Full Text
Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Welcome! Public Meeting No. 2a Edgewood Place Presentation February 2, 2021 ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Project Contacts City of Whitefish Craig Workman, PE, Public Works Director Karin Hilding, PE, Senior City Engineer Neil DeZort, PE, Assistant Public Works Director Jenny Emmenegger, Office Manager Robert Peccia & Associates (RPA) – Consulting Engineers Brandon Theis, PE, Project Manager Austin Pauly, EI, Engineering Designer/Construction Technician ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Meeting Outline Project Schedule Preliminary Roadway Designs & Typical Sections Public Input ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Fall 2020 • Data Gathering • Newsletter #1 (October 2020) Fall/Winter 2020 • Project Development • Newsletter #2 & Public Meeting #1 (December 2020) Winter/Spring 2021 • Newsletter #3 & Public Meetings #2a & #2b • City Council Plan Approval (Edgewood Place) • Finish Preliminary Engineering • Engineering Design – Phase 1 (Edgewood Place) ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Spring 2021 • Advertising & Bidding (Edgewood Place) • City Council Authorization to Bid (Edgewood Place) • Contractor Selected (Edgewood Place) Summer/Fall 2021 • Public Meeting – “What to Expect During Construction” • Construction of Phase 1(Edgewood Place) • Traffic Detours and Road Closures PHASE 1 – Edgewood Place ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Summer/Fall 2021 • Final Design – Phase 2 (Texas Avenue) • Public Involvement Winter/Spring 2022 • Advertising & Bidding (Texas Avenue) • Contractor Selected (Texas Avenue) • Public Meeting – “What to Expect During Construction” Summer/Fall 2022 • Construction of Phase 2 (Texas Avenue) • Traffic Detours and Roadway Closures PHASE 2 – Texas Avenue ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Preliminary Roadway Design & Typical Section 12-foot wide asphalt drive lanes with 2-foot wide curbs 28-foot wide top back of curb to top back of curb New Street Lighting System 6 foot wide grass boulevard (Optional, see Response Sheet) 5 foot wide sidewalk (Optional, see Response Sheet) End curb ~250 feet east of Texas. Reconstruct roadway with 12-foot wide asphalt drive lanes and roadside ditches to eastern City Limits. No sidewalk planned east of Texas. Edgewood Place Reconstruction Project ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana New Storm Drain System Combination of roadside ditches, inlets and pipes Opportunity for private sump pump connections If you have a sump pump that you would like to connect, please inform the design team Possible Edgewood Speed Limit Reduction from 35 to 25 mph Design team will be recommending a 25 mph speed limit change to the City Council for review and approval Possible 3-way Stops or RRFB at Colorado Ave. and Texas Ave. Intersections Increased Pedestrian Safety at Edgewood Crossings RRFB – Rectangular Rapid Flashing Beacon (current example at Baker & E 1st Street) If warranted by engineering, additional stop signs to be reviewed and approved by City Council. Edgewood Place Reconstruction Project ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Let Us Hear From You! Existing Issues/Concerns You live here! Tell us about any existing issues or concerns you may have. Please let us know if you have groundwater issues! Response Sheet Edgewood sidewalk response sheet can be found on the City of Whitefish “Current Projects” Public Works Department webpage. Please fill out and return by Friday, February 5th. Comments or Questions? Please email us at ([EMAIL REDACTED]) any comments or questions you may have. A questionnaire form can be found on the City of Whitefish “Current Projects” Public Works Department webpage.