← Back to Whitefish

Document Whitefish_doc_d7e22f0095

Full Text

SONO-TUBES / PIER PADS / COLUMNS FOOTINGS TRACKING PAD MUST BE IN PLACE TO SCHEDULE (see reverse side of sheet for tracking pad specifications) WALLS FOUNDATION / BASEMENT FOUNDATION WATER PROOFING CONCRETE SLAB TOWNHOUSE INSPECTIONS: UNDERSLAB PLUMBING UNDERSLAB HEATING ROUGH FRAMING COMMON WALL DRYWALL INSPECTIONS ROUGH ELECTRIC ROUGH MECHANICAL ROUGH PLUMBING SHEAR WALL NAILING INSULATION DRYWALL NAILING FINAL MECHANICAL APPLIANCES TAGGED FINAL BUILDING Inspection *City Ordinance Number 03-23 "Prohibits the provision of permanent water and/or sewer service to any newly constructed or remodeled structure until such structure has complied fully with all city codes." Permanent water and/or sewer service will be granted only after all code requirements are confirmed to be complete. Codes include, but are not limited to, such items as: paving, landscaping, required permits & inspections and payment of applicable fees. A financial guarantee in the form of a bond or letter of credit with a specified completion date may be required for any work that cannot be immediately completed. Required Inspections WHITEFISH BUILDING DEPARTMENT Phone: (406) 863-2410 MINIMUM 24 Hours Notice Required To Schedule Appointments A *Temporary Certificate of Occupancy may be issued at the discretion of Building Department with specified dates for completion. A Certificate of Occupancy and Permanent Water/Sewer Service will be issued when ALL City Code Regulations have been met. second layer on each side of the common wall, at all floors, including trusses prior to taping first layer on each side of the common wall, at all floors, including trusses with fire tape applied the house side of the fire wall, at all floors, including trusses require inspection prior to taping the property line side of the fire rated wall, at all floors, including trusses require inspection prior to standing the walls or trusses and with fire tape applied All drywall on the common wall / fire wall must be 5/8" Type X and continuous from the foundation to the underside of the roof sheathing 2 separate fire rated walls 1 - two hour common wall ---PAGE BREAK---