← Back to Summitcountyutah

Document Summitcountyutah_imagerepository_doc_e0d946d3

Full Text

SUMMIT COUNTY PUBLIC WORKS - ENGINEERING DIVISION SUMMIT COUNTY ROAD RIGHT-OF-WAY SUMMARY OF STRUCTURE ENCROACHMENT APPLICATION REQUIREMENTS ” Complete Application ” Site Plan Showing Structure Encroachment & Erosion Control ” Traffic Control Plan ” Certificate of Insurance ” Completion Bond ” Permit Fee In no case shall a non-yielding structure be place closer than those distances shown in the following table: Clear Zone Distances (In feet from edge of driving lane) POSTED SPEED ADT FILL SLOPES (FT) CUT SLOPES (CUT) 6:1or 5:1to 4:1 3:1 3:1 4:1 to 5:1 6:1 or flatter 40 MPH Or Less Under [PHONE REDACTED] 1500-1600 Over 6000 7-10 7-10 10-12 12-14 12-14 12-16 14-16 16-18 7-10 7-10 7-10 10-12 10-12 10-12 12-14 12-14 12-14 14-16 14-16 14-16 45-50 MPH 750-1500 1500-6000 Over 6000 12-14 16-20 16-18 20-26 18-20 24-28 10-12 12-14 14-16 12-14 14-16 16-18 14-16 18-20 20-22 **Structure shall be place on the right-of-way. *ADT = Average Daily Traffic All structures placed within the right-of-way of a County road shall be flagged with a minimum of a six foot pole with a red or black flag attached to the top during the winter season. **For Detailed Submittal and Construction Requirements, See Ordinance #181-D.