Full Text
Whitefish Downtown Business District Master Plan Update City Council Recommended Refinements Public Mtg. January 14, 2014 ---PAGE BREAK--- Agenda 1. Review November Meeting Results 2. Master Plan Document Summary 3. Implementation Strategy 4. Next Steps ---PAGE BREAK--- Transportation Framework 1.1 Update the Auto/Truck Framework 1.2 Update the Pedestrian Framework 1.3 Update the Bicycle Framework Implementation Framework 3.3 Anchor Retail Concept Executive Summary 4.4 Build-Out Executive Summary City Hall Design Analysis 5.1 Conceptual Plans 5.2 Schematic Plans and Elevations 5.3 Design Development Plans and Elevations 5.4 Contract Documents Master Plan Document 6.1 Prepare Draft Master Plan 6.2 Prepare Final Master Plan Meetings Committees, Public Council, Stakeholders Conference Calls (As Required) October November December January February 2014 1 2 5 Process & Schedule 4 3 2015 CONCEPTS REFINE REFINE REFINE CONCEPTS REFINE CONCEPT REFINE 1 1 2 3 2 MDT Planning Board Ped/Bike Comm. Jan 14/15 Nov 19/20 Dec 1 3 Feb 17 Dec 18 CONCEPTS CONCEPTS 6 ---PAGE BREAK--- Response Sheet ---PAGE BREAK--- Response Sheet Results- 11/19/2014 Fundamental Concept- Yes No Other 35 1 1 Bicycle Framework- Yes No Other 34 0 5 Whitefish Promenade- Alt. 1 Alt.2 Alt.3 (Spokane Ave Segment) 1 2 34 Whitefish Promenade- Alt. 1 Alt.2 (Baker Viaduct) 5 33 Shopping Emphasis Yes No Other Framework- 33 2 3 First Street Improvements- Alt. 1 Alt.2 Alt.3 1 8 29 Retail Framework- Yes No Other 33 3 2 ---PAGE BREAK--- Fundamental Concept Fundamental Concept Existing Storefront Retail Whitefish Promenade Shopping Loop Pedestrian Enhancement Truck Route Retail Anchor/Parking Shopping Loop Green Space (Depot Park) ---PAGE BREAK--- Bicycle Bicycle Framework— 2014 (Proposed) City Connectors Multi-Use Trail Whitefish Promenade Multi-Use Trail ---PAGE BREAK--- Whitefish Promenade - Two Lane with Protected Bikeway No Change to Existing Parkway Off-street Protected Bikeway Trees can Possibly be Saved Trees will Remain Travel Lanes New Parkway ---PAGE BREAK--- Whitefish Promenade (Baker Viaduct) Widen Sidewalk to 12’ Planters and Concrete Barrier Narrow Each Travel Lane by 6’ 6” Add Light Poles ---PAGE BREAK--- Shopping Emphasis Framework Shopping Emphasis ---PAGE BREAK--- Convert Parallel Parking to Angled Parking Widened Sidewalk Requires14’ Easement or ROW Acquisition Potential New Development Widened Sidewalk Real Estate Office New Lighting and Mid-Block Curb Extensions Widened Travel Lanes First Street Shopping Emphasis- Sidewalk Enhancements & Widened Travel Lanes & Angled Parking ---PAGE BREAK--- Retail Framework Retail Anchor Block Retail Expansion ---PAGE BREAK--- Transportation Framework 1.1 Update the Auto/Truck Framework 1.2 Update the Pedestrian Framework 1.3 Update the Bicycle Framework Implementation Framework 3.3 Anchor Retail Concept Executive Summary 4.4 Build-Out Executive Summary City Hall Design Analysis 5.1 Conceptual Plans 5.2 Schematic Plans and Elevations 5.3 Design Development Plans and Elevations 5.4 Contract Documents Master Plan Document 6.1 Prepare Draft Master Plan 6.2 Prepare Final Master Plan Meetings Committees, Public Council, Stakeholders