00759) 154 SF 18.80 $ 2,895.20 $ 20.00 $ 3,080.00 $ 21.00 $ 3,234.00 $ 12 Truncated Domes on New Surfaces (00759) 133 SF 35.00 $ 4,655.00 $ 55.00 $ 7,315.00 $ 50.00 $ 6,650.00 $ 13 Extra for New Curb Ramps (00759) 9 EA 604.63 $ 5,441.67 $ 500.00 $ 4,500.00 $ 2,000.00 $ 18,000.00 $ 14 Longitudinal Pavement Markings - Paint (00860) 400 LF 5.51 $ 2,204.00 $ 10.00 $ 4,000.00 $ 4.00 $ 1,600.00 $ 15 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 504 SF 5.28 $ 2,661.12 $ 8.00 $ 4,032.00 $ 25.00 $ 12,600.00 $ 16 Pavement Bar, Type B-HS: Stop Bar (00867) 9 SF 17.60 $ 158.40 $ 50.00 $ 450.00 $ 30.00 $ 270.00 $ 17 Perforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 1,018.60 $ 1,018.60 $ 300.00 $ 300.00 $ 5,000.00 $ 5,000.00 $ 18 Signs, Standard Sheeting, Extruded Aluminum (00940) 39 SF 24.20 $ 943.80 $ 75.00 $ 2,925.00 $ 60.00 $ 2,340.00 $ TOTAL: 97,967.63 $ TOTAL: 114,575.00 $ TOTAL: 116,682.00 $ Red text indicates there was a discrepancy between unit prices and extended amounts. BID TABULATION TTE Inc. D&D Concrete and Utilities 2026 ADA Curb Ramp Retrofit Civil West LLC City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -1 ---PAGE BREAK--- Item No. Description Quantity Unit 1 Mobilization 1 LS 2 Temporary Protection and Direction of Traffic 1 LS 3 Inlet Protection, Type 3 (00280) 4 ES 4 General Excavation (00330) 11 CY 5 Aggregate Base (00641) 45 TN 6 Crushed Stone Path (00641) 500 SF 7 Level 2, 1/2-Inch Dense ACP (00744) 34 TN 8 Concrete Curb, Type A (00759) 137 LF 9 Concrete Curb, Type C (00759) 35 LF 10 Concrete Walks (00759) 873 SF 11 Concrete Islands (00759) 154 SF 12 Truncated Domes on New Surfaces (00759) 133 SF 13 Extra for New Curb Ramps (00759) 9 EA 14 Longitudinal Pavement Markings - Paint (00860) 400 LF 15 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 504 SF 16 Pavement Bar, Type B-HS: Stop Bar (00867) 9 SF 17 Perforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 18 Signs, Standard Sheeting, Extruded Aluminum (00940) 39 SF Red text indicates there was a discrepancy between unit prices and extended amounts. BID TABULATION 2026 ADA Curb Ramp Retrofit Unit Price Total Unit Price Total Unit Price Total 14,646.00 $ 14,646.00 $ 5,000.00 $ 5,000.00 $ 12,000.00 $ 12,000.00 $ 10,502.00 $ 10,502.00 $ 10,000.00 $ 10,000.00 $ 8,073.00 $ 8,073.00 $ 108.00 $ 432.00 $ 100.00 $ 400.00 $ 80.00 $ 320.00 $ 775.00 $ 8,525.00 $ 100.00 $ 1,100.00 $ 423.00 $ 4,653.00 $ 128.00 $ 5,760.00 $ 100.00 $ 4,500.00 $ 155.00 $ 6,975.00 $ 6.00 $ 3,000.00 $ 5.00 $ 2,500.00 $ 7.00 $ 3,500.00 $ 425.00 $ 14,450.00 $ 300.00 $ 10,200.00 $ 420.00 $ 14,280.00 $ 61.00 $ 8,357.00 $ 50.00 $ 6,850.00 $ 55.00 $ 7,535.00 $ 53.00 $ 1,855.00 $ 50.00 $ 1,750.00 $ 80.00 $ 2,800.00 $ 19.00 $ 16,587.00 $ 50.00 $ 43,650.00 $ 25.00 $ 21,825.00 $ 29.00 $ 4,466.00 $ 20.00 $ 3,080.00 $ 38.00 $ 5,852.00 $ 47.00 $ 6,251.00 $ 40.00 $ 5,320.00 $ 40.00 $ 5,320.00 $ 554.00 $ 4,986.00 $ 1,000.00 $ 9,000.00 $ 1,500.00 $ 13,500.00 $ 4.00 $ 1,600.00 $ 4.50 $ 1,800.00 $ 4.00 $ 1,600.00 $ 26.00 $ 13,104.00 $ 21.50 $ 10,836.00 $ 20.00 $ 10,080.00 $ 30.00 $ 270.00 $ 25.00 $ 225.00 $ 35.00 $ 315.00 $ 3,504.00 $ 3,504.00 $ 3,500.00 $ 3,500.00 $ 3,700.00 $ 3,700.00 $ 60.00 $ 2,340.00 $ 100.00 $ 3,900.00 $ 40.00 $ 1,560.00 $ TOTAL: 120,635.00 $ TOTAL: 123,611.00 $ TOTAL: 123,888.00 $ Brown Contracting Pacific Excavation Inc. KNL Industries Inc. City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -2 ---PAGE BREAK--- Item No. Description Quantity Unit 1 Mobilization 1 LS 2 Temporary Protection and Direction of Traffic 1 LS 3 Inlet Protection, Type 3 (00280) 4 ES 4 General Excavation (00330) 11 CY 5 Aggregate Base (00641) 45 TN 6 Crushed Stone Path (00641) 500 SF 7 Level 2, 1/2-Inch Dense ACP (00744) 34 TN 8 Concrete Curb, Type A (00759) 137 LF 9 Concrete Curb, Type C (00759) 35 LF 10 Concrete Walks (00759) 873 SF 11 Concrete Islands (00759) 154 SF 12 Truncated Domes on New Surfaces (00759) 133 SF 13 Extra for New Curb Ramps (00759) 9 EA 14 Longitudinal Pavement Markings - Paint (00860) 400 LF 15 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 504 SF 16 Pavement Bar, Type B-HS: Stop Bar (00867) 9 SF 17 Perforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 18 Signs, Standard Sheeting, Extruded Aluminum (00940) 39 SF Red text indicates there was a discrepancy between unit prices and extended amounts. BID TABULATION 2026 ADA Curb Ramp Retrofit Unit Price Total Unit Price Total Unit Price Total 22,500.00 $ 22,500.00 $ 13,000.00 $ 13,000.00 $ 10,665.00 $ 10,665.00 $ 5,500.00 $ 5,500.00 $ 20,400.00 $ 20,400.00 $ 5,045.00 $ 5,045.00 $ 110.00 $ 440.00 $ 500.00 $ 2,000.00 $ 118.00 $ 472.00 $ 450.00 $ 4,950.00 $ 528.00 $ 5,808.00 $ 1,450.00 $ 15,950.00 $ 125.00 $ 5,625.00 $ 234.00 $ 10,530.00 $ 241.00 $ 10,845.00 $ 6.00 $ 3,000.00 $ 1.00 $ 500.00 $ 15.00 $ 7,500.00 $ 275.00 $ 9,350.00 $ 102.00 $ 3,468.00 $ 435.50 $ 14,807.00 $ 63.75 $ 8,733.75 $ 151.00 $ 20,687.00 $ 68.00 $ 9,316.00 $ 63.75 $ 2,231.25 $ 146.00 $ 5,110.00 $ 60.50 $ 2,117.50 $ 25.75 $ 22,479.75 $ 10.00 $ 8,730.00 $ 29.00 $ 25,317.00 $ 30.75 $ 4,735.50 $ 96.00 $ 14,784.00 $ 46.50 $ 7,161.00 $ 40.50 $ 5,386.50 $ 94.00 $ 12,502.00 $ 36.00 $ 4,788.00 $ 1,500.00 $ 13,500.00 $ 25.00 $ 225.00 $ 2,219.00 $ 19,971.00 $ 2.00 $ 800.00 $ 5.00 $ 2,000.00 $ 4.25 $ 1,700.00 $ 19.50 $ 9,828.00 $ 20.00 $ 10,080.00 $ 26.00 $ 13,104.00 $ 18.75 $ 168.75 $ 60.00 $ 540.00 $ 30.25 $ 272.25 $ 3,500.00 $ 3,500.00 $ 2,000.00 $ 2,000.00 $ 2,941.00 $ 2,941.00 $ 38.50 $ 1,501.50 $ 50.00 $ 1,950.00 $ 7.60 $ 296.40 $ TOTAL: 124,230.00 $ TOTAL: 134,314.00 $ TOTAL: 152,268.15 $ Turney Excavating Inc. Lee Contractors SLE, Inc. City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -3 ---PAGE BREAK--- Item No. Description Quantity Unit 1 Mobilization 1 LS 2 Temporary Protection and Direction of Traffic 1 LS 3 Inlet Protection, Type 3 (00280) 4 ES 4 General Excavation (00330) 11 CY 5 Aggregate Base (00641) 45 TN 6 Crushed Stone Path (00641) 500 SF 7 Level 2, 1/2-Inch Dense ACP (00744) 34 TN 8 Concrete Curb, Type A (00759) 137 LF 9 Concrete Curb, Type C (00759) 35 LF 10 Concrete Walks (00759) 873 SF 11 Concrete Islands (00759) 154 SF 12 Truncated Domes on New Surfaces (00759) 133 SF 13 Extra for New Curb Ramps (00759) 9 EA 14 Longitudinal Pavement Markings - Paint (00860) 400 LF 15 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 504 SF 16 Pavement Bar, Type B-HS: Stop Bar (00867) 9 SF 17 Perforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 18 Signs, Standard Sheeting, Extruded Aluminum (00940) 39 SF Red text indicates there was a discrepancy between unit prices and extended amounts. BID TABULATION 2026 ADA Curb Ramp Retrofit Unit Price Total Unit Price Total 10,550.00 $ 10,550.00 $ 20,795.00 $ 20,795.00 $ 17,500.00 $ 17,500.00 $ 9,636.00 $ 9,636.00 $ 302.50 $ 1,210.00 $ 250.00 $ 1,000.00 $ 582.00 $ 6,402.00 $ 449.00 $ 4,939.00 $ 113.06 $ 5,087.70 $ 162.90 $ 7,330.50 $ 6.49 $ 3,245.00 $ 9.80 $ 4,900.00 $ 428.24 $ 14,560.16 $ 501.60 $ 17,054.40 $ 174.00 $ 23,838.00 $ 130.60 $ 17,892.20 $ 186.00 $ 6,510.00 $ 169.00 $ 5,915.00 $ 39.00 $ 34,047.00 $ 31.80 $ 27,761.40 $ 52.00 $ 8,008.00 $ 38.20 $ 5,882.80 $ 105.00 $ 13,965.00 $ 54.80 $ 7,288.40 $ 117.00 $ 1,053.00 $ 1,887.70 $ 16,989.30 $ 6.78 $ 2,712.00 $ 1.96 $ 784.00 $ 15.68 $ 7,902.72 $ 19.90 $ 10,029.60 $ 27.87 $ 250.83 $ 19.50 $ 175.50 $ 6,050.00 $ 6,050.00 $ 10,300.00 $ 10,300.00 $ 89.56 $ 3,492.84 $ 50.10 $ 1,953.90 $ TOTAL: 166,384.25 $ TOTAL: 170,627.00 $ Alpha Environmental Services Knife River Corp NW City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -4