← Back to Whitefish

Document Whitefish_doc_f345c41f59

Full Text

Fiscal Years 2023 – 2027 City of Whitefish May 25, 2022 CAPITAL IMPROVEMENTS PROGRAM Wastewater Treatment Plant Upgrade Project Photo by Randy Reynolds ---PAGE BREAK--- Table of Contents Overview of Capital Improvements Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 City and State Law Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-2 Capital Improvement Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Development of the Capital Improvement Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Cost of Capital Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Funding and Financing Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5 Program Funding Goals. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Program Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Department Reports Detailing Project, Timing, and Funding Administration Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Municipal Court Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Library Detailed Project Report. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Planning & Building Detailed Project Report. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Police Department Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Fire Department Detailed Project Report. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 Parks & Recreation Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 Streets Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 Water Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 Wastewater Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Stormwater Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18 Bike/Ped Paths Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 Resort Tax Detailed Project Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 ---PAGE BREAK--- Capital Improvements Program Overview of Capital Improvements Program The Capital Improvements Program (CIP) for Fiscal Years 2023 – 2027 identifies needed investments in capital facilities and equipment maintained by the City of Whitefish over the next five years. The CIP is not an appropriation or approval of a specific project, but rather a planning document that communicates to citizens and the development community the City’s intent to preserve, improve, and expand infrastructure, facilities, and equipment. To effectively respond to changing circumstances and economic factors, the CIP must be a flexible plan. The CIP considers providing capital facilities for use by the current and likely increased population during the next five years. In addition, the City’s capital facilities must serve a significant seasonal population. The CIP maintains and, in some cases, expands the current levels of service. There are many uses for the capital improvements program. Some of the most important uses include: 1. Ensuring the timely provision of adequate facilities to maintain levels of service that are important to the quality of life in the City. 2. Maintaining satisfactory operating efficiency and safety of the City’s existing capital facilities. 3. Providing facilities needed to accommodate new growth. These facilities would be eligible for impact fees. 3. Providing evidence to bond rating agencies that the City is planning and managing its debt for capital improvements, thus minimizing interest rates and the cost of borrowing money. 4. Providing evidence to agencies that award grants and loans that the City is planning for capital improvements, including the need for local matching funds and/or repayment of loans. City and State Law Requirements According to the Whitefish’s Municipal Code (Section 10-2-10), an update to the CIP is required at least every two years to comply with Impact Fee requirements. When originally established, the two-year update ensured the City complied with the Montana laws related to Impact Fees. During the 2015 Legislative Session, the required update was reduced at the State level to every five years. However, to ensure proper planning for capital improvements and to react timely to changing circumstances, the City now updates the CIP on an annual basis. Following are excerpts from the applicable code sections: Capital Improvement Program Page 1 of 20 ---PAGE BREAK--- CITY OF WHITEFISH MUNICIPAL CODE: 10-2-10: COMPONENT OF BUDGET: A. Pursuant to and consistent with Montana Code Annotated section 7-6-1602(2)(k), the city's capital improvement program is the component of the city's budget that: 1. Schedules construction of public facility capital improvements to serve projected growth; 2. Projects costs of the capital improvements; 3. Allocates collected impact fees for construction of the capital improvements; and 4. Covers at least a five year period and is reviewed and updated at least every two years. MONTANA ANNOTED CODE: 7-6-1602. Calculation of impact fees documentation required ordinance or resolution requirements for impact fees. For each public facility for which an impact fee is imposed, the governmental entity shall prepare and approve a service area report. The service area report is a written analysis that must: have a component of the budget of the governmental entity that: schedules construction of public facility capital improvements to serve projected growth; (ii) projects costs of the capital improvements; (iii) allocates collected impact fees for construction of the capital improvements; and (iv) covers at least a 5-year period and is reviewed and updated at least every 5 years. Capital Improvement Definition For a project to be included in the CIP, the project must be a capital expenditure that meets the following criteria: • Newly acquired capital assets o Expenditure of $5,000 or more o Must have a useful life greater than 1 year OR • Improvements to current capital assets o Expenditure of $5,000 or more o Extends the useful life of the asset o Results in the asset being in a “like new” condition or upgraded to improve efficiency, quality, strength, or capacity Projects undertaken to repair and maintain equipment and facilities that do not meet the criteria above are considered routine repair and maintenance expenditures. These on-going expenditures are budgeted in the fiscal year that the expenditure occurs and expensed when incurred. Capital Improvement Program Page 2 of 20 ---PAGE BREAK--- Development of the Capital Improvements Program The CIP process generally begins in February and is developed through the following steps: 1. Department Directors identify capital improvement projects that are needed to maintain levels of service or achieve expanded levels of service that deemed necessary over the next five years. Descriptions and justifications are also included for each project. 2. Department Directors prioritize proposed capital improvement projects for their respective departments. Some CIPs use elaborate systems to determine the priorities among capital improvement projects. Whitefish’s CIP uses a straightforward approach in which each Department Director lists their projects in priority order, according to their professional judgment and recommendation. Certain City plans may drive the priority, such as the Bike and Pedestrian Master Plan. 3. The Finance Director assists in identifying funding sources that are available to pay for the capital improvement projects and prepares forecasts of revenues that are generally predictable. Bonding for projects is also considered when appropriate. 4. The City Manager and Finance Director meet with each Department Director to discuss projects required to maintain the current levels of service and the possibility of expanded levels of service based on forecasted revenues and funding options available. If funding is not readily available and the specific project would not reduce the level of service, it may be moved to the “Unscheduled Projects” column. If an unexpected source of revenue, such as a grant, is obtained the project may be moved into a specific year within the CIP. 5. During the development of the fiscal year budget, the CIP is used as a tool to determine which capital projects should be included and what funds can be appropriated. 6. All information is compiled into the CIP for the City Council to review and consider during the budget work sessions. 7. During the fiscal year final budget adoption in August, the preliminary CIP is approved. 8. With the fiscal year budget adoption in August, appropriations are approved for specific capital improvement projects planned for that year. Capital Improvement Program Page 3 of 20 ---PAGE BREAK--- Cost of Capital Improvements The CIP for Fiscal Years 2023 – 2027 contains 112 projects, excluding those in a to be determined status, totaling $41,809,834. More than 76% of the project costs are related to the wastewater improvements, street reconstruction projects funded by Resort Tax collections, and necessary water system improvements including treatment and capacity expansion. Detailed project information, timing, and funding is detailed on each of the departmental reports. Below is a summary of costs by Department or major Project Type: DEPARTMENT ESTIMATED COST City Administration/IT $ 195,000 City Court 4,800 Library 111,986 Planning/Building 200,000 Police 340,400 Fire & Ambulance 2,344,800 Parks & Recreation 1,446,350 Streets 1,994,538 Water 13,488,230 Wastewater 3,245,130 Stormwater 1,248,600 Bike/Pedestrian Paths 2,100,000 Resort Tax Projects 15,190,000 TOTAL $ 41,809,834 Funding and Financing Options for Capital Improvements There are a variety of funding sources available to pay for projects identified in the City’s CIP for Fiscal Years 2023 – 2027. Some sources of funding, such as Impact Fees, Tax Increment, and grants, are restricted and can only be used for projects that meet certain requirements. The following table describes the various funding sources and the capital facilities or equipment that may qualify. Capital Improvement Program Page 4 of 20 ---PAGE BREAK--- POSSIBLE FUNDING SOURCES CAPITAL FACILITY/EQUIPMENT Annual Budget or Cash Reserves for Capital Purchases All Capital. Donations/Contributions Fire, Library, Parks & Recreation, and Police. Grants Depends on grant award. May include Water, Wastewater, Stormwater, Parks & Recreation, Fire, and Police. Impact Fees Expansion of Emergency Services Center (Court/Police/Fire), City Hall, Paved Trails, Park Maintenance Building, Water Infrastructure, Wastewater Infrastructure, and Storm Water. *Project must have useful life of 10 years or more. Land Dedication or Fees in Lieu Parks & Recreation. Resort Tax Park & Recreation Improvements, Paved Trails, Streets including related Water, Wastewater, and Storm Water components. Tax Increment Eligible Facility Projects under contract prior to July 15, 2020 and approved by the City Council. Parkland & Greenway Maintenance Assessment Parks & Recreation. Street Maintenance Assessment Streets. Gas Tax and Bridge and Road Safety and Accountability Act (BaRSAA) Streets. Whitefish Fire Service Area Contribution Fire. Voted Property Tax Levy (Voter Approval Required) Fire, Police, and Parks & Recreation. Special Improvement Districts Streets, Water, Wastewater, and Storm Water. General Obligation Bonds (Voter Approval Required) Parks & Recreation, Fire, Police, and Library. Revenue Bonds Water and Wastewater. Lease Revenue Bonds Parking Structure. Capital Improvement Program Page 5 of 20 ---PAGE BREAK--- Program Funding Goals The City strives to properly maintain facilities and the current level of service in the most cost efficient and effective way possible. While affordability of utility rates, fees, and assessments continues to be of concern for the citizens of Whitefish, it is important not to defer maintenance costs or capital related problems for future generations. Each fall, the City Council considers proposed increases for both the water and wastewater utilities. To ensure proper funding of necessary capital improvements for the water and wastewater utilities, a utility rate study was completed in 2016 that indicates how much and when the rate increases should be considered by the City Council. Based on significant changes to the CIP for the water utility, the rate model was updated in 2019. However, due to the financial impacts of the COVID-19 pandemic, rates were not adjusted in 2020 or 2021. For other capital improvements that are primarily funded by property tax revenue, the City has minimal flexibility. In Fiscal Year 2019 the City was at its maximum mill levy. However, with the expiration of the Tax Increment District in 2020, the City now has additional mills that could be levied according to statutory limitations. Overall, the available increase is small when considering the multiple departments funded by property taxes (Administration, Court, Library, Fire, Police, Library, and Parks & Recreation) and the financial impacts to property taxpayers. Staff continues to apply for grants in hopes of funding capital projects, but those are often limited and very competitive. Some items have been included in the “Unscheduled Projects” column to show capital improvement projects that are desired, but for which no funding is readily available or a timeline has not been determined. If funding does become available during the next five years, these unscheduled projects may be added to a specific year on the CIP. Program Monitoring As with any planning document, the progress made toward completion of identified projects must be monitored. Each year, staff reviews the projects that were accomplished, considers any changes in circumstances or economic factors, and makes necessary updates to the plan. Questions regarding the status of the CIP should be directed to the Finance Director. Capital Improvement Program Page 6 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (General) Impact Fees Grants Tax Increment Total Unscheduled Projects 1 Replacement Telephone System Replace aging telephone system utilizing Microsoft Teams and soft phones. Cost savings per month is estimated at about $200 per month. 12,000 $ 12,000 $ 12,000 $ 12,000 $ 2 Wi‐Fi Access Point Replacement Systems are 5‐8 years old and need to be replaced. General useful life is 4‐5 years. 85,000 $ 42,500 $ 42,500 $ 85,000 $ 85,000 $ 3 Replacement of cameras and servers at ESC Cameras and related server at the ESC are 10‐11 years old and past their recommended useful life. 38,000 $ 19,000 $ 19,000 $ 38,000 $ 38,000 $ 4 ESC Core Server Replacement Includes server and accompanying software upgrades. 30,000 $ 30,000 $ 30,000 $ 30,000 $ 5 City Hall Core Server Replacement Includes server and accompanying software upgrades. 30,000 $ 30,000 $ 30,000 $ 30,000 $ 6 New Cemetery Site Ongoing goal of the City Council to explore properties for a new cemetery site. Acquisition and development costs TBD with current $20,000 budgeted for testing and analysis of current site. TBD TBD 195,000 $ 12,000 $ 91,500 $ 91,500 $ ‐ $ ‐ $ ‐ $ 195,000 $ ‐ $ ‐ $ ‐ $ 195,000 $ ‐ $ Estimated Administration Cash Reserves in General Fund for Capital Projects 12,000 $ 41,500 $ 41,500 $ ‐ $ ‐ $ Estimated Additional Property Tax Levy Required ‐ $ 50,000 $ 50,000 $ ‐ $ ‐ $ Estimated Cash Balance Remaining for Capital Projects at Year‐End ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ PROJECT INFORMATION FUNDING SOURCES 5‐Year Capital Improvements Program: Administration Department ESTIMATED COST PER YEAR Capital Improvement Program Page 7 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (General) Impact Fees Grants Tax Increment Total Unscheduled Projects 1 ESC Building Maintenance Caulk and Paint exterior of ESC. Costs divided between Court Fire (58%) and Police 4,800 $ 4,800 $ 4,800 $ 4,800 $ 4,800 $ ‐ $ 4,800 $ ‐ $ ‐ $ ‐ $ ‐ $ 4,800 $ ‐ $ ‐ $ ‐ $ 4,800 $ ‐ $ Estimated Administration Cash Reserves (General Fund ‐ Court) for Capital Projects ‐ $ 4,800 $ ‐ $ ‐ $ Estimated Cash Balance Remaining for Capital Projects at Year‐End ‐ $ ‐ $ ‐ $ ‐ $ 5‐Year Capital Improvements Program: Municipal Court FUNDING SOURCES PROJECT INFORMATION ESTIMATED COST PER YEAR Capital Improvement Program Page 8 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Library) Impact Fees Grants Tax Increment Total Unscheduled Projects 1 Library Remodel Interior remodel/partitioning of library area to provide Director Office Space. 11,986 $ 11,986 $ 11,986 $ 11,986 $ 2 Storage Addition to Library Need for additional storage for Library. Estimated cost is an internal projection and may vary. 50,000 $ 50,000 $ 50,000 $ 50,000 $ 3 Lighting Upgrade Upgrade needed throughout main Library ( TIF funded remodel upgraded office/sorting area and front desk only). 