Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Winter Island Park Public Meeting #3 Salem, Massachusetts Draft Master Plan ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Progress to Date Site analysis Programming (Must, May, Must Not Occur) Criteria for choice Goals for the future Vision for the future Review Draft MP Alternatives Draft Master Plan ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Site Context Marblehead Dominion Power Station The Willows Salem Center ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL The evolution of Winter Island... Date: 1940 ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Current Conditions…. ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Current Conditions-Historic Elements ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Goals for the future Adequate parking for daily use Adequate bathhouse facilities Provide space for events Accommodate boat launch use Environmentally sensitive approach Enhance historic buildings Provide accessibility to all areas Provide adequate sitting/viewing areas Establish an organized park setting Create a safe park environment Financially sustainable Provide year round interest Year round management Provide education Enhance connection to water Flexible open space Phased approach ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative A ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative B ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Draft Master Plan Concept ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Common Elements Precedent Images Enhanced shoreline edge Visitor drop off GrassPave Wind Energy Interpretive program Gateway sign Fort restoration ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Precedent Images Interpretive program Formal tree alle’ Pedestrian plaza/storage Amphitheatre Performance stage Relocated Tot lot ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Precedent Images Defined tent sites Bio-infiltration Community gardens Enhanced edge Rain Garden/BMP ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Phasing Concepts: Early Steps ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Phasing Concepts: Early Steps ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Phasing Concepts: Early Steps ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Phasing Concepts: Long-term ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Preliminary Costs: Early Steps Proposed Use Estimated Cost Community Gardens Volunteer New parking lot $80,000 Amphitheatre $800,000 Kayak dock $15,000 Tent site improvements $25,000 Hangar Garage parking $20,000 GrassPave on street parking $60,000 Gateway (sign, gatehouse, paving, lighting, plantings) $175,000 Bio-infiltration area at parking lot and infrastructure $50,000 Moat / Rain Garden restoration (BMP) $20,000 Bathhouse relocate / improvements $50,000 Tot lot relocate and site preparation Volunteer Preliminary Total Costs $1.5M-$2M ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Proposed Improvement Estimated Initial Cost Estimated Long-term Cost The Barracks Building $150,000 $1.5M The USCG Hangar $200,000 $2M Fort Pickering restoration $15,000 $250,000 Hangar Garage improvements $25,000 USCG Hangar pedestrian plaza $200,000 Wind Turbine (1.5MW-9 yr. payback w/ funding) $2M Paths and walkways $20,000 $20,000 Park furnishings/amenities (lighting, benches, trash, bike rack) $270,000 Infrastructure (sewer, water, electric) $20,000 $30,000 Preliminary Total Costs $600k-$800k $6M-$8M Preliminary Costs: Long-term ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Case Studies Rose Island Foundation-Newport, RI  City and private foundation Fort Sewall-Marblehead, MA  Fort Sewall Oversight Committee (Town appointed)  Replacement of lighting, fence, utilities, bathrooms, etc. Friends of Fort Point Channel Fort Phoenix-Fairhaven, MA  Town owned park/DCR beach Castle Hill, Ipswich  B&B / Functions Shake a Leg-Miami, FL  Over 100 community organizations involved  City of Miami partnership  Department of Education ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Funding Opportunities CPA-Conservation Fund  Seed grant funds (convergence of economic prosperity and environment) Chapter 91 resources  Waterfront Enterprise Fund-Salem (associated with waterside activities)  Utilities, recreation, transportation (consistent with Harbor Plan)  All exclusion fees collected as condition Trustees of Reservations (The Barracks Building) Military Groups Local and state organizations involvement  Public and private  FOWI-Friends of Winter Island Department of Planning and Community Development  Watersheet Activation Fund-City budgeting (planning, programming, designing, constructing and maintaining watersheet activation elements, i.e. South River) ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Funding Opportunities Massachusetts Historical Commission  Emergency stabilization  At secretary’s discretion MA Preservation Projects Fund Grant Program  For The Barracks and USCG Hangar Buildings  50% reimbursable matching grant for stabilization/code  $5k-$100k Mass Cultural Fund Preserve America ($20k-$250k) Save America’s Treasures ($20k-$700k) Collaboration with National Park Service  Federal Maritime Installation-Fort Pickering  Beneficial in areas of public education, awareness of services, and visitor facilities/transportation ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Action Strategies Initiate structural assessments for determining long term use Develop partnerships with local organizations Seek funding opportunities with local and state organization Implement park management guidelines Create effective marketing program ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Schedule ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative A ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative A ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Phasing Concepts: Early Steps Alternative A ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative B Precedent Images ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative A Precedent Images ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative B ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative B ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Phasing Concepts: Early Steps Alternative B ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Vision for the Future Alternative B ---PAGE BREAK--- Salem Winter Island Master Plan The Cecil Group •FXM Associates • Susan St. Pierre• Bio Engineering • PAL Discussion: Comments and Ideas for the Future