Conference Calls (As Required) October November December January February 2014 1 2 5 Process & Schedule 4 3 2015 CONCEPTS REFINE REFINE REFINE CONCEPTS REFINE CONCEPT REFINE 1 1 2 3 2 MDT Planning Board Ped/Bike Comm. Jan 14/15 Nov 19/20 Dec 1 3 Feb 17 Dec 18 CONCEPTS CONCEPTS 6 ---PAGE BREAK--- Master Plan Document ---PAGE BREAK--- Master Plan Document ---PAGE BREAK--- ---PAGE BREAK--- Fundamental Concept ---PAGE BREAK--- Capacity Diagram Retail: 200,000 Square Feet Residential: 65 Units Retail Supporting Parking: 420 Spaces ---PAGE BREAK--- ---PAGE BREAK--- Transportation Framework ---PAGE BREAK--- Auto Mobility Streets ---PAGE BREAK--- Baker Existing — Second to Third ---PAGE BREAK--- Baker Contra-Flow — Second to Third ---PAGE BREAK--- Baker Existing — Third to Whitefish River ---PAGE BREAK--- Baker Contra-Flow — Third to Whitefish River Bike Lanes South Bound Travel Lanes Baker Park Rivertrail Park ---PAGE BREAK--- Shopping Loop Emphasis Streets ---PAGE BREAK--- Master Plan Document ---PAGE BREAK--- Existing First Street (Baker to Lupfer) VFW Parking Lot Real Estate Office ---PAGE BREAK--- First Street ---PAGE BREAK--- Existing Lupfer (1st to 2nd) Condos ---PAGE BREAK--- Lupfer (1st to 2nd) ---PAGE BREAK--- Whitefish Promenade — Spokane Protected Bikeway Trailh ---PAGE BREAK--- Whitefish Promenade — Spokane Existing (Third to Sixth) ---PAGE BREAK--- Whitefish Promenade — Spokane (Third to Sixth) ---PAGE BREAK--- Whitefish Promenade — Spokane (Second to Third) ---PAGE BREAK--- Existing Spokane Avenue (South of 2nd Street Intersection) BLOCK 46 (Vacant) Parking Lot ---PAGE BREAK--- Whitefish Promenade— Spokane (Second to Third) ---PAGE BREAK--- Whitefish Promenade — Spokane (Second to Railway) ---PAGE BREAK--- Existing Spokane Avenue (First to Railway) Whitefish Middle School Montana Hair Studio ---PAGE BREAK--- Whitefish Promenade — Spokane (First to Railway) ---PAGE BREAK--- Whitefish Promenade — Spokane (First to Railway) ---PAGE BREAK--- Whitefish Promenade — Spokane (Second to Railway) ---PAGE BREAK--- Whitefish Promenade — Spokane (Second to Railway) ---PAGE BREAK--- Whitefish Promenade — Spokane (First to Railway) ---PAGE BREAK--- Whitefish Promenade — Depot Park to Viaduct ---PAGE BREAK--- O’Shaugnessy Expansion ---PAGE BREAK--- Whitefish Promenade — Depot Park Options ---PAGE BREAK--- Whitefish Promenade — Depot Park to Viaduct ---PAGE BREAK--- Whitefish Promenade — Depot Park Options ---PAGE BREAK--- Whitefish Promenade — Baker/Wisconsin Viaduct One-Sided Multi-Use Trail Alternative Two-Sided Multi-Use Trail Alternative ---PAGE BREAK--- Whitefish Promenade — Baker/Wisconsin Viaduct One-Sided Multi-Use Trail Alternative ---PAGE BREAK--- Whitefish Promenade — Baker/Wisconsin Viaduct ---PAGE BREAK--- Whitefish Promenade — Baker/Wisconsin Viaduct Two-Sided Multi-Use Trail Alternative ---PAGE BREAK--- Whitefish Promenade — Baker/Wisconsin Viaduct ---PAGE BREAK--- ---PAGE BREAK--- Land Use Framework ---PAGE BREAK--- Land Use Framework — Retail Elements ---PAGE BREAK--- Existing Retail Shopping Street Retail Anchor Block Baker Ave Central Ave Railway St City Hall Retail Shopping Street Expansion BLOCK 26 Retail Shopping Street