Robert Peccia & Associates – Kalispell, Montana State Park Road Reconstruction Project Welcome! Public Meeting No. 1 November 8, 2018 ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana State Park Road Reconstruction Project Project Contacts City of Whitefish Craig Workman, PE, Public Works Director Karin Hilding, PE, Senior City Engineer Jenny Emmenegger, Office Manager Robert Peccia & Associates (RPA) – Consulting Engineers Brandon Theis, PE, Project Manager ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana State Park Road Reconstruction Project Meeting Outline Purpose of Meeting Overview of Preliminary Project Schedule Review of Previous Planning Documents Review Proposed Street Section Review of Preliminary Design Exhibits Review of Traffic Control Public Input ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Summer/Fall 2018 • Data Gathering • Public Involvement Fall/Winter 2018 • Project Development • Public Involvement Winter/Spring 2018/2019 • Engineering Design – Phase 1 • ROW Acquisition – Phase 2 ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Winter/Spring 2019 • Final Design • Public Involvement Spring 2019 • Advertising & Bidding • Contractor Selected Summer 2019 • Construction of Phase 1 • Traffic Detours PHASE 1 – LION MOUNTAIN LOOP TO HAUGEN HEIGHTS ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Fall 2019 • Final Design • Public Involvement Winter 2020 • Advertising & Bidding • Contractor Selected Spring & Fall 2020 • Construction of Phase 2 (Minimal Construction in July & August) • Traffic Detours PHASE 2 –HAUGEN HEIGHTS TO RAILROAD CROSSING ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana State Park Road Reconstruction Project Review of Previous Planning Documents Transportation Plan – 2009 Identified a Urban Collector for State Park Road Bike/Ped Master Plan – 2017 Identified a path adjacent to State Park Road Utility Master Plans – 2015 Stormwater System Utility Plan Identified a pipe system to replace the roadside ditches, a stormwater detention facility and a need to construct an outfall to Whitefish Lake with water quality treatment; City Standards for Design and Construction ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana What we know from previous Planning Documents Roadway shall be an urban section (curb and gutter) and shall be 32‐feet wide. A new path shall be installed adjacent to the roadway. A new stormwater system shall be installed with detention, treatment and outfall. ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Roadway & Path Section Roadway 32’ from TBC to TBC Path 10’ Wide Preferred, but can be 8’ Wide Minimum Boulevard Need to have a landscape buffer (boulevard) between the roadway curb and path Typically 6’ Wide Thus, section is 46’ to 48’ wide ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Roadway & Path Section – cont’d. Thus, section is 46’ to 48’ wide Existing section is 22’ to 27’ wide (approx.) Existing ROW varies from 45’ to 60’ – PH 1, and from 30’ to 45’ – PH 2 Questions? Path Location – Only on One Side RPA performed analysis of the path being on either the east side and on the west side. Recommendation is for path to be on west side, due to: Increased separation from homes and traveling vehicles Improved connectivity to existing pedestrian facilities and residential areas Fewer underground utility conflicts ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Roadway with Path on West Side Approx. 29’ from roadway edge to closest homes ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Roadway with Path on East Side Approx. 29’ from roadway edge to closest homes ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana RECOMMENDATION: Path on West Side 32’ Wide Roadway Path on West Side to 8’ Wide Boulevard, Typically 6’ With Trees and Street Lights Questions or Comments? ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana State Park Roadway – Preferred Typical Section ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Proposed Street Lighting Street lights are typically spaced every 180‐200 feet. Street lights are typically spaced at intersection and at mid block locations. City standard street lights will be installed. Street lights have house side shields to minimize light trespass. ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana City Standard Street Light ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana State Park Roadway – Other Considerations Resort Tax Funding Whitefish Lake State Park Utility Relocations Right‐of‐Way Acquisitions Traffic Control & Detours ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Traffic Control & Detours – Phase One ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Let Us Hear From You! Existing Issues/Concerns You live here! Tell us about any existing issues or concerns you may have. Sign‐in Sheet Please sign the Sign‐in sheet Comments Please complete Comment Sheets