Full Text
NEIGHBORHOODS ID Name Description Expected Implementation Time Period Significant Support For These Strategies Cost Estimate Source 10 520 Trail Grade Separation at NE 51st St Grade separate the 520 Trail at NE 51st Street Long-Term 3, 1, 2 $3,900,000 Overlake Residential Area neighborhood plan, previous TFP 31 148th Ave NE and NE 51st St Westbound Right-Turn Lane Add a second right turn lane from westbound NE 51st Street to Northbound 148th Avenue NE. Middle-Term 3, 1, 5 $1,032,000 Overlake Access Ramp Interstate Justification Report, Overlake design standards, Overlake Master Plan 46 150th Ave NE and NE 51st Street Traffic Signal Add north leg to intersection of 150th Ave and 51st St and signalize this intersection. Middle-Term 3, 1, 2 $700,000 Overlake Master Plan, previous TFP 71, 157 West Lake Sammamish Parkway Widening & Roundabout Phase 1 Construct a roundabout at West Lake Sammamish Parkway and Bel- Red Road and widen West Lake Samm Pkwy from NE 51st Street to Bel-Red Road. Middle-Term 2, 3 $9,000,000 Idylwood and Overlake Residential Area neighbohood plans, previous TFP ---PAGE BREAK--- NEIGHBORHOODS ID Name Description Expected Implementation Time Period Significant Support For These Strategies Cost Estimate Source 72 140th Ave NE and Redmond Way Turn Lanes Add second northbound left turn lane and extend bicycle lanes from 80th Street through the intersection of 140th Ave and Redmond Way. Middle-Term 3 $1,948,000 Previous TFP 73 Union Hill Rd Phase III Widening Widen Union Hill Rd from 188th Avenue NE to eastern City Limits. Near-Term 2, 5, 3 $4,960,000 SE Redmond Area Transportation Study, previous TFP 76 NE 116th St Widening Phase I Complete bicycle facilities as well as the sidewalk on the north side of NE 116th Street between Red-Wood Road and 167th Place NE Middle-Term 3, 2 $1,719,077 North Redmond neighborhood plan, previous Buildout Plan 78 188th Avenue NE Extension Construct new 188th Ave NE arterial from Redmond Way to Union Hill Rd. Near-Term 2, 5, 3 $23,400,000 SE Redmond Area Transportation Study, Taylor development agreement, previous TFP ---PAGE BREAK--- NEIGHBORHOODS ID Name Description Expected Implementation Time Period Significant Support For These Strategies Cost Estimate Source 79 185th Ave NE Extension (complete) Construct new 185th Ave NE arterial from NE 80th St to Union Hill Rd. Near-Term 2, 5, 3 $2,696,568 SE Redmond Area Transportation Study, UPS development agreement, previous TFP 84 Redmond Way Bridge Modifications and Additions Over Bear Creek Rechannelize bridge, replacing the sidewalk on the south side of bridge with a second eastbound left turn lane. Build a ped/bike bridge on the south side of bridge, designed to accommodate a future connection between Bear Creek Trail and East Lake Sammamish Trail. Long-Term 2, 3, 1, 5 $10,000,000 NE 76th Street Corridor Study, previous TFP ---PAGE BREAK--- NEIGHBORHOODS ID Name Description Expected Implementation Time Period Significant Support For These Strategies Cost Estimate Source 89 NE 76th St & 178th Pl NE Intersection Improvements Improve the intersection and to accommodate turning movements, trucks, bikes, pedestrians, and better sight lines. Near-Term 5, 2, 3 $1,400,000 NE 76th Street Corridor Study, Freight Mobility Study, previous TFP 92 NE 76th St Extension Construct new NE 76th St from 185th Ave NE to 188th Ave NE. Near-Term 2, 5, 3 $15,660,000 NE 76th St Corridor Study, staff, Taylor development agreement, previous TFP 99 NE 70th Street Extension Phase 1 Provide the Right- Of-Way and the interim street improvements Middle-Term 3, 4, 2 $490,000 SE Redmond Area Transportation Study, previous TFP ---PAGE BREAK--- NEIGHBORHOODS ID Name Description Expected Implementation Time Period Significant Support For These Strategies Cost Estimate Source 111 162nd Avenue and 124th Street Intersection Improvement Construct a new traffic signal at 124th Ave NE and 162nd Pl NE. Includes the addition of turn lanes on NE 124th and modifications on 162nd Pl for sight distance. Must meet signal warrant. Middle-Term 3, 2 $896,000 North Redmond neighborhood plan, previous TFP 112 NE 73rd St Extension Construct new NE 73rd St from 185th Ave NE to 188nd Ave NE. Middle-Term 2, 5, 3 $10,250,000 Taylor development agreement, previous TFP 114 NE 80th Street Trail Connection Construct new NE 80th St Trail from 185th Ave NE to 188th Ave NE. Middle-Term 2, 5 $1,598,000 Taylor development agreement, previous TFP 163 SR 202 & NE 124th St Intersection Improvements (complete) Add lanes at the intersection, improve ped and bike facilities, and modify traffic signal control and management Near-Term 3, 5 $5,125,491 North Redmond neighborhood plan, Wedge subarea plan, RedWood Corridor Study, previous TFP ---PAGE BREAK--- NEIGHBORHOODS ID Name Description Expected Implementation Time Period Significant Support For These Strategies Cost Estimate Source 200 Redmond Central Connector Segment II Complete the RCC between Sammamish River Trail and NE 100th Street Near-Term 2, 3, 1, 4 $5,590,000 Willows corridor study, previous TFP 339 NE 95th Street Bridge Replacement Replace the NE 95th Street Bridge over Bear Creek. Near-Term 2, 3 $330,000 Dept. of Ecology Requirement, staff and community input, Bear Creek Neighborhood Plan 356 NE 116th and 172nd Avenue NE Roundabout Construct a roundabout at NE 116th Street and 172nd Avenue NE. Near-Term 2, 3 $6,500,000 NE 116th St corridor design process, North Redmond neighborhood plan, previous TFP 360 NE 70th Street Extension Phase 2 Construction Construct a new street connection up to City standards on NE 70th Street between 180th Avenue NE and Redmond Way Middle-Term 3, 4, 2 $2,500,000 SE Redmond Area Transportation Study, previous Buildout Plan Neighborhoods TFP Project Cost $109,695,136