Expansion BLOCK 27 BLOCK 36 Lupfer Ave First St Second St ---PAGE BREAK--- Land Use Framework — Shopping Loop Retail Expansion ---PAGE BREAK--- Land Use Framework — Shopping Loop (Existing Code) ---PAGE BREAK--- Land Use Framework — Shopping Loop (Existing Code) ---PAGE BREAK--- Land Use Framework — Shopping Loop (Alternative) ---PAGE BREAK--- Land Use Framework — Central Avenue South Anchor Retail Shopping Street Expansion Central Ave Third St Fourth St Baker Ave Existing Municipal Lot The Walking Man Gallery Existing Commercial Residence ---PAGE BREAK--- Land Use Framework — Central Avenue South Anchor ---PAGE BREAK--- Land Use Framework —South Anchor (Existing Code) ---PAGE BREAK--- ---PAGE BREAK--- Implementation Framework — Project Priorities ---PAGE BREAK--- Project Priority 1 —Whitefish Promenade Phase I Third Street Edgewood Street Hotel Spokane Ave Viaduct Improvements Trailhead Landscaping Multi-use Trail (interim loop) Protected Bikeway Railway Parking ---PAGE BREAK--- Project Priority 2—Shopping Loop and Central Ave Fourth Street First Street Central Ave Lupfer Ave Railway District Street Improvements Central Avenue Improvements ---PAGE BREAK--- Project Priority 3 —South Central Ave Anchor Fourth Street First Street Central Ave Third Street Replacement Parking Anchor Development Baker Ave ---PAGE BREAK--- Project Priority 4 —Railway District Anchor Parking Second Street First Street Central Ave Railway Street Baker Ave Municipal Parking ---PAGE BREAK--- Project Priority 5 — Parking Second Street O’Brien Ave Central Ave Spokane Ave Kalispell Ave Municipal Parking Municipal Parking Hotel ---PAGE BREAK--- Response Sheet ---PAGE BREAK--- Transportation Framework 1.1 Update the Auto/Truck Framework 1.2 Update the Pedestrian Framework 1.3 Update the Bicycle Framework Implementation Framework 3.3 Anchor Retail Concept Executive Summary 4.4 Build-Out Executive Summary City Hall Design Analysis 5.1 Conceptual Plans 5.2 Schematic Plans and Elevations 5.3 Design Development Plans and Elevations 5.4 Contract Documents Master Plan Document 6.1 Prepare Draft Master Plan 6.2 Prepare Final Master Plan Meetings Committees, Public Council, Stakeholders Conference Calls (As Required) October November December January February 2014 1 2 5 Process & Schedule 4 3 2015 CONCEPTS REFINE REFINE REFINE CONCEPTS REFINE CONCEPT REFINE 1 1 2 3 2 MDT Planning Board Ped/Bike Comm. Jan 14/15 Nov 19/20 Dec 1 3 Feb 17 Dec 18 CONCEPTS CONCEPTS 6 ---PAGE BREAK--- Whitefish Downtown Business District Master Plan Update City Council Recommended Refinements Technical Advisory Committee Mtg. January 7, 2014 ---PAGE BREAK--- ---PAGE BREAK--- ---PAGE BREAK--- ---PAGE BREAK--- Land Use Framework — Lupfer Housing (Existing Code) ---PAGE BREAK--- Land Use Framework — Lupfer Housing (Alternative) ---PAGE BREAK--- Land Use Framework — Lodging (Existing Code) ---PAGE BREAK--- Land Use Framework — Lodging (Alternative) ---PAGE BREAK--- Land Use Framework — Lodging (Existing Code) ---PAGE BREAK--- Whitefish Promenade — Spokane (Third to Second) ---PAGE BREAK--- Whitefish Promenade — Spokane (Second to First) ---PAGE BREAK--- Whitefish Promenade — Spokane (First to Railway)