50,000 $ 50,000 $ 50,000 $ 50,000 $ 4 HVAC/Furnace Maintenance Aging equipment requires significant repairs at times. Currently only addressed as needed. TBD TBD 5 Flooring/Carpet Upgrade Replace aging carpet in main Library area. TBD TBD 111,986 $ 11,986 $ 100,000 $ ‐ $ ‐ $ ‐ $ ‐ $ 100,000 $ ‐ $ ‐ $ 11,986 $ 111,986 $ ‐ $ Estimated Library Cash Reserves/Donations for Capital Projects ‐ $ 100,000 $ ‐ $ Tax Increment Funds for Remodel 11,986 $ ‐ $ ‐ $ ‐ $ Estimated Cash Balance Remaining for Capital Projects at Year‐End ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 5‐Year Capital Improvements Program: Library PROJECT INFORMATION FUNDING SOURCES ESTIMATED COST PER YEAR Capital Improvement Program Page 9 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Building) Impact Fees Grants Tax Increment Total Unscheduled Projects 1 Vehicle for Building Replace 2016 GMC Terrain SUV 50,000 $ 50,000 $ 50,000 $ 50,000 $ 2 Storage Building Insulate, electrical, heater in new Bldg Dept storage building 50,000 $ 50,000 $ 50,000 $ 50,000 $ 3 Vehicles for Building Replace 2020 Ford Pickup 50,000 $ 50,000 $ 50,000 $ 50,000 $ 4 Vehicles for Building Replace 2020 Ford Pickup 50,000 $ 50,000 $ 50,000 $ 50,000 $ 200,000 $ 100,000 $ ‐ $ ‐ $ 100,000 $ ‐ $ ‐ $ 200,000 $ ‐ $ ‐ $ ‐ $ 200,000 $ ‐ $ Estimated Building Code Fund Cash Reserves for Capital Projects 100,000 $ ‐ $ ‐ $ 100,000 $ ‐ $ Estimated Administration Cash Reserves (General Fund ‐ Planning) for Capital Projects ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ Estimated Cash Balance Remaining for Capital Projects at Year‐End ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ PROJECT INFORMATION 5‐Year Capital Improvements Program: Planning & Building Department FUNDING SOURCES ESTIMATED COST PER YEAR Capital Improvement Program Page 10 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Police) Impact Fees Grants Tax Increment Total Unscheduled Projects 1 Ford Explorer Hybrid (vehicle cost w/ equipment) Replace 2013 Ford Explorer. 60,000 $ 60,000 $ 60,000 $ 60,000 $ 2 Motorola APX 8000 Portable Radio Purchase 2 dual band 800 MHz portable radios with Stonegarden Equipment Grant funds. 12,000 $ 12,000 $ 12,000 $ 12,000 $ 3 Ford Explorer Hybrid (vehicle cost w/ equipment) Replace 2014 Ford Explorer. 62,000 $ 62,000 $ 62,000 $ 62,000 $ 4 ESC Maintenance Caulk and Paint exterior of ESC. Costs divided between Court Fire (58%) and Police 20,400 $ 20,400 $ 20,400 $ 20,400 $ 5 Ford Explorer Hybrid (vehicle cost w/ equipment) Replace 2015 Ford Explorer. 62,000 $ 62,000 $ 62,000 $ 62,000 $ 6 Ford Explorer Hybrid (vehicle cost w/ equipment) Replace 2016 Ford Explorer. 62,000 $ 64,000 $ 62,000 $ 62,000 $ 7 Ford Explorer Hybrid (vehicle cost w/ equipment) Replace 2017 Ford Explorer. 62,000 $ 64,000 $ 62,000 $ 62,000 $ 340,400 $ 72,000 $ 82,400 $ 62,000 $ 64,000 $ 64,000 $ ‐ $ 340,400 $ ‐ $ ‐ $ ‐ $ 340,400 $ ‐ $ Estimated Police Cash Reserves for Capital Projects 60,000 $ 82,400 $ 62,000 $ 64,000 $ 64,000 $ Estimated Equipment Grants to Complete Project 12,000 $ ‐ $ ‐ $ ‐ $ Estimated Cash Balance Remaining for Capital Projects at Year‐End ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ PROJECT INFORMATION FUNDING SOURCES ESTIMATED COST PER YEAR 5‐Year Capital Improvements Program: Police Department Capital Improvement Program Page 11 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Fire and/or Amb) Impact Fees Grants & Contributions Tax Increment Total Unscheduled Projects 1 Brush Truck Replace the 22‐year old Wildland Fire truck. The truck would use the existing flatbed. 100% Fire. Carried over from FY21. 50,000 $ 50,000 $ 50,000 $ 50,000 $ 2 Type‐3 Interface Fire Engine Type 3 fire engines are designed for mountainous and rural communities with four‐wheel drive that can respond to wildfires. This fire engine replaces the City's 1995 Type 1 vehicle. Funding includes $100,000 from the Whitefish Fire Service Area and $350,000 in cash reserves. City was not awarded grant funds in FY22. 450,000 $ 450,000 $ 450,000 $ 450,000 $ 3 Pond/River (Fan) Boat Inflatable watercraft has air & water leaks. The hovercraft is not ideal for rescue. Department to replace with one fan boat. Parks could use hovercraft building at City Beach. 30% Fire and 70% EMS. 100,000 $ 100,000 $ 100,000 $ 100,000 $ 4 Command Vehicle The current Assistant Fire Chief's vehicle is 18‐years old and experiencing engine problems and will not be able to be used as a utility vehicle. The request is to order a new pick‐up for the Fire Chief and move the current 2018 Fire Chief's vehicle to become the Assistant Fire Chief's vehicle. 50,000 $ 50,000 $ 50,000 $ 50,000 $ 5 ESC Maintenance Caulk and Paint exterior of ESC. Costs divided between Court Fire (58%) and Police 34,800 $ 34,800 $ 34,800 $ 34,800 $ 6 Ladder Truck Replace the 1997 Rescue Truck with a Ladder Truck to be able to reach buildings over 35‐feet high. Current 35‐foot ground ladder only gives us a working height of about 28‐feet and poses a higher risk for firefighters. As buildings have grown taller, the need for a Ladder Truck has grown too. Application for an Assistance to Firefighters grant is expected with a 50/50 match. If the grant is not awarded, at a minimum the 1997 Rescue should be replaced with another Fire Truck (Est. ~$600K). Another option is looking into other financing sources should the grant not be awarded. 1,200,000 $ 1,200,000 $ 600,000 $ 600,000 $ 1,200,000 $ 7 EMS Monitors Replace old EMS Monitors. Working toward a 5‐year replacement plan. Monitors are used in ambulances & fire engines. 160,000 $ 160,000 $ 160,000 $ 160,000 $ 8 Ambulance Replace a 12‐year old ambulance in recommended replacement schedule. 250,000 $ 250,000 $ 150,000 $ 100,000 $ 250,000 $ 9 Command Vehicle Add to command vehicle fleet. 50,000 $ 50,000 $ 50,000 $ 50,000 $ 2,344,800 $ 650,000 $ 34,800 $ 160,000 $ 1,450,000 $ 50,000 $ 750,000 $ 994,800 $ ‐ $ 600,000 $ ‐ $ 2,344,800 $ ‐ $ Estimated Fire and Ambulance Cash Reserves for Capital Projects 625,000 $ 34,800 $ 160,000 $ 100,000 $ 50,000 $ Estimated Bonds, Loans, or Other Debt to Complete Project as Scheduled ‐ $ ‐ $ ‐ $ 750,000 $ ‐ $ BNSF Grant 25,000 $ ‐ $ ‐ $ ‐ $ ‐ $ Estimated Grants (Project Completed only if Grant Awarded or Other Financing Options Available) ‐ $ ‐ $ ‐ $ 600,000 $ ‐ $ Estimated Cash Balance Remaining for Capital Projects at Year‐End ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 5‐Year Capital Improvements Program: Fire Department PROJECT INFORMATION FUNDING SOURCES ESTIMATED COST PER YEAR Capital Improvement Program Page 12 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Cash Reserves (Parks) Cash Reserves (Parkland Acqu. & Development) Impact Fees (Paved Trails) Grants Tax Increment Total Unscheduled Projects 1 Armory Park Improvement Project Phase III Project will be funded through LWCF Grant. Additional matching funds are secured through other City funds such as Resort Tax and Stormwater. 