← Back to Whitefish

Document Whitefish_doc_9f03272c6c

Full Text

Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Welcome! Public Meeting No. 2a Edgewood Place Presentation February 2, 2021 ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Project Contacts City of Whitefish Craig Workman, PE, Public Works Director Karin Hilding, PE, Senior City Engineer Neil DeZort, PE, Assistant Public Works Director Jenny Emmenegger, Office Manager Robert Peccia & Associates (RPA) – Consulting Engineers Brandon Theis, PE, Project Manager Austin Pauly, EI, Engineering Designer/Construction Technician ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Meeting Outline Project Schedule Preliminary Roadway Designs & Typical Sections Public Input ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Fall 2020 • Data Gathering • Newsletter #1 (October 2020) Fall/Winter 2020 • Project Development • Newsletter #2 & Public Meeting #1 (December 2020) Winter/Spring 2021 • Newsletter #3 & Public Meetings #2a & #2b • City Council Plan Approval (Edgewood Place) • Finish Preliminary Engineering • Engineering Design – Phase 1 (Edgewood Place) ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Spring 2021 • Advertising & Bidding (Edgewood Place) • City Council Authorization to Bid (Edgewood Place) • Contractor Selected (Edgewood Place) Summer/Fall 2021 • Public Meeting – “What to Expect During Construction” • Construction of Phase 1(Edgewood Place) • Traffic Detours and Road Closures PHASE 1 – Edgewood Place ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Summer/Fall 2021 • Final Design – Phase 2 (Texas Avenue) • Public Involvement Winter/Spring 2022 • Advertising & Bidding (Texas Avenue) • Contractor Selected (Texas Avenue) • Public Meeting – “What to Expect During Construction” Summer/Fall 2022 • Construction of Phase 2 (Texas Avenue) • Traffic Detours and Roadway Closures PHASE 2 – Texas Avenue ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Preliminary Roadway Design & Typical Section 12-foot wide asphalt drive lanes with 2-foot wide curbs 28-foot wide top back of curb to top back of curb New Street Lighting System 6 foot wide grass boulevard (Optional, see Response Sheet) 5 foot wide sidewalk (Optional, see Response Sheet) End curb ~250 feet east of Texas. Reconstruct roadway with 12-foot wide asphalt drive lanes and roadside ditches to eastern City Limits. No sidewalk planned east of Texas. Edgewood Place Reconstruction Project ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana New Storm Drain System Combination of roadside ditches, inlets and pipes Opportunity for private sump pump connections If you have a sump pump that you would like to connect, please inform the design team Possible Edgewood Speed Limit Reduction from 35 to 25 mph Design team will be recommending a 25 mph speed limit change to the City Council for review and approval Possible 3-way Stops or RRFB at Colorado Ave. and Texas Ave. Intersections Increased Pedestrian Safety at Edgewood Crossings RRFB – Rectangular Rapid Flashing Beacon (current example at Baker & E 1st Street) If warranted by engineering, additional stop signs to be reviewed and approved by City Council. Edgewood Place Reconstruction Project ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Let Us Hear From You! Existing Issues/Concerns You live here! Tell us about any existing issues or concerns you may have. Please let us know if you have groundwater issues! Response Sheet Edgewood sidewalk response sheet can be found on the City of Whitefish “Current Projects” Public Works Department webpage. Please fill out and return by Friday, February 5th. Comments or Questions? Please email us at ([EMAIL REDACTED]) any comments or questions you may have. A questionnaire form can be found on the City of Whitefish “Current Projects” Public Works Department webpage.