Full Text
March 2018 TABLE OF CONTENTS Yellow Highlight = Revision Green Highlight = New NOTE: Signature only changes will not be highlighted as a revision. Section Standard Plan Revision Date Notes Preface 3/1/18 Table of Contents 3/1/18 1 STANDARD SPECIFICATIONS 3/1/18 Section Standard Plan Revision Date City of Redmond Standard Plan WSDOT Standard Plan Notes/Changes 2 CONSTRUCTION ALONG/ACROSS CITY RIGHT-OF-WAY Typical Trench Detail 3/1/18 201 Asphalt Overlay For Roadway Trench Repair 3/1/18 202 Pavement Restoration for Window Cuts 3/1/18 203 3 ROADWAY CONSTRUCTION Typical Roadway Sections 3/1/18 301 Edited for clarity Pavement Paning Details 3/1/17 302 Pavement Repair Details 3/1/17 302A Curb & Sidewalk Joints 3/1/18 303 Edited for clarity Concrete Shared Use Path 3/1/18 303A NEW Downtown & Overlake Pedestrian Sidewalk 3/1/18 303B Edited for clarity Typical Curb and Gutter Details 3/1/18 304 Extruded and Barrier Curb Section 3/1/18 304A Asphalt Thickened Edge 7/1/14 304B Type Driveway 3/1/18 305 Edited for clarity Type "1A" Driveway with Adjacent Landscape Area 3/1/18 305A Edited for clarity Type Driveway 3/1/18 306 Edited for clarity Parallel Curb Ramp 7/1/15 307 F-40.12-01 Combination Curb Ramp 7/1/15 308 F-40.14-01 ---PAGE BREAK--- March 2018 TABLE OF CONTENTS 3 continued ROADWAY CONSTRUCTION Perpendicular Curb Ramp 3/1/18 309 F-40.15-01 Slope Change Single Direction Curb Ramp 7/1/15 310 F-40.16-01 Crosswalk Markings & Signs 7/1/15 311 Signalized Crosswalk & Stop Bar 3/1/18 311A Urban Center Crosswalk & Stop Bar 3/1/18 311B Channelization Lane Line Types 3/1/17 312 Patterned Concrete Crosswalk 3/1/18 313 Formerly Detail 423 Back of Sidewalk Bicycle Parking 3/1/16 317 On Street Bicycle Parking 3/1/16 318 Bicycle Lanes 7/1/15 319 Bicycle Lane Channelization 3/1/16 319A Bicycle Lane Treatment at Drop Lane Right Turn 3/1/16 319B Bicycle Lanes at Intersections 3/1/16 319C Sharrow Lanes 3/1/16 320 Bicycle Detector Pavement Marking 7/1/15 320A Typical Pedestrian Railing 3/1/18 321 Edited for clarity Rolled Curb & Gutter Section 3/1/18 322 NEW Curb Transition 3/1/18 323 NEW 4 TRAFFIC / TRANSPORTATION Speed Hump (1of 2) 7/1/15 415 Speed Hump (2of 2) 3/1/17 416 Bump Legend 7/1/15 416A Mast Arm Street Name Signs 3/1/18 417 Edited for clarity Advance Warning Sign/Flasher 7/1/15 418 Lane-Use Pavement Markings 7/1/14 419 Luminaire Pole (Concrete Square) 3/1/18 420 Edited for clarity Typical Luminaire Locations 7/1/15 420A Uniform Luminaire Wiring 3/1/16 421 Series Light Standard 7/1/15 425 Sign & Post Detail 3/1/18 426A Edited for clarity Street Light Pole Mounting Sign 3/1/17 426B ---PAGE BREAK--- March 2018 TABLE OF CONTENTS 4 continued TRAFFIC / TRANSPORTATION Sign & Post In Concrete/Asphalt 7/1/15 426C Sign & Post In Ground 7/1/15 426D Speed Table (1 of 2) 7/1/15 427 Speed Table (2 of 2) 3/1/17 428 Bullet-nose & C-Curb Detail 7/1/15 429 Concrete Octagonal Pole 7/1/15 430 Concrete Pedestrian Scale Pole 3/1/18 430B Minor linework Type 3 Barricade 7/1/15 431 Private Address Sign Detail 3/1/17 432 Pedestrian Push Button Orientation 7/1/15 453 Approved Bicycle Racks 7/1/14 454 Loop Detector Numbering & Spacing 7/1/15 454A Loop Detector Sawcut 7/1/15 455 Sawcut and Conduit Under Curb 7/1/15 456 Loop Detector Splice and Wiring Label 7/1/15 457 Service Disconnect Detail 3/1/17 458 Cabinet Foundation 3/1/16 459A Service Cabinet Foundation 7/1/15 459C Controller and Service Cabinet Footprint 3/1/16 460 Service Cabinet 3/1/18 461 Dimensions & text Interconnect Cable & Conduit Junction Box 7/1/15 462 Junction Box on Slope or Soft Areas 7/1/14 464 CCTV Camera Mounting 3/1/16 465 CCTV Video Cable Connection 3/1/16 465A Junction Box Details (1 of 2) 7/1/15 467A Junction Box Details (2 of 2) 7/1/15 467B ---PAGE BREAK--- March 2018 TABLE OF CONTENTS 4 continued TRAFFIC / TRANSPORTATION Fiber Splice and Storage (1 of 2) 3/1/16 468B Fiber Splice and Storage (2 of 2) 3/1/16 468C Roadway Luminaire and Pole 7/1/15 470 Pedestrian Luminaire and Pole 7/1/15 471 Downtown & Overlake Tree Grate Detail for Furniture Zones 3/1/18 473 Updated for clarity of use Pedestrian Luminaire Location and Pavement Scoring 7/1/14 474 Rumble Strip and 25 MPH Legend 7/1/14 476 