← Back to Summitcountyutah

Document Summitcountyutah_doc_168151d61a

Full Text

Summit County Engineering Division Driveway Encroachment - SWP3 and ECP Permit Application 60 North Main ~ P.O. Box 128,Coalville, UT 84017 Coalville (435) 336-3250 ~ Kamas (435) 783-4351 x 3250 ~ Park City (435) 615-3250 F ax (4 3 5 ) 3 3 6 -3 0 4 3 ~ w w w.summitcounty.org/engineering Engineering Permit # Plan Check # N.O.I. # Project Address Parcel # * The applicant shall be the party responsible for the work and to whom all communications are to be directed. * Driveway encroachment permits and the SWP3 & ECP permits are valid for a period of 180 days from the date the building permit issued. * SWP3 and ECP Requirements: (Refer to Ordinance 3 8 1 -A , Appendix A, B, and C for Requirements and Specifications) * Driveway encroachment must comply with minimum County standards prior to receiving Certificate of Occupancy from the Building Department. (Refer to Ordinance 181-D, Appendix for Requirements and Specifications) * 48 hour notice must be given prior to all inspections. $100 Permit Fee per Driveway Encroachment Permit Fee Total (ENC & ECP/SWP3) ECP/SWP3 Permit Fee Area to be disturbed: $100. Sites 1 Acre or less $10. Per additional Acre Required Inspections: Please initial to verify commitment Staking - prior to building permit issuance Rough Grade - prior to footings inspection Pre-Surface - prior to hard surface of driveway Final - required for certificate of occupancy Flood Zone: A X Shaded X Snyderville Basin Transportation Impact Fee Encroachment Bond ECP & SWP3 Bond Total Due Amt Paid Balance By applying for this permit I acknowledge that I have confirmed that I will be complying with all federal, state and local laws concerning this property and that any permit issued pursuant to my application does not grant to me the right to develop my property under any existing land use and zoning laws, nor does it supersede any federal, state or local law which prevent the grading activity for which I am applying, in the event a permit is issued erroneously. This permit is not a grant of easement or other similar interest. Applicant shall acquire easements from affected fee owners as required. Applicant / Owner Signature: Date Engineering Reviewed By: Date Engineering Approved By: Date Applicant / Owner Phone # Fax # email Mailing Address City Zip Contractor Phone # Fax # email Mailing Address City Zip Bond Money Posted Date Released Temp SIGN ---PAGE BREAK--- Bonds are calculated using the following information: Area of disturbance: L.O.D. (Total Disturbed Area) sq. ft. (1 acre = 43,560 sq. ft.) Disturbed area $.10 / sq.ft. x area = $ Silt fence $1.50 x / ft = $ SWP3 & ECP bond (120% of estimated cost) $ Encroachment bond * $250 per encroachment - lots having slopes less than 10% * $500 per encroachment - lots having slopes between 10-15% * $2000 per encroachment - lots having slopes over 15% Staking Inspection: Required to verify, driveway side yard setback, alignment, offset from intersections (if applicable) and drainage requirements. Front Property Corners must be in place. Place 4 stakes, 2 on each side of the driveway at the street and 2 on each side of the driveway at the front property line. Inspection is required prior to applicant receiving a Building Permit. Rough Grade Inspection: Required to verify that the driveway roughly conforms to approved plans (side yard setback, alignment, offset from intersections, and grade). All Erosion Control Measures shown on the Plans must also be in place. Inspection is required prior to applicant receiving a Footing Inspection from the Building Department. Pre-Surfacing Inspection: Required to verify that the driveway conforms to approved plans (side yard setback, alignment, offset from intersections, and grade). Driveway must be fully graded and formed (if applying a concrete surface). Inspection is required prior to applicant placing the hard surface (Concrete, asphalt pavement, etc.). All Erosion Control Measures shown on the Plans must also be in place. Final Inspection: Required to verify that the driveway conforms to approved plans (side yard setback, alignment, offset from intersections, and grade). Inspection is required prior to applicant receiving a Certificate of Occupancy from the Building Department and a release of their Encroachment Bond. All Erosion Control Measures shown on the Plans must also be in place. ECP Bond Release Inspection: Required to verify that the site has been fully stabilized (re-vegetated). Inspection is required prior to applicant receiving a release of their Erosion Control Bond.