Full Text
July 3, 2024 Ronald “Ron” Ped, President/Architect Ronald James Ped Architect, PC 1220 20th Street SE, Suite 125 Salem, OR 97302-1205 RE: Status of CU 24-02, DR 24-02, PP 24-01, & SA 24-01 “US Market gas station” at 2540 & 2600 Newberg Hwy (Tax Lots 052W12DB03600 [primary] & 3700) Dear Mr. Ped: Staff reviewed the degree of completion of the Conditional Use (CU) consolidated applications package for the subject property with materials submitted February 8, 2024 with revised and additional materials received June 10, 2024 and determined it complete as of July 3, 2024. The application package is tentatively scheduled for a public hearing before the Planning Commission on Thursday, August 22, 2024 in the Council Chambers at City Hall, 270 Montgomery Street. The Commission will not only meet in person but also continue to video conference. Sign Posting(s) The date is tentative partly because the applicant needs to complete sign postings. (The City handles mailed notices.) Enclosed with this letter are the sign posting requirements with a certification form. It’s the applicant’s responsibility to meet these requirements on time, i.e. no later than 10 days prior to the hearing, which would equal Monday, August 12. Meeting Details A meeting would start at 7 p.m., and the scheduled start time of the application package and its order on an agenda is yet unknown. Staff would publish a staff report with a recommendation to the Commission a week prior to a hearing – for example, on August 15 for August 22. Please feel free to contact staff as the publication date approaches. The availability of commissioners and ability to attain quorum influences staff confirmation of scheduled meeting dates. ---PAGE BREAK--- Letter of completeness July 3, 2024 – US Market gas station – 2540 & 2600 Newberg Hwy – CU 24-02, etc. Page 2 of 2 Because the Commission has not only returned to in-person meetings but also continues to video conference, individuals who want to observe or participate remotely can use a Microsoft Teams hyperlink via the calendar entry for the meeting when the entry with access appears on the City calendar, which is available at . The Meetings webpage also displays Commission and Council meetings at . For administrative questions about the Commission, contact the Administrative Specialist at (503) 982- 5246. Projects webpage Note that there’s a City project webpage. The gateway webpage for land development projects is the Projects webpage, which is . You may contact me at (503) 980-2485 or <[EMAIL REDACTED]> with project questions. Sincerely, Colin Cortes, AICP, CNU-A Senior Planner Enclosures • Sign posting instructions with certification form • Sign posting template cc: Architect: Ronald “Ron” Ped, President/Architect, Ronald James Ped Architect, PC, 1220 20th St SE, Ste 125, Salem, OR 97302-1205 Lal Din Sidhu (“Don” Sidhu), Woodburn Petroleum LLC, 1311 Lancaster Dr NE, Salem, OR 97301-1907 Casey Knecht, P.E., Development Review Coordinator, Oregon Dept. of Transportation (ODOT), Region 2 Headquarters, 455 Airport Road SE, Building B, Salem OR 97301-5395 James “Jim” Gibbs, Fire Marshal, Woodburn Fire Dist., 1776 Newberg Hwy, Woodburn, OR 97071 Panor 360 Condominium, Attn Manager, 950 Evergreen Rd Office, Woodburn, OR 97071 Chris Kerr, Community Development Director Dan Handel, Planner Cassandra Martinez, Administrative Specialist Curtis Stultz, Public Works Director Dago Garcia, P.E., City Engineer file(s): CU 24-02, DR 24-02, PP 24-01, & SA 24-01 “US Market gas station” at 2540 & 2600 Newberg Hwy (Tax Lots 052W12DB03600 [primary] & 3700); Accela record no. 971-24-000013-PLNG; Ronald James Ped Architect PC job no. 1964. ---PAGE BREAK--- Rev. 3/02/2018 Land Use Notice Sign Posting Instructions The applicant is responsible for posting sign(s) regarding land use application public hearing on the property per WDO 4.01.14B. 1. Timing: Post at least 10 days prior to the public hearing date. 2. Size: Print the notice at full size (18 inches by 24 inches). Printing at a smaller size will not give the required letter height. 3. Weatherize: Protect the notice from weather. Laminating, enclosing within clear plastic sleeve, or printing on plastic fiberboard is sufficient. Staff recommends mounting the sign on a building face or a post such that the top of the sign is 5 feet above sidewalk or ground. 4. Number: Post a notice on each frontage of the property. (If the property’s frontage exceeds 600 feet, one copy of the notice must be posted for each 600 feet or fraction thereof.) Place sign(s) within 10 feet of the street so as to be visible to pedestrians and motorists. Once posted, you need not maintain a posted notice. 5. Proof of Posting: Upon posting, submit a photo of the sign and a complete certification form that the property has been properly posted. The form is the next sheet. Submit it to the Planning Division ([EMAIL REDACTED]) or directly to the project planner. 6. Removal: Remove all signs within 10 days following the hearing announced in the notice. Staff offers a PDF sign template for applicants or their sign contractors to use for sign production. ---PAGE BREAK--- Planning Division Certificate of Sign Posting – Notice of Public Hearing I hereby certify that on I posted the notice of public hearing sign(s) for the US Market gas station project, file numbers CU 24-02, DR 24-02, PP 24-01, & SA 24-01, on the subject property (2540 & 2600 Newberg Hwy; Tax Lots 052W12DB03600 [primary] & 3700). Attached is one or more photos of the posted sign(s). The posting was accomplished in accordance with the requirements of WDO 4.01.14B. Signature Date Print Name