Full Text
Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Welcome! Public Meeting No. 2b Texas Avenue Presentation February 4, 2021 ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Project Contacts City of Whitefish Craig Workman, PE, Public Works Director Karin Hilding, PE, Senior City Engineer Neil DeZort, PE, Assistant Public Works Director Jenny Emmenegger, Office Manager Robert Peccia & Associates (RPA) – Consulting Engineers Brandon Theis, PE, Project Manager Austin Pauly, EI, Engineering Designer/Construction Technician ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Meeting Outline Project Schedule Preliminary Roadway Designs & Typical Sections Public Input ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Fall 2020 • Data Gathering • Newsletter #1 (October 2020) Fall/Winter 2020 • Project Development • Newsletter #2 & Public Meeting #1 (December 2020) Winter/Spring 2021 • Newsletter #3 & Public Meetings #2a & #2b • City Council Plan Approval (Edgewood Place) • Finish Preliminary Engineering • Engineering Design – Phase 1 (Edgewood Place) ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Spring 2021 • Advertising & Bidding (Edgewood Place) • City Council Authorization to Bid (Edgewood Place) • Contractor Selected (Edgewood Place) Summer/Fall 2021 • Public Meeting – “What to Expect During Construction” • Construction of Phase 1(Edgewood Place) • Traffic Detours and Road Closures PHASE 1 – Edgewood Place ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Summer/Fall 2021 • Final Design – Phase 2 (Texas Avenue) • Public Involvement Winter/Spring 2022 • Advertising & Bidding (Texas Avenue) • Contractor Selected (Texas Avenue) • Public Meeting – “What to Expect During Construction” Summer/Fall 2022 • Construction of Phase 2 (Texas Avenue) • Traffic Detours and Roadway Closures PHASE 2 – Texas Avenue ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Please note: Texas Avenue construction is planned for summer/fall of 2022. More public involvement is planned. A future Texas Avenue public meeting and response sheet will be provided during the summer months of 2021. Responses and comments received will be used to help guide the design of Texas Avenue. Final design decisions to be made late summer 2021. Edgewood & Texas Reconstruction Project ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Preliminary Roadway Design & Typical Section – Edgewood to Denver 12-foot wide drive lanes with 2-foot wide curbs 28-foot wide top back of curb to top back of curb New Street Lighting System Need street lights with new path 6 ft wide grass boulevard with 8 ft wide path Option 1 – Boulevard and path on west side of road Option 2 – Boulevard and path on east side of road Let us know which option you prefer! Texas Avenue Reconstruction Project ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Preliminary Roadway Design & Typical Section – Edgewood to Denver Possible 4-way Stop at Denver & Texas If warranted by engineering, stop signs to be reviewed and approved by City Council. New Storm Drain System Combination of roadside ditches, inlets and pipes Opportunity for private sump pump connections If you have a sump pump that you would like to connect, please inform the design team Texas Avenue Reconstruction Project ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Preliminary Roadway Design & Typical Section – North of Denver Street to City Limits Urban with Curb or Rural with Ditches? Sidewalks, Bike Path, or none? Street Lights? Storm drainage? Let us know what you think! Texas Avenue Reconstruction Project ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Let Us Hear From You! Existing Issues/Concerns You live here! Tell us about any existing issues or concerns you may have. Please let us know if you have groundwater issues! Email Distribution List Forward us your email address to receive project updates via email. Comments Please email us at ([EMAIL REDACTED]) any comments you may have.