← Back to Whitefish

Document Whitefish_doc_7547a6766c

Full Text

Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Welcome! Public Meeting No. 1 December 15, 2020 ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Project Contacts  City of Whitefish Craig Workman, PE, Public Works Director Karin Hilding, PE, Senior City Engineer Neil DeZort, PE, Assistant Public Works Director Jenny Emmenegger, Office Manager  Robert Peccia & Associates (RPA) – Consulting Engineers Brandon Theis, PE, Project Manager Austin Pauly, EI, Engineering Designer/Construction Technician ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Meeting Outline  Project Overview and Goals  Overview of Preliminary Project Schedule  Review of Previous Planning Documents and Current City Design Standards  Review Edgewood Place Street Section Options  Public Input ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Fall 2020 • Data Gathering • Newsletter #1 (October 2020) Fall/Winter 2020 • Project Development • Preliminary Engineering • Newsletter #2 & Public Meeting #1 (December 2020) Winter 2020/2021 • Engineering Design – Phase 1 (Edgewood Place) • Newsletter #3 & Public Meeting #2 (January/February 2021) ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Winter/Spring 2021 • Final Design – Phase 1(Edgewood Place) • City Council Plan Approval and Authorization to Bid Spring 2021 • Advertising & Bidding • Contractor Selected Summer/Fall 2021 • Construction of Phase 1(Edgewood Place) • Traffic Detours PHASE 1 – Edgewood Place ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Summer/Fall 2021 • Final Design – Phase 2 (Texas Avenue) • Public Involvement Winter 2021/2022 • Advertising & Bidding • Contractor Selected Summer/Fall 2022 • Construction of Phase 2 (Texas Avenue) • Traffic Detours PHASE 2 – Texas Avenue ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Edgewood & Texas Reconstruction Project Review of Previous Planning Documents  Whitefish Transportation Plan – 2009 Identified an Urban Collector for Edgewood Place and Texas Avenue  City of Whitefish Engineering Standards - 2019  “Connect Whitefish” Bike/Ped Master Plan – 2017 Identified a path adjacent to Texas Avenue Identified an Edgewood path extension to eastern city limits  Utility Master Plans – 2005 Stormwater System Utility Plan ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Whitefish Transportation Plan ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana City of Whitefish Engineering Standards ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana “Connect Whitefish” Bike/Ped Master Plan ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana What we know from previous Planning Documents Urban Collectors have a recommended width (curb to curb) of 32-feet. A new path is recommended along Texas Avenue to promote shared Right-of-Way use for peds/bikes. New underground piped drainage conveyance shall be considered for both Edgewood & Texas. Sidewalks shall be considered for both Edgewood & Texas. ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Existing Roadway Street Section – Edgewood Place Existing roadway not centered within the Right- of-Way. Northern half of Right-of-Way consists of roadside ditches, driveways, fences and trees. ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Proposed Roadway Street Section Options – Edgewood Place Option 1 Option 2  Note: Final design may be a hybrid of the options shown above ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Option 1 - 14’ Lanes with Bike Markings 32-foot wide Urban Collector roadway Could add bike lanes No sidewalk along northern roadway shoulder  Minimizes impacts to existing elements (trees, fences etc.) within northern Right-of-Way area. ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Option 2 - 10’ Lanes with Sidewalk Narrower 24-foot wide roadway Construct sidewalk and boulevard along northern roadway shoulder. Increases impacts to northern Right-of-Way area. ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Proposed Street Lighting Street lights are typically spaced every 180-200 feet. Street lights are typically spaced at intersection and at mid block locations. City standard street lights will be installed. Street lights have house side shields to minimize light trespass. ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana City Standard Street Light ---PAGE BREAK--- Robert Peccia & Associates – Kalispell, Montana Let Us Hear From You! Existing Issues/Concerns  You live here! Tell us about any existing issues or concerns you may have. Email Distribution List  Forward us your email address to receive project updates via email. Comments  Please email us at ([EMAIL REDACTED]) any comments you may have. Questionnaire can be found on the City of Whitefish “Current Projects” Public Works Department webpage.