← Back to Redmo, ND

Document Redmond_doc_eca3439f91

Full Text

Page 1 of 3 Development Services Center, 15670 NE 85th St, Redmond, WA 98052 I [PHONE REDACTED]   Pre-Application Technical Review redmond.gov/LandUseForms Pre-Application Conference– Technical Review* Pre-Application Conference– Comprehensive Plan *Applications for the construction of, or modifications to single-family homes are limited to properties that are constrained by one or more critical areas Pre Application Conference Project Name: Project Address: Parcel Number(s): Square Footage Site: Zone: Acres: Description of Proposal (include number of lots, buildings, proposed use, etc) Contact Information Owner: Applicant: Company Name: Company Name: Mailing Address: Mailing Address: City: City: State: Zip: State: Zip: Phone: Fax: Phone: Fax: Email: Email: Authorized Agent The undersigned hereby certifies that all information submitted with this application is complete and correct to the best of my knowledge. I have read the City of Redmond’s “Purpose of the Pre-Application Conference” statement contained as part of this application. Print Name: Date: Signature: 06-30-2025 SIGN ---PAGE BREAK--- Page 2 of 3 06/30/2025 Development Services Center, 15670 NE 85th St, Redmond, WA 98052 I [PHONE REDACTED] Pre-Application Review A pre-application conference is encouraged before submitting application for projects which involve the platting of property (such as short plats and subdivisions), construction of multifamily or attached housing, and new commercial or additions to existing commercial construction. A pre-application conference is required for all Comprehensive Plan Amendments. Review fees subject to the Development Review Permit Fee Schedule (link). Middle Housing and HB 1110 Ongoing Update: The City of Redmond is currently updating its supporting codes, standards, and design requirements for Middle Housing in accordance with HB1110 to support the land use amendments that went into effect January 1, 2025. Application Submission and Review: If you submit a pre-application or development application related to Middle Housing before the adoption of supporting development standards, the review comments will be based on the current codes, standards, and design requirements as it stands today, specifically relating to fire, development engineering, and building codes. Vesting: Please note that these are subject to change, which may result in additional costs and/or processes for review and permitting, potentially impacting your development unless you have vested the applications as appropriate. Purpose of the Pre-Application Conference The purpose of the pre-application conference is to assist applicants in preparing their development applications for submittal to the City, to identify potential problems and to expedite the processing of development applications. These pre- application conferences are informal and provide a one-stop meeting with City departments responsible for development review. What to Expect • City representatives will describe the type of application necessary, the review process, and applicable development regulations. The pre-application conference may also identify issues and concerns wherever noted. It is not meant to be a detailed review of proposed plans or ideas. • Review time is limited to about 60 mins and is only intended to cover high-level major components of a project. • Pre-applications are not to be used for discussion or review of deviations or departures. • Please be aware that any communication or checklists provided to you at this meeting do not imply approval or conditional approval of the pending application. • Future review of your formal application may require changes, alterations, or additional information to clarify the details of your proposal and design. Many of the City’s applications are subject to review and discretion of other City bodies such as the Design Review Board, City Council, and Technical Committee. Therefore, suggestions in design direction by the members present in this meeting are difficult to make, and additional, unforeseen conditions or requirements may arise during the formal review process by other bodies. Submittal Document Name (documents must used this naming convention) Description Pre-Application Form– REQUIRED Completed Pre-Application Preliminary Site Plan– REQUIRED for development projects See Preliminary Site Plan Guidelines below Detailed Written Narrative– REQUIRED Narrative of your project proposal with as much detail that is available. Proposed or desired density, stories, access, tree retention, etc... Questions–- REQUIRED List of questions for staff that are project or regulation specific. Please be sure to review code prior to submittal and include specific and detailed questions. The review time is limited and staff will only be able to review a limited amount of information depending on the level of complexity or number of questions. Other– OPTIONAL Any other documents that you wish to submit with your application. ---PAGE BREAK--- Page 3 of 3 06/30/2025 Development Services Center, 15670 NE 85th St, Redmond, WA 98052 I [PHONE REDACTED] Application Requirements To schedule a Pre-Application Meeting, submit the following information via the Online Submittal process listed on the website. All submittal documents MUST BE FORMATED INTO A PDF. Please be aware that submittal and scheduling request will not be accept if all formatting requirements are not met. Preliminary Site Plan Guidelines: Preliminary Site Plan, must be legible and dimensions may be approximated; however, the more accurate and complete the information provided the better and more specific the information that staff can provide. The following items are guidelines for the preparation of the Preliminary Site Plan: • Applicant’s name, address, and phone number. • North arrow, scale and date. • Dimensions of the parcel(s). • Location(s), size(s) in square feet and use(s) of any existing building(s) on site. • Location and width of existing and proposed easements for access, drainage, utilities, etc.; existing and proposed driveways, road easements and right-of-way on the site and on adjacent properties, including those across the street. • Proposed street right-of-way dedication (if applicable). • Proposed phasing (if applicable). • Any watercourse (stream, drainage, etc.) on or adjacent to the site. • All Sensitive Areas such as unstable/steep slopes, flood plains, or wetlands on or adjacent to the site. • Location of all fire hydrants within 500 feet of the property. • Location of all utility poles, streetlights, etc., in the public right-of-way adjacent to the site. • General location of significant trees or greater in diameter at breast height and in good health). Application Procedures Pre-application conferences are held each Thursday at City Hall. It may be helpful to bring with you to the meeting any professional staff who will be assisting with the project, such as an architect or engineer. Unless a subsequent application for the proposal is submitted within one year of the pre-application conference a new conference will be recommended.