580,650 $ 580,650 $ 91,150 $ 239,500 $ 250,000 $ 580,650 $ 2 Mountain Trails Volleyball Courts Total rennovation. Finacially supported by Weyerhauser grant and Stack contribution. 30,700 $ 30,700 $ 8,850 $ 8,850 $ 13,000 $ 30,700 $ 3 City Beach Swim Lines Replace swim lines that will be at the end of useful life. 10,000 $ 10,000 $ 10,000 $ 10,000 $ 4 Snowblower Attachments Replacement of broken attachements for two pieces of equipment 20,000 $ 20,000 $ 20,000 $ 20,000 $ 5 Park Sign Master Plan Implementation Sign Printing and Installation. 40,000 $ 40,000 $ 40,000 $ 40,000 $ 6 Ice Den Building Improvements Replace water heater and other building improvements. 30,000 $ 30,000 $ 30,000 $ 30,000 $ 7 Recreational Shuttle Bus Elminates the need for contracted busing services 20,000 $ 20,000 $ 20,000 $ 20,000 $ 8 Wood Chipper Replacement of existing chipper that has reach end of useful life. 55,000 $ 55,000 $ 55,000 $ 55,000 $ 9 City Beach Improvements ADA imporvements in collaboration with Dream Adaptive, including ramps, decking, and access points. 120,000 $ 120,000 $ 20,000 $ 100,000 $ 20,000 $ 140,000 $ 10 Armory Park Final Phases Pavilion, picnic area, small child playground, parking, remaining unfunded tasks from Phase III. (Combined with $120000 of Resort Tax for softball fields.) 400,000 $ 150,000 $ 250,000 $ 150,000 $ 250,000 $ 400,000 $ 11 Snow Removal equipment Replacement of Toro for downtown, viaduct, and greenrails. 70,000 $ 70,000 $ 70,000 $ 70,000 $ 12 City Beach Boat Launch Extension As water levels drop, a longer ramp will be needed to effectively launch boats. 70,000 $ 70,000 $ 35,000 $ 35,000 $ 70,000 $ 1,446,350 $ 711,350 $ 195,000 $ 150,000 $ 250,000 $ 140,000 $ 435,000 $ 223,850 $ 239,500 $ 568,000 $ ‐ $ 1,466,350 $ ‐ $ Estimated Parks & Recreation Cash Reserves for Capital Projects 120,000 $ 95,000 $ 75,000 $ 125,000 $ 70,000 $ Parkland Development and Acquisition Fund (FYdepends on development) 88,850 $ 100,000 $ ‐ $ ‐ $ 35,000 $ Bike Path Impact Fees for Armory Park 239,500 $ ‐ $ ‐ $ ‐ $ ‐ $ Grants/Contributions 263,000 $ ‐ $ 75,000 $ 125,000 $ 35,000 $ Estimated Cash Balance Remaining for Capital Projects at Year‐End ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 5‐Year Capital Improvements Program: Parks & Recreation Department PROJECT INFORMATION FUNDING SOURCES ESTIMATED COST PER YEAR Capital Improvement Program Page 13 of 20 ---PAGE BREAK--- Grants (Various) S1 Viaduct Improvements Widening of bike path over viaduct. 300,000 $ 300,000 $ 300,000 $ 300,000 $ S2 Glenwood Repairs Roadway Reconstruction 100,000 $ 100,000 $ 100,000 $ 100,000 $ S3 Monegan (Parks Shop to JP ‐ 2,500') Pave roadway ‐ currently gravel review prior project costs ($1,050,000). $100,000 allocated to Stormwater. 950,000 $ 950,000 $ 250,000 $ 700,000 $ 950,000 $ Baker Avenue Extension Complete Baker between 19th St. and JP Rd. ($10M) ‐ $ 10,000,000 $ E. 7th Street Complete E. 7th between Kalispell Ave. and Spokane Ave. ($1M) ‐ $ 1,000,000 $ Whitefish Ave Extend Road to Shiloh ($450K) ‐ $ 450,000 $ Columbia Ave. Complete Columbia between Greenwood and 13th ($5M) ‐ $ 5,000,000 $ Wisconsin Avenue Intersection Improvements Portion to be covered by City's Urban Funds. ‐ $ 2,300,000 $ E1 RTK Base Station For GPS tracking City Assets and Data Collection 4,130 $ 4,130 $ 4,130 $ 4,130 $ E2 Snow Plow ‐ 8" Replacement for unit #147 5,000 $ 5,000 $ 5,000 $ 5,000 $ E3 SNOW PLOW ‐ 10' Replacement for unit #138 10,000 $ 10,000 $ 10,000 $ 10,000 $ E4 PICKUP 4 x 4 (150) Replacement for unit #18 ‐ $36k split st/water/sewer 12,000 $ 12,000 $ 12,000 $ 12,000 $ E5 Asphalt Recycling Machine New Equipment to increase productivity for asphalt maintenance Asphalt Recycling Machine $105K split str/wtr/swr 35,000 $ 35,000 $ 35,000 $ 35,000 $ E6 Mastic Machine New Equipment to increase productivity for asphalt maintenance 97,000 $ 97,000 $ 97,000 $ 97,000 $ E7 Hydraulic Press Shop Equipment 5,000 $ 5,000 $ 5,000 $ 5,000 $ E8 Concrete Scarifier Replacement for unit #99 6,760 $ 6,760 $ 6,760 $ 6,760 $ E9 PICKUP 4 x 4 (150) Replacement for unit #11 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E10 BROOM Replacement for unit #189 10,628 $ 10,628 $ 10,628 $ 10,628 $ E11 SNOW PLOW ‐ 11' Replacement for unit #139 11,149 $ 11,149 $ 11,149 $ 11,149 $ E12 SNOW PLOW ‐ 10' Replacement for unit #137 12,258 $ 12,258 $ 12,258 $ 12,258 $ E13 PLANER ‐ 18" Replacement for unit #201 13,483 $ 13,483 $ 13,483 $ 13,483 $ E14 DUMP TRUCK Replacement for unit #25 ‐ $54,000, split $18,000 Street/Water/Sewer 18,000 $ 18,000 $ 18,000 $ 18,000 $ E15 PAVER Replacement for unit #55 43,500 $ 43,500 $ 43,500 $ 43,500 $ E16 HYDRAULIC POWER UNIT Replacement for unit #95 6,630 $ 6,630 $ 6,630 $ 6,630 $ E17 SNOW PLOW Replacement for unit #148 9,000 $ 9,000 $ 9,000 $ 9,000 $ E18 S.U.V. (Freestyle) Replacement for unit #5 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E19 PUMP ‐ 6" TRLR. MOUNT Replacement for unit #169 ‐ $60,000, split $20,000 Street/Water/Sewer 20,000 $ 20,000 $ 20,000 $ 20,000 $ E20 PICKUP 4 x 4 (150) Replacement for unit #3 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E21 PICKUP 4 x 4 (350 ‐ Flatbed) Replacement for unit #8 ‐ $33,000, split $11,000 Street/Water/Sewer 11,000 $ 11,000 $ 11,000 $ 11,000 $ E22 GENERATOR Replacement for unit #92 ‐ $39,000, split $13,000 Street/Water/Sewer 