Traffic Circle Details 3/1/18 478 Text edits Raised Crosswalk 7/1/15 479 Raised School Crosswalk Signing 7/1/15 480 Raised Crosswalk Signing 7/1/15 481 Speed Cushion (1 of 2) 7/1/15 482 Speed Cushion (2 of 2) 3/1/16 483 Rectangular Rapid Flashing Beacon 3/1/18 484 Signs back to back, text School Zone Speed Radar Sign 3/1/18 485 Signs back to back, text Speed Check Radar Sign 3/1/18 486 Text edits Overlake Village Streetlight 3/1/16 487 Overlake Village Pedestrian Light 3/1/16 488 Pedestrian Wayfinding Sign Detail 3/1/17 489 Standard and Overlake Wayfinding Sign Pole 3/1/17 490 Old Town Wayfinding Sign Pole 3/1/17 491 Public Access Sign 3/1/18 492 Typo Shared Use Path Wayfinding Sign 3/1/18 493 NEW End of Trail Sign 3/1/18 494 NEW Fire Lane Sign 3/1/18 499 Typo 5 CLEARING, GRADING AND TEMPORARY EROSION CONTROL Filter Fabric Fence 7/1/15 502 Stabilized Construction Entrance 3/1/17 503 Temporary Swale 3/1/17 504 Storm Drain Inlet Protection 9/20/07 I-40.20-00 High Visibility Fence 8/11/09 I-10.10-01 Tree Protection Fence 3/1/18 507 NEW ---PAGE BREAK--- March 2018 TABLE OF CONTENTS 6 STORMWATER Concrete Inlet 1/27/17 B-25.60-01 Updated WSDOT Standard Plan Catch Basin - Type 1 1/26/17 B-5.20-02 Updated WSDOT Standard Plan Catch Basin - Type 1L 1/26/17 B-5.40-02 Updated WSDOT Standard Plan Catch Basin - Type 2 2/07/12 B-10.20-01 Updated WSDOT Standard Plan Typical Orientation of Type 2 Catch Basin in City Street Section 3/1/17 609A Typical Catch Basin Placement 3/1/17 609B Flow Control Structure 3/1/18 610 Edited text Rectangular Solid Metal Cover 1/26/17 B-30.20-03 Updated WSDOT Standard Plan Miscellaneous Details for Drainage Structures 1/26/17 B-30.90-02 Updated WSDOT Standard Plan Manhole Type 3 1/26/17 B-15.60-02 Updated WSDOT Standard Plan Stormwater Valve 3/1/17 611 Valve Box Extension 3/1/17 612 Stormwater Shear Gate 3/1/17 613 Stormwater Manhole/Catch Basin Adjustment Detail 3/1/18 615 Design & text Detention Vault Access Manhole Lid Over Low Point 3/1/18 616 Text edits Filter Vault Access 3/1/17 617A Thru Curb Inlet Frame & Grate with Vertical Curb Installation 3/1/17 618 Combination Inlet 3/15/12 B-25.20-01 Updated WSDOT Standard Plan Rectangular Vaned Grate 1/26/17 B-30.30-02 Updated WSDOT Standard Plan Rectangular Herringbone Grate 1/26/17 B-30.50-02 Updated WSDOT Standard Plan Headwall & Rip Rap 3/1/17 620 Lot Drain Trench 3/1/18 621 Divided into 2 details; 621 & 623 Stenciling Detail 3/1/17 622 Stormwater Cleanout 3/1/18 623 NEW Sidewalk Underdrain System 3/1/18 630 Text edits Catch Basin Frame and Grate Replacement 3/1/17 631 Rectangular Frame (Reversible) 1/26/17 B-30.10-02 Updated WSDOT Standard Plan Soil Amendment and Depth 3/1/18 632 Text edits Permeable Pavement Section (Private Use Only) 3/1/18 643 Text edits Functional Equivalent Infiltration Sidewalk 3/1/18 645 Text edits Pervious Concrete Sidewalk (Private Use Only) 3/1/18 646 Text edits ---PAGE BREAK--- March 2018 TABLE OF CONTENTS 6 continued STORMWATER Permeable Pavement on Slopes (Private Use Only) 3/1/18 647 Text edits Roof Rain Harvesting 3/1/17 650 Bioretention Facility 3/1/18 655 Text edits Bioretention Plant Palette 3/1/17 657 Bioretention Curb Extension 3/1/17 659 Bioretention Check Dam 3/1/17 661 Bioretention In-line Curb Cut 3/1/17 663 Bioretention Side Curb Cut 3/1/17 665 Bioretention Outlet Structure 3/1/18 667 Text edits Bioretention Clean-Out 3/1/18 669 Text edits Hydrant Access at Planter or Bioretention 3/1/18 671 Text edits Perforated Pipe Connection 3/1/18 673 Text edits 7 WATER Corporation Stop Service Connections 3/1/18 701A Updated signature Curb Stop Connection 3/1/18 701C Updated signature 5/8” x 3/4" to 2" Meter Setter Details 3/1/18 702 Updated signature Standard Meter Locations 3/4" to 2" Meters 3/1/18 703 Updated signature Double Service Manifold 3/1/18 703A Updated signature Triple Service Manifold 3/1/18 703B Updated signature Meter Box Location within Planting Area 3/1/18 703C Updated signature Residential Fire Sprinkler Details 3/1/18 704 Updated signature Water Meter Plan View Meter Details 3/1/18 705 Updated signature Water Meter Sections 6” Meter Details 3/1/18 705A Updated signature, text edits Combination Air Release & Vacuum Valve