← Back to Woodburn

Document Woodburn_doc_1ebb28db7f

Full Text

Item No. Description Quantity Unit UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1 Mobilization 1 LS 23,000.00 $ 23,000.00 $ 45,600.50 $ 45,600.50 $ 85,000.00 $ 85,000.00 $ 2 Temporary Protection and Direction of Traffic 1 LS 23,000.00 $ 23,000.00 $ 10,500.00 $ 10,500.00 $ 10,800.00 $ 10,800.00 $ 3 Erosion Control (00280) 1 LS 4,250.00 $ 4,250.00 $ 1,350.00 $ 1,350.00 $ 1,620.00 $ 1,620.00 $ 4 General Excavation (00330) 18 CY 49.50 $ 891.00 $ 57.00 $ 1,026.00 $ 178.20 $ 3,207.60 $ 5 Subgrade Stabilization (00331) 50 CY 49.50 $ 2,475.00 $ 96.50 $ 4,825.00 $ 81.00 $ 4,050.00 $ 6 Pavement Overlay Geotextile (00350) 3,140 SY 4.60 $ 14,444.00 $ 3.50 $ 10,990.00 $ 4.56 $ 14,318.40 $ 7 18 inch PVC F679 Sanitary Sewer Pipe, 15 foot depth (00445) 1,111 LF 242.50 $ 269,417.50 $ 250.00 $ 277,750.00 $ 286.20 $ 317,968.20 $ 8 Concrete Manhole, 48 Inch (00470) 4 EA 8,860.00 $ 35,440.00 $ 11,900.00 $ 47,600.00 $ 10,260.00 $ 41,040.00 $ 9 Connection to Existing Structures (00490) 2 EA 2,040.00 $ 4,080.00 $ 7,000.00 $ 14,000.00 $ 9,720.00 $ 19,440.00 $ 10 Cold Plane Pavement Removal, 0-2" (00620) 3140 SY 5.50 $ 17,270.00 $ 6.00 $ 18,840.00 $ 2.81 $ 8,823.40 $ 11 Aggregate Base (00641) 25 TN 42.00 $ 1,050.00 $ 61.50 $ 1,537.50 $ 59.40 $ 1,485.00 $ 12 Level 2, 1/2-Inch Dense ACP (00744) 458 TN 100.00 $ 45,800.00 $ 100.00 $ 45,800.00 $ 128.95 $ 59,059.10 $ 13 Concrete Curb, Type A (00759) 118 LF 90.00 $ 10,620.00 $ 72.50 $ 8,555.00 $ 49.68 $ 5,862.24 $ 14 Concrete Curb, Type C (00759) 67 LF 68.50 $ 4,589.50 $ 66.00 $ 4,422.00 $ 38.88 $ 2,604.96 $ 15 Monolithic Curb and Sidewalk (00759) 845 SF 21.75 $ 18,378.75 $ 28.00 $ 23,660.00 $ 24.84 $ 20,989.80 $ 16 Truncated Domes on New Surfaces (00759) 90 SF 46.75 $ 4,207.50 $ 31.50 $ 2,835.00 $ 39.96 $ 3,596.40 $ 17 Extra for New Curb Ramps (00759) 9 EA 1,176.75 $ 10,590.75 $ 1,350.00 $ 12,150.00 $ 349.92 $ 3,149.28 $ 18 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 234 SF 16.50 $ 3,861.00 $ 15.00 $ 3,510.00 $ 16.36 $ 3,828.24 $ 19 Remove and Reinstall Existing Signs (00900) 1 LS 1,025.00 $ 1,025.00 $ 800.00 $ 800.00 $ 1,296.00 $ 1,296.00 $ 20 Crosswalk Closed Sign Supports (00930) 2 EA 515.00 $ 1,030.00 $ 950.00 $ 1,900.00 $ 1,296.00 $ 2,592.00 $ 21 Peforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 1,025.00 $ 1,025.00 $ 750.00 $ 750.00 $ 324.00 $ 324.00 $ 22 Signs, Standard Sheeting, Extruded Aluminum (00940) 26 SF 40.00 $ 1,040.00 $ 20.00 $ 520.00 $ 135.00 $ 3,510.00 $ 497,485.00 $ 538,921.00 $ 614,564.62 $ Dalke Construction Lawson Corp N Santiam Paving First Street Sanitary Sewer Bypass BID TABULATION City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -1 ---PAGE BREAK--- Item No. Description Quantity Unit 1 Mobilization 1 LS 2 Temporary Protection and Direction of Traffic 1 LS 3 Erosion Control (00280) 1 LS 4 General Excavation (00330) 18 CY 5 Subgrade Stabilization (00331) 50 CY 6 Pavement Overlay Geotextile (00350) 3,140 SY 7 18 inch PVC F679 Sanitary Sewer Pipe, 15 foot depth (00445) 1,111 LF 8 Concrete Manhole, 48 Inch (00470) 4 EA 9 Connection to Existing Structures (00490) 2 EA 10 Cold Plane Pavement Removal, 0-2" (00620) 3140 SY 11 Aggregate Base (00641) 25 TN 12 Level 2, 1/2-Inch Dense ACP (00744) 458 TN 13 Concrete Curb, Type A (00759) 118 LF 14 Concrete Curb, Type C (00759) 67 LF 15 Monolithic Curb and Sidewalk (00759) 845 SF 16 Truncated Domes on New Surfaces (00759) 90 SF 17 Extra for New Curb Ramps (00759) 9 EA 18 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 234 SF 19 Remove and Reinstall Existing Signs (00900) 1 LS 20 Crosswalk Closed Sign Supports (00930) 2 EA 21 Peforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 22 Signs, Standard Sheeting, Extruded Aluminum (00940) 26 SF First Street Sanitary Sewer Bypass BID TABULATION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 50,000.00 $ 50,000.00 $ 47,000.00 $ 47,000.00 $ 59,688.00 $ 59,688.00 $ 7,500.00 $ 7,500.00 $ 6,800.00 $ 6,800.00 $ 12,960.00 $ 12,960.00 $ 2,250.00 $ 2,250.00 $ 1,750.00 $ 1,750.00 $ 8,910.00 $ 8,910.00 $ 142.25 $ 2,560.50 $ 145.00 $ 2,610.00 $ 61.00 $ 1,098.00 $ 120.50 $ 6,025.00 $ 105.00 $ 5,250.00 $ 64.00 $ 3,200.00 $ 4.25 $ 13,345.00 $ 4.25 $ 13,345.00 $ 4.00 $ 12,560.00 $ 301.75 $ 335,244.25 $ 345.00 $ 383,295.00 $ 331.00 $ 367,741.00 $ 11,400.00 $ 45,600.00 $ 11,500.00 $ 46,000.00 $ 9,740.00 $ 38,960.00 $ 5,100.00 $ 10,200.00 $ 6,500.00 $ 13,000.00 $ 10,755.00 $ 21,510.00 $ 4.75 $ 14,915.00 $ 6.00 $ 18,840.00 $ 3.00 $ 9,420.00 $ 111.50 $ 2,787.50 $ 105.00 $ 2,625.00 $ 78.00 $ 1,950.00 $ 155.00 $ 70,990.00 $ 150.00 $ 68,700.00 $ 151.00 $ 69,158.00 $ 62.00 $ 7,316.00 $ 60.00 $ 7,080.00 $ 54.00 $ 6,372.00 $ 89.00 $ 5,963.00 $ 45.00 $ 3,015.00 $ 56.00 $ 3,752.00 $ 31.75 $ 26,828.75 $ 20.00 $ 16,900.00 $ 19.00 $ 16,055.00 $ 39.00 $ 3,510.00 $ 34.00 $ 3,060.00 $ 48.00 $ 4,320.00 $ 2,550.00 $ 22,950.00 $ 705.00 $ 6,345.00 $ 1,535.00 $ 13,815.00 $ 18.00 $ 4,212.00 $ 18.00 $ 4,212.00 $ 19.00 $ 4,446.00 $ 1,575.00 $ 1,575.00 $ 1,050.00 $ 1,050.00 $ 665.00 $ 665.00 $ 1,400.00 $ 2,800.00 $ 1,500.00 $ 3,000.00 $ 1,195.00 $ 2,390.00 $ 1,300.00 $ 1,300.00 $ 1,300.00 $ 1,300.00 $ 775.00 $ 775.00 $ 50.00 $ 1,300.00 $ 14.00 $ 364.00 $ 30.00 $ 780.00 $ 639,172.00 $ 655,541.00 $ 660,525.00 $ Turney Excavating Grade Werks Canby Excavating City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -2 ---PAGE BREAK--- Item No. Description Quantity Unit 1 Mobilization 1 LS 2 Temporary Protection and Direction of Traffic 1 LS 3 Erosion Control (00280) 1 LS 4 General Excavation (00330) 18 CY 5 Subgrade Stabilization (00331) 50 CY 6 Pavement Overlay Geotextile (00350) 3,140 SY 7 18 inch PVC F679 Sanitary Sewer Pipe, 15 foot depth (00445) 1,111 LF 8 Concrete Manhole, 48 Inch (00470) 4 EA 9 Connection to Existing Structures (00490) 2 EA 10 Cold Plane Pavement Removal, 0-2" (00620) 3140 SY 11 Aggregate Base (00641) 25 TN 12 Level 2, 1/2-Inch Dense ACP (00744) 458 TN 13 Concrete Curb, Type A (00759) 118 LF 14 Concrete Curb, Type C (00759) 67 LF 15 Monolithic Curb and Sidewalk (00759) 845 SF 16 Truncated Domes on New Surfaces (00759) 90 SF 17 Extra for New Curb Ramps (00759) 9 EA 18 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 234 SF 19 Remove and Reinstall Existing Signs (00900) 1 LS 20 Crosswalk Closed Sign Supports (00930) 2 EA 21 Peforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 22 Signs, Standard Sheeting, Extruded Aluminum (00940) 26 SF First Street Sanitary Sewer Bypass BID TABULATION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 50,000.00 $ 50,000.00 $ 65,000.00 $ 65,000.00 $ 72,000.00 $ 72,000.00 $ 36,000.00 $ 36,000.00 $ 25,000.00 $ 25,000.00 $ 3,000.00 $ 3,000.00 $ 16,000.00 $ 16,000.00 $ 10,000.00 $ 10,000.00 $ 3,050.00 $ 3,050.00 $ 3,100.00 $ 3,100.00 $ 9,500.00 $ 9,500.00 $ 10,000.00 $ 10,000.00 $ 100.00 $ 1,800.00 $ 50.00 $ 900.00 $ 70.00 $ 1,260.00 $ 100.00 $ 1,800.00 $ 122.00 $ 6,100.00 $ 69.00 $ 3,450.00 $ 110.00 $ 5,500.00 $ 50.00 $ 2,500.00 $ 3.50 $ 10,990.00 $ 5.20 $ 16,328.00 $ 3.50 $ 10,990.00 $ 4.00 $ 12,560.00 $ 385.00 $ 427,735.00 $ 373.00 $ 414,403.00 $ 370.00 $ 411,070.00 $ 374.00 $ 415,514.00 $ 11,500.00 $ 46,000.00 $ 11,000.00 $ 44,000.00 $ 16,000.00 $ 64,000.00 $ 15,000.00 $ 60,000.00 $ 4,000.00 $ 8,000.00 $ 3,000.00 $ 6,000.00 $ 8,000.00 $ 16,000.00 $ 6,000.00 $ 12,000.00 $ 7.60 $ 23,864.00 $ 6.10 $ 19,154.00 $ 4.00 $ 12,560.00 $ 5.00 $ 15,700.00 $ 92.00 $ 2,300.00 $ 48.00 $ 1,200.00 $ 75.00 $ 1,875.00 $ 70.00 $ 1,750.00 $ 140.00 $ 64,120.00 $ 163.00 $ 74,654.00 $ 125.00 $ 57,250.00 $ 150.00 $ 68,700.00 $ 72.00 $ 8,496.00 $ 71.00 $ 8,378.00 $ 90.00 $ 10,620.00 $ 100.00 $ 11,800.00 $ 59.50 $ 3,986.50 $ 56.00 $ 3,752.00 $ 60.00 $ 4,020.00 $ 100.00 $ 6,700.00 $ 20.00 $ 16,900.00 $ 36.00 $ 30,420.00 $ 12.00 $ 10,140.00 $ 55.00 $ 46,475.00 $ 45.70 $ 4,113.00 $ 43.00 $ 3,870.00 $ 55.00 $ 4,950.00 $ 70.00 $ 6,300.00 $ 500.00 $ 4,500.00 $ 2,140.00 $ 19,260.00 $ 2,100.00 $ 18,900.00 $ 1,200.00 $ 10,800.00 $ 17.00 $ 3,978.00 $ 16.00 $ 3,744.00 $ 15.00 $ 3,510.00 $ 16.00 $ 3,744.00 $ 1,350.00 $ 1,350.00 $ 623.00 $ 623.00 $ 300.00 $ 300.00 $ 2,000.00 $ 2,000.00 $ 1,085.00 $ 2,170.00 $ 762.00 $ 1,524.00 $ 1,500.00 $ 3,000.00 $ 1,000.00 $ 2,000.00 $ 1,100.00 $ 1,100.00 $ 870.00 $ 870.00 $ 2,000.00 $ 2,000.00 $ 1,000.00 $ 1,000.00 $ 30.00 $ 780.00 $ 28.00 $ 728.00 $ 45.00 $ 1,170.00 $ 100.00 $ 2,600.00 $ 716,332.50 $ 724,358.00 $ 736,615.00 $ 739,943.00 $ Gelco Construction Braun Construction K&E Excavating Titan Utilities City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -3 ---PAGE BREAK--- Item No. Description Quantity Unit 1 Mobilization 1 LS 2 Temporary Protection and Direction of Traffic 1 LS 3 Erosion Control (00280) 1 LS 4 General Excavation (00330) 18 CY 5 Subgrade Stabilization (00331) 50 CY 6 Pavement Overlay Geotextile (00350) 3,140 SY 7 18 inch PVC F679 Sanitary Sewer Pipe, 15 foot depth (00445) 1,111 LF 8 Concrete Manhole, 48 Inch (00470) 4 EA 9 Connection to Existing Structures (00490) 2 EA 10 Cold Plane Pavement Removal, 0-2" (00620) 3140 SY 11 Aggregate Base (00641) 25 TN 12 Level 2, 1/2-Inch Dense ACP (00744) 458 TN 13 Concrete Curb, Type A (00759) 118 LF 14 Concrete Curb, Type C (00759) 67 LF 15 Monolithic Curb and Sidewalk (00759) 845 SF 16 Truncated Domes on New Surfaces (00759) 90 SF 17 Extra for New Curb Ramps (00759) 9 EA 18 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 234 SF 19 Remove and Reinstall Existing Signs (00900) 1 LS 20 Crosswalk Closed Sign Supports (00930) 2 EA 21 Peforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 22 Signs, Standard Sheeting, Extruded Aluminum (00940) 26 SF First Street Sanitary Sewer Bypass BID TABULATION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 109,450.00 $ 109,450.00 $ 105,000.00 $ 105,000.00 $ 46,500.00 $ 46,500.00 $ 196,050.00 $ 196,050.00 $ 14,900.00 $ 14,900.00 $ 64,450.00 $ 64,450.00 $ 69,225.00 $ 69,225.00 $ 8,840.00 $ 8,840.00 $ 14,650.00 $ 14,650.00 $ 2,500.00 $ 2,500.00 $ 3,568.00 $ 3,568.00 $ 3,610.00 $ 3,610.00 $ 92.00 $ 1,656.00 $ 95.00 $ 1,710.00 $ 116.00 $ 2,088.00 $ 55.00 $ 990.00 $ 124.00 $ 6,200.00 $ 88.00 $ 4,400.00 $ 112.00 $ 5,600.00 $ 45.00 $ 2,250.00 $ 4.75 $ 14,915.00 $ 5.00 $ 15,700.00 $ 4.00 $ 12,560.00 $ 4.90 $ 15,386.00 $ 337.00 $ 374,407.00 $ 347.00 $ 385,517.00 $ 401.00 $ 445,511.00 $ 336.00 $ 373,296.00 $ 13,200.00 $ 52,800.00 $ 7,750.00 $ 31,000.00 $ 11,557.00 $ 46,228.00 $ 8,425.00 $ 33,700.00 $ 4,520.00 $ 9,040.00 $ 2,000.00 $ 4,000.00 $ 5,710.00 $ 11,420.00 $ 6,545.00 $ 13,090.00 $ 6.50 $ 20,410.00 $ 4.30 $ 13,502.00 $ 6.00 $ 18,840.00 $ 4.00 $ 12,560.00 $ 65.00 $ 1,625.00 $ 42.00 $ 1,050.00 $ 174.00 $ 4,350.00 $ 50.00 $ 1,250.00 $ 161.00 $ 73,738.00 $ 217.50 $ 99,615.00 $ 178.00 $ 81,524.00 $ 146.00 $ 66,868.00 $ 70.00 $ 8,260.00 $ 91.00 $ 10,738.00 $ 64.00 $ 7,552.00 $ 41.25 $ 4,867.50 $ 44.00 $ 2,948.00 $ 90.00 $ 6,030.00 $ 56.00 $ 3,752.00 $ 43.50 $ 2,914.50 $ 17.00 $ 14,365.00 $ 26.50 $ 22,392.50 $ 27.00 $ 22,815.00 $ 9.00 $ 7,605.00 $ 39.00 $ 3,510.00 $ 39.00 $ 3,510.00 $ 36.00 $ 3,240.00 $ 38.00 $ 3,420.00 $ 1,190.00 $ 10,710.00 $ 1,123.00 $ 10,107.00 $ 2,967.00 $ 26,703.00 $ 4,955.00 $ 44,595.00 $ 15.00 $ 3,510.00 $ 13.50 $ 3,159.00 $ 22.00 $ 5,148.00 $ 18.00 $ 4,212.00 $ 1,700.00 $ 1,700.00 $ 1,175.00 $ 1,175.00 $ 1,113.00 $ 1,113.00 $ 1,000.00 $ 1,000.00 $ 2,100.00 $ 4,200.00 $ 1,132.00 $ 2,264.00 $ 1,029.00 $ 2,058.00 $ 350.00 $ 700.00 $ 600.00 $ 600.00 $ 458.00 $ 458.00 $ 926.00 $ 926.00 $ 1,860.00 $ 1,860.00 $ 21.00 $ 546.00 $ 14.00 $ 364.00 $ 41.00 $ 1,066.00 $ 235.00 $ 6,110.00 $ 744,140.00 $ 788,641.50 $ 821,787.00 $ 805,174.00 $ Dewitt Construction Dark Horse Construction D&I Construction Emery & Sons City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -4 ---PAGE BREAK--- Item No. Description Quantity Unit 1 Mobilization 1 LS 2 Temporary Protection and Direction of Traffic 1 LS 3 Erosion Control (00280) 1 LS 4 General Excavation (00330) 18 CY 5 Subgrade Stabilization (00331) 50 CY 6 Pavement Overlay Geotextile (00350) 3,140 SY 7 18 inch PVC F679 Sanitary Sewer Pipe, 15 foot depth (00445) 1,111 LF 8 Concrete Manhole, 48 Inch (00470) 4 EA 9 Connection to Existing Structures (00490) 2 EA 10 Cold Plane Pavement Removal, 0-2" (00620) 3140 SY 11 Aggregate Base (00641) 25 TN 12 Level 2, 1/2-Inch Dense ACP (00744) 458 TN 13 Concrete Curb, Type A (00759) 118 LF 14 Concrete Curb, Type C (00759) 67 LF 15 Monolithic Curb and Sidewalk (00759) 845 SF 16 Truncated Domes on New Surfaces (00759) 90 SF 17 Extra for New Curb Ramps (00759) 9 EA 18 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 234 SF 19 Remove and Reinstall Existing Signs (00900) 1 LS 20 Crosswalk Closed Sign Supports (00930) 2 EA 21 Peforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 22 Signs, Standard Sheeting, Extruded Aluminum (00940) 26 SF First Street Sanitary Sewer Bypass BID TABULATION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 71,500.00 $ 71,500.00 $ 120,425.22 $ 120,425.22 $ 75,000.00 $ 75,000.00 $ 63,103.00 $ 63,103.00 $ 15,000.00 $ 15,000.00 $ 60,629.41 $ 60,629.41 $ 60,000.00 $ 60,000.00 $ 37,000.00 $ 37,000.00 $ 7,000.00 $ 7,000.00 $ 4,510.19 $ 4,510.19 $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 125.00 $ 2,250.00 $ 1,127.82 $ 20,300.76 $ 100.00 $ 1,800.00 $ 75.00 $ 1,350.00 $ 165.00 $ 8,250.00 $ 89.43 $ 4,471.50 $ 125.00 $ 6,250.00 $ 150.00 $ 7,500.00 $ 5.00 $ 15,700.00 $ 6.91 $ 21,697.40 $ 3.50 $ 10,990.00 $ 3.25 $ 10,205.00 $ 450.00 $ 499,950.00 $ 416.85 $ 463,120.35 $ 490.00 $ 544,390.00 $ 560.00 $ 622,160.00 $ 13,600.00 $ 54,400.00 $ 9,848.29 $ 39,393.16 $ 16,000.00 $ 64,000.00 $ 17,000.00 $ 68,000.00 $ 10,000.00 $ 20,000.00 $ 4,356.19 $ 8,712.38 $ 8,000.00 $ 16,000.00 $ 10,000.00 $ 20,000.00 $ 4.00 $ 12,560.00 $ 4.71 $ 14,789.40 $ 4.75 $ 14,915.00 $ 3.50 $ 10,990.00 $ 100.00 $ 2,500.00 $ 93.10 $ 2,327.50 $ 85.00 $ 2,125.00 $ 65.00 $ 1,625.00 $ 194.50 $ 89,081.00 $ 146.78 $ 67,225.24 $ 160.00 $ 73,280.00 $ 120.00 $ 54,960.00 $ 98.00 $ 11,564.00 $ 52.44 $ 6,187.92 $ 80.00 $ 9,440.00 $ 55.00 $ 6,490.00 $ 90.00 $ 6,030.00 $ 61.77 $ 4,138.59 $ 85.00 $ 5,695.00 $ 45.00 $ 3,015.00 $ 30.00 $ 25,350.00 $ 25.40 $ 21,463.00 $ 25.00 $ 21,125.00 $ 26.00 $ 21,970.00 $ 36.00 $ 3,240.00 $ 36.70 $ 3,303.00 $ 50.00 $ 4,500.00 $ 32.00 $ 2,880.00 $ 1,275.00 $ 11,475.00 $ 1,889.80 $ 17,008.20 $ 1,500.00 $ 13,500.00 $ 2,100.00 $ 18,900.00 $ 16.50 $ 3,861.00 $ 24.26 $ 5,676.84 $ 15.00 $ 3,510.00 $ 18.00 $ 4,212.00 $ 750.00 $ 750.00 $ 183.48 $ 183.48 $ 2,000.00 $ 2,000.00 $ 1,200.00 $ 1,200.00 $ 1,500.00 $ 3,000.00 $ 642.17 $ 1,284.34 $ 1,500.00 $ 3,000.00 $ 900.00 $ 1,800.00 $ 1,250.00 $ 1,250.00 $ 489.27 $ 489.27 $ 3,500.00 $ 3,500.00 $ 600.00 $ 600.00 $ 40.00 $ 1,040.00 $ 14.68 $ 381.68 $ 45.00 $ 1,170.00 $ 40.00 $ 1,040.00 $ 865,751.00 $ 887,718.83 $ 946,190.00 $ 964,000.00 $ Moore Excavation Pihl Inc J.W. Fowler Northcore USA City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -5 ---PAGE BREAK--- Item No. Description Quantity Unit 1 Mobilization 1 LS 2 Temporary Protection and Direction of Traffic 1 LS 3 Erosion Control (00280) 1 LS 4 General Excavation (00330) 18 CY 5 Subgrade Stabilization (00331) 50 CY 6 Pavement Overlay Geotextile (00350) 3,140 SY 7 18 inch PVC F679 Sanitary Sewer Pipe, 15 foot depth (00445) 1,111 LF 8 Concrete Manhole, 48 Inch (00470) 4 EA 9 Connection to Existing Structures (00490) 2 EA 10 Cold Plane Pavement Removal, 0-2" (00620) 3140 SY 11 Aggregate Base (00641) 25 TN 12 Level 2, 1/2-Inch Dense ACP (00744) 458 TN 13 Concrete Curb, Type A (00759) 118 LF 14 Concrete Curb, Type C (00759) 67 LF 15 Monolithic Curb and Sidewalk (00759) 845 SF 16 Truncated Domes on New Surfaces (00759) 90 SF 17 Extra for New Curb Ramps (00759) 9 EA 18 Pavement Bar, Type B-HS: Continental Crosswalk (00867) 234 SF 19 Remove and Reinstall Existing Signs (00900) 1 LS 20 Crosswalk Closed Sign Supports (00930) 2 EA 21 Peforated Steel Square Tube Anchor Sign Supports (00930) 1 LS 22 Signs, Standard Sheeting, Extruded Aluminum (00940) 26 SF First Street Sanitary Sewer Bypass BID TABULATION UNIT PRICE TOTAL UNIT PRICE TOTAL 40,000.00 $ 40,000.00 $ 210,000.00 $ 210,000.00 $ 118,000.00 $ 118,000.00 $ 89,000.00 $ 89,000.00 $ 3,000.00 $ 3,000.00 $ 15,000.00 $ 15,000.00 $ 120.00 $ 2,160.00 $ 95.00 $ 1,710.00 $ 150.00 $ 7,500.00 $ 300.00 $ 15,000.00 $ 5.20 $ 16,328.00 $ 3.00 $ 9,420.00 $ 608.00 $ 675,488.00 $ 435.00 $ 483,285.00 $ 11,825.00 $ 47,300.00 $ 15,000.00 $ 60,000.00 $ 1,125.00 $ 2,250.00 $ 3,500.00 $ 7,000.00 $ 5.25 $ 16,485.00 $ 60.00 $ 188,400.00 $ 80.00 $ 2,000.00 $ 240.00 $ 6,000.00 $ 157.00 $ 71,906.00 $ 127.00 $ 58,166.00 $ 73.00 $ 8,614.00 $ 65.00 $ 7,670.00 $ 63.00 $ 4,221.00 $ 70.00 $ 4,690.00 $ 10.00 $ 8,450.00 $ 12.00 $ 10,140.00 $ 39.00 $ 3,510.00 $ 15.00 $ 1,350.00 $ 805.00 $ 7,245.00 $ 1,500.00 $ 13,500.00 $ 25.00 $ 5,850.00 $ 20.00 $ 4,680.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 385.00 $ 770.00 $ 600.00 $ 1,200.00 $ 550.00 $ 550.00 $ 1,000.00 $ 1,000.00 $ 45.00 $ 1,170.00 $ 30.00 $ 780.00 $ SLE Inc ATK Construction City of Woodburn - Public Works; Engineering Division ESTIMATE REV. September Page -6