13,000 $ 13,000 $ 13,000 $ 13,000 $ E23 SWEEPER Replacement for unit #48 (Total $218K split Streets/Stormwater) 109,000 $ 109,000 $ 109,000 $ 109,000 $ E24 PICKUP 4 x 4 (250) Replacement for unit #17 ‐ $30,000, split $10,000 Street/Water/Sewer 10,000 $ 10,000 $ 10,000 $ 10,000 $ E25 DUMP TRUCK Replacement for unit #29‐ $135,000, split $35,000 Street/Water/Sewer 35,000 $ 35,000 $ 35,000 $ 35,000 $ E26 SWEEPER Replacement for unit #51 (Total $218K split Streets/Stormwater) 109,000 $ 109,000 $ 109,000 $ 109,000 $ FY26 Tax Increment Total Unscheduled Project Street Construction* Equipment FY24 FY25 FY27 Bonds, Loans, or Other Debt Cash Reserves (Street) Cash Reserves (BaRSAA) 5‐Year Capital Improvements Program: Public Works Department ‐ Streets PROJECT INFORMATION ESTIMATED COST PER YEAR FUNDING SOURCES # Project Name Description & Justification Total Cost FY23 Capital Improvement Program Page 14 of 20 ---PAGE BREAK--- Grants (Various) FY26 Tax Increment Total Unscheduled Project FY24 FY25 FY27 Bonds, Loans, or Other Debt Cash Reserves (Street) Cash Reserves (BaRSAA) 5‐Year Capital Improvements Program: Public Works Department ‐ Streets PROJECT INFORMATION ESTIMATED COST PER YEAR FUNDING SOURCES # Project Name Description & Justification Total Cost FY23 O1 Depot Park EV Chargers Provide Vehicle Charging at Depot Park per CAP 6,000 $ 6,000 $ 6,000 $ 6,000 $ O2 Shop Door Replacement Replace shop door ‐ $18,0000, split Street/Water/Sewer 5,000 $ 5,000 $ 5,000 $ 5,000 $ 1,994,538 $ 1,524,130 $ 86,278 $ 88,130 $ 142,000 $ 154,000 $ ‐ $ 1,076,538 $ 700,000 $ 218,000 $ ‐ $ 1,994,538 $ 18,750,000 $ Estimated Street Cash Reserves for Capital Projects 1,249,130 $ 180,000 $ 180,000 $ 180,000 $ 180,000 $ S# Street Project Priority (no Resort Tax Projects) Estimated Air Quality Grant for Sweeper Purchase ‐ $ ‐ $ ‐ $ 109,000 $ 109,000 $ E# Equipment Priority Estimated Gas Tax Apportionment ‐ BaRSAA 758,603 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ O# Other Improvements Estimated Cash Balance Remaining for Capital Projects at Year‐End 483,603 $ 777,325 $ 1,069,195 $ 1,416,195 $ 1,751,195 $ * Other Priority Legend *Ending cash in FY27 includes $858,603 in BaRSAA Funds and $992592 in Street Maintenance Funds. Capital Improvement Program Page 15 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Water) Impact Fees (Water) Grants (ARPA) Tax Increment Total Unscheduled Projects T1 Upper and Lower Grouse Water Tanks Replace roofing on both water tanks to extend useful life. 30,000 $ 30,000 $ 30,000 $ 30,000 $ T2 Water Plant Remote Telemetry Remote gate. 100,000 $ 100,000 $ 100,000 $ 100,000 $ T3 Reinstate First Creek Supply Possible diversion structure to put First Creek back online $100K ($25K Design and Sampling, $75K Construction). 105,000 $ 5,000 $ 100,000 $ 105,000 $ 105,000 $ D1 Cast Iron Water Main Replacement Project every other year + 10 new hydrants per project. (Spokane Ave., then O'Brien RR Crossing) 5,500,000 $ 2,500,000 $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 4,125,000 $ 1,375,000 $ 5,500,000 $ D2 South Water Storage & Production Variety of projects to increase water capacity in South Whitefish including groundwater production and/or additional storage south of HWY 40. 7,500,000 $ 500,000 $ 1,000,000 $ 3,000,000 $ 3,000,000 $ 5,250,000 $ 1,000,000 $ 6,250,000 $ D3 Wisconsin Ave. Watermain Replacement Replace approximately 1.5 miles of 70 year old 18" watermain along Wisconsin Avenue. Total project estimated at $5M. 5,000,000 $ P1 Lower Grouse Pump Improve Lower Grouse Pump. 10,000 $ 10,000 $ 10,000 $ 10,000 $ E1 RTK Base Station For GPS tracking City Assets and Data Collection 4,130 $ 4,130 $ 4,130 $ 4,130 $ E2 Tankless Water heater Tankless Water Heater at WTP 5,000 $ 5,000 $ 5,000 $ 5,000 $ E3 PICKUP 4 x 4 (150) Replacement for unit #18 ‐ $36k split st/water/sewer 12,000 $ 12,000 $ 12,000 $ 12,000 $ E4 Asphalt Recycling Machine New Equipment to increase productivity for asphalt maintenance Asphalt Recycling Machine $105K split 35,000 $ 35,000 $ 35,000 $ 35,000 $ E5 PICKUP 4 x 4 (150) Replacement for unit #11 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E6 DUMP TRUCK Replacement for unit #25 ‐ $54,000, split $18,000 Street/Water/Sewer 18,000 $ 18,000 $ 18,000 $ 18,000 $ E7 S.U.V. (Freestyle) Replacement for unit #5 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E8 PUMP ‐ 6" TRLR. MOUNT Replacement for unit #169 ‐ $60,000, split $20,000 Street/Water/Sewer 20,000 $ 20,000 $ 20,000 $ 20,000 $ E9 PICKUP 4 x 4 (150) Replacement for unit #3 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E10 PICKUP 4 x 4 (350 ‐ Flatbed) Replacement for unit #8 ‐ $33,000, split $11,000 Street/Water/Sewer 11,000 $ 11,000 $ 11,000 $ 11,000 $ E11 GENERATOR Replacement for unit #92 ‐ $39,000, split $13,000 Street/Water/Sewer 13,000 $ 13,000 $ 13,000 $ 13,000 $ E12 PICKUP 4 x 4 (250) Replacement for unit #17 ‐ $30,000, split $10,000 Street/Water/Sewer 10,000 $ 10,000 $ 10,000 $ 10,000 $ E13 DUMP TRUCK Replacement for unit #29‐ $135,000, split $35,000 Street/Water/Sewer 35,000 $ 35,000 $ 35,000 $ 35,000 $ O1 Automatic Reading System Install two additional Gateways ‐ Total $150K split $75K each Water/Sewer 75,000 $ 75,000 $ 75,000 $ 75,000 $ O2 Shop Door Replacement Replace shop door ‐ $18,0000, split Street/Water/Sewer 5,000 $ 5,000 $ 5,000 $ 5,000 $ O3 Handheld Meter Reader Replacement $6,200, split $3,100 Water/Sewer 3,100 $ 3,100 $ 3,100 $ 13,488,230 $ 3,251,130 $ 1,877,000 $ 3,779,000 $ 3,783,000 $ 795,000 $ 5,250,000 $ 4,613,230 $ 2,375,000 $ ‐ $ ‐ $ 12,238,230 $ 5,000,000 $ Estimated Water Cash Reserves for Capital Projects 1,557,130 $ 1,062,093 $ 1,062,093 $ 1,062,093 $ 1,062,093 $ T# Treatment Project Priority Estimated Water Impact Fee Cash Reserves for Capital Projects 2,515,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ Estimated Grants for Project to Proceed as Scheduled ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ D# Distribution Priority Estimated Bonds, Loans, or Other Debt to Complete Project as Scheduled ‐ $ ‐ $ 2,250,000 $ 3,000,000 $ P# Pumping Project Priority Estimated Cash Balance Remaining for Capital Projects at Year‐End 821,000 $ 256,093 $ $39,186 $568,279 $1,085,372 E# Equipment Priority O# Other Project Priority *Ending cash in FY27 includes $1,140,000 in Water Impact Fees that will be reviewed through the update in FY23. Pumping Stations Equipment Other Priority Legend 5‐Year Capital Improvements Program: Public Works Department ‐ Water PROJECT INFORMATION ESTIMATED COST PER YEAR FUNDING SOURCES Treatment/Supply Distribution Capital Improvement Program Page 16 of 20 ---PAGE BREAK--- Grants (TSEP, RRGL, WRDA) T1 WWTP Improvements Plant upgrade completed in FY22. Decommissioning of lagoons. 1,500,000 $ 1,500,000 $ 1,473,737 $ 26,263 $ 1,500,000 $ C1 Manhole & Pipe Rehab Downtown & Other Various locations ‐ Project every other year 980,000 $ 500,000 $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 980,000 $ 980,000 $ C2 Piping ‐ Future Capacity Enhancements Upgrade 1730 LF of collection mains to enhance capacity as per Wastewater Facility Plan 400,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 400,000 $ 400,000 $ C3 Cow Creek Sewer Extension Engineering & Construction ‐ Extension to the East Edgewood R‐ O‐W (930) TBD TBD C4 Sewer Main Upgrade N of Hospital ‐ Greenwood to ColuUpgrade under‐sized sewer mains to maintain growth TBD TBD P1 Resthaven Improvements Cotinued improvements for Resthaven. 30,000 $ 30,000 $ 30,000 $ 30,000 $ E1 RTK Base Station For GPS tracking City Assets and Data Collection 4,130 $ 4,130 $ 4,130 $ 4,130 $ E2 PICKUP 4 x 4 (150) Replacement for unit #18 ‐ $36k split st/water/sewer 12,000 $ 12,000 $ 12,000 $ 12,000 $ E3 Asphalt Recycling Machine New Equipment to increase productivity for asphalt maintenance Asphalt Recycling Machine $105K split str/wtr/swr 35,000 $ 35,000 $ 35,000 $ 35,000 $ E4 Jet‐Away ‐ Replace 2000 JetAway JAJ‐600R Replacement for unit #37 ‐ $75K 75,000 $ 75,000 $ 75,000 $ 75,000 $ E5 PICKUP 4 x 4 (150) Replacement for unit #11 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E6 DUMP TRUCK Replacement for unit #25 ‐ $54,000, split $18,000 Street/Water/Sewer 18,000 $ 18,000 $ 18,000 $ 18,000 $ E7 S.U.V. (Freestyle) Replacement for unit #5 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E8 PUMP ‐ 6" TRLR. MOUNT Replacement for unit #169 ‐ $60,000, split $20,000 Street/Water/Sewer 20,000 $ 20,000 $ 20,000 $ 20,000 $ E9 PICKUP 4 x 4 (150) Replacement for unit #3 ‐ $27,000, split $9,000 Street/Water/Sewer 9,000 $ 9,000 $ 9,000 $ 9,000 $ E10 PICKUP 4 x 4 (350 ‐ Flatbed) Replacement for unit #8 ‐ $33,000, split $11,000 Street/Water/Sewer 11,000 $ 11,000 $ 11,000 $ 11,000 $ E11 GENERATOR Replacement for unit #92 ‐ $39,000, split $13,000 Street/Water/Sewer 13,000 $ 13,000 $ 13,000 $ 13,000 $ E12 PICKUP 4 x 4 (250) Replacement for unit #17 ‐ $30,000, split $10,000 Street/Water/Sewer 10,000 $ 10,000 $ 10,000 $ 10,000 $ E13 DUMP TRUCK Replacement for unit #29‐ $135,000, split $35,000 Street/Water/Sewer 35,000 $ 35,000 $ 35,000 $ 35,000 $ O1 Automatic Reading System Install two additional Gateways ‐ Total $150K split $75K each Water/Sewer 75,000 $ 75,000 $ 75,000 $ 75,000 $ O2 Shop Door Replacement Replace shop door ‐ $18,0000, split Street/Water/Sewer 5,000 $ 5,000 $ 5,000 $ 5,000 $ O3 Handheld Meter Reader Replacement $6,200, split $3,100 Water/Sewer 3,100 $ 3,100 $ 3,100 $ 3,100 $ 3,245,130 $ 2,231,130 $ 247,000 $ 249,000 $ 253,000 $ 265,000 $ 1,473,737 $ 1,745,130 $ ‐ $ ‐ $ 26,263 $ 3,245,130 $ ‐ $ Estimated Wastewater Cash Reserves for Capital Projects 731,130 $ 399,000 $ 253,000 $ 265,000 $ 265,000 $ T# Treatment Project Priority Estimated Wastewater Impact Fee Cash Reserves for Capital Projects 1,608,000 $ 500,000 $ 400,000 $ 400,000 $ 400,000 $ C# Collection Priority Estimated TIF Funds to Complete WWTP Upgrade Project as Scheduled 26,263 $ ‐ $ ‐ $ ‐ $ ‐ $ P# Pumping Project Priority Estimated Bonds, Loans, or Other Debt to Complete Project as Scheduled 1,473,737 $ ‐ $ ‐ $ ‐ $ ‐ $ E# Equipment Priority Estimated Cash Balance Remaining for Capital Projects at Year‐End 1,608,000 $ 2,260,000 $ 2,664,000 $ 3,076,000 $ 3,476,000 $ * O# Other Project Priority Pumping Stations Equipment Other Priority Legend *Ending cash in FY27 includes $3,308,000 in Wastewater Impact Fees that will be reviewed through the update in FY23. Impact Fees (Wastewater) Tax Increment Total Unscheduled Projects Treatment Collection FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Wastewater) 5‐Year Capital Improvements Program: Public Works Department ‐ Wastewater PROJECT INFORMATION ESTIMATED COST PER YEAR FUNDING SOURCES # Project Name Description & Justification Total Cost FY23 Capital Improvement Program Page 17 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Stormwater) Impact Fees (Stormwater) Grants Tax Increment Total Unscheduled Projects 1 Texas Avenue Stormwater Improvements. Additional funds in Resort Tax. Drainage improvements during road reconstruction project. 150,000 $ 150,000 $ 150,000 $ 150,000 $ 2 Armory Road Stormwater Improvements Drainage improvements to prevent flooding on Armory Rd. 43,100 $ 43,100 $ 43,100 $ 43,100 $ 3 Riverside Pond Improvements Sediment Removal project for stormwater collection pond in Riverside Park. 200,000 $ 200,000 $ 200,000 $ 200,000 $ 4 Monegan Road Phase II Evaluate, design & construction Phase II stormwater collection & outfall improvements. 100,000 $ 100,000 $ 100,000 $ 100,000 $ 5 Whitefish Avenue Stormwater Upgrades Increase capacity to prevent flooding in River's Edge. Carry over from FY22. 187,500 $ 187,500 $ 100,000 $ 87,500 $ 187,500 $ 6 Sump Pump Collection Creekwood, Texas Ave., Crestwood Ave. 250,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000 $ 250,000 $ 7 Park Avenue Pond Improve treatment efficiency in pond by rerouting flow 100,000 $ 100,000 $ 100,000 $ 100,000 $ 1 SWEEPER Replacement for unit #48 (Total $218K split Streets/Stormwater) 2009 109,000 $ 109,000 $ 109,000 $ 109,000 $ 2 SWEEPER Replacement for unit #51 (Total $218K split Streets/Stormwater) 2012 109,000 $ 109,000 $ 109,000 $ 109,000 $ 1,248,600 $ 730,600 $ 150,000 $ 50,000 $ 159,000 $ 159,000 $ ‐ $ 1,161,100 $ 87,500 $ ‐ $ ‐ $ 1,248,600 $ ‐ $ Estimated Stormwater Cash Reserves for Capital Projects 959,100 $ 220,000 $ 210,000 $ 200,000 $ 190,000 $ Estimated Impact Fee Cash Reserves for Stormwater Capital Projects 87,500 $ 32,000 $ 64,000 $ 96,000 $ 128,000 $ Estimated Cash Balance Remaining for Capital Projects at Year‐End 316,000 $ 418,000 $ 642,000 $ 555,000 $ 801,000 $ 5‐Year Capital Improvements Program: Public Works Department ‐ Stormwater PROJECT INFORMATION ESTIMATED COST PER YEAR FUNDING SOURCES Drainage, Collection, and Treatment Improvements Equipment Capital Improvement Program Page 18 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Impact Fees (Paved Trails) Grants Tax Increment Total Unscheduled Projects 1 Kay Beller Park to BNSF Loop trail Design and Construction of paved shared use path in front of Riverbend Condos and Casey Malmquist Property. (Est. $410,000) 2,100,000 $ 100,000 $ 2,000,000 $ 1,925,000 $ 175,000 $ 2,100,000 $ 2 Duck Inn Path Urban Trail around Duck Inn property. (Est. 400' @ $40/ft) TBD TBD 3 River Trail Includes various sections to complete River Trail from City Beach to Smith Fields TBD TBD 2,100,000 $ ‐ $ 100,000 $ 2,000,000 $ ‐ $ ‐ $ 1,925,000 $ 175,000 $ ‐ $ ‐ $ 2,100,000 $ ‐ $ Estimated Impact Fee Cash Reserves for Paved Trail Capital Projects 45,215 $ 65,000 $ 65,000 $ 65,000 $ 65,000 $ Estimated Bonds, Loans, or Other Debt to Complete Project as Scheduled ‐ $ 1,925,000 $ Estimated Cash Balance Remaining for Capital Projects at Year‐End 45,215 $ 10,215 $ 215 $ 65,215 $ 130,215 $ Note: The Bike/Ped Priority list maintained by the City extends past five years. Other projects on the list can be provided upon request. 5‐Year Capital Improvements Program: Public Works Department ‐ Bike/Ped Paths PROJECT INFORMATION FUNDING SOURCES ESTIMATED COST PER YEAR Capital Improvement Program Page 19 of 20 ---PAGE BREAK--- # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Resort Tax) Impact Fees Grants Tax Increment Total Unscheduled Projects 1 Texas Avenue (Edgewood to North Limits) Engineering & construction for roadway improvements with storm sewer and water main replacement. Additional $150,000 included in Stormwater Fund. 3,010,000 $ 3,010,000 $ 3,010,000 $ 3,010,000 $ 2 Armory (E 2nd Street to Dodger Lane) Engineering & construction for roadway improvements with storm sewer and water main replacement. 4,000,000 $ 2,000,000 $ 2,000,000 $ 4,000,000 $ 4,000,000 $ 3 E. 5th Street (Spokane to Pine) Engineering & construction for roadway improvements with storm sewer and water main replacement. 3,000,000 $ 500,000 $ 2,500,000 $ 3,000,000 $ 3,000,000 $ 4 Karrow (W 7th to W 2nd) Engineering & construction for roadway improvements with storm sewer and water main replacements. 3,500,000 $ 500,000 $ 3,000,000 $ 3,500,000 $ 3,500,000 $ Street Projects Subtotal 13,510,000 $ 3,010,000 $ 2,000,000 $ 2,500,000 $ 3,000,000 $ 3,000,000 $ ‐ $ 13,510,000 $ ‐ $ ‐ $ ‐ $ 13,510,000 $ ‐ $ Estimated Resort Tax Cash Reserves for Street Capital Projects 3,529,521 $ 2,356,127 $ 2,403,250 $ 3,101,315 $ 3,163,341 $ Estimated Cash Balance Remaining for Capital Projects at Year‐End 519,521 $ 875,648 $ 778,898 $ 880,213 $ 1,043,554 $ # Project Name Description & Justification Total Cost FY23 FY24 FY25 FY26 FY27 Bonds, Loans, or Other Debt Cash Reserves (Resort Tax) Impact Fees Grants Tax Increment Total Unscheduled Projects 1 Bike Path Connections Armory Path Improvement Project. 260,000 $ 260,000 $ 260,000 $ 260,000 $ 2 Armory Park Improvements Install well at Armory Park to continue irrigation efforts at lower operating costs. 70,000 $ 70,000 $ 70,000 $ 70,000 $ 3 Bike Path Connections 2nd Street Bike Path Reconfiguration 100,000 $ 100,000 $ 100,000 $ 100,000 $ 4 Memorial Park Improvements Irrigation / Field Work. 75,000 $ 75,000 $ 75,000 $ 75,000 $ 5 Bike Path Connections Monegan trailhead and Bike Connection 100,000 $ 100,000 $ 100,000 $ 100,000 $ 6 Armory Park Improvements Armory Park Master Plan Phase IV 450,000 $ 125,000 $ 270,000 $ 55,000 $ 450,000 $ 450,000 $ 7 Bike Path Connections/Maintenance Dalen/Les Schwab Connection. 200,000 $ 200,000 $ 200,000 $ 200,000 $ 9 Bike Path Connections See Bike/Ped Master Plan. 200,000 $ 200,000 $ 200,000 $ 200,000 $ 10 Memorial Park Improvements Restrooms and Pavilion (Est. $75,000 in FY28) 225,000 $ 225,000 $ 225,000 $ 225,000 $ Parks & Bike Path Projects Subtotal 1,680,000 $ 330,000 $ 175,000 $ 225,000 $ 470,000 $ 480,000 $ ‐ $ 1,680,000 $ ‐ $ ‐ $ ‐ $ 1,680,000 $ ‐ $ Estimated Resort Tax Cash Reserves for Park & Bike Path Capital Projects 432,482 $ 154,005 $ 157,085 $ 460,227 $ 478,636 $ Estimated Cash Balance Remaining for Capital Projects at Year‐End 102,482 $ 81,487 $ 13,573 $ 3,800 $ 2,436 $ Note: The City maintains a Resort Tax Street Priority Project list that extends past five years. Other projects on the list can be provided upon request. Resort Tax Parks & Bike Path Projects 5‐Year Capital Improvements Program: Resort Tax ‐ Public Works and Parks & Recreation PROJECT INFORMATION FUNDING SOURCES Resort Tax Street Projects PROJECT INFORMATION FUNDING SOURCES ESTIMATED COST PER YEAR ESTIMATED COST PER YEAR Capital Improvement Program Page 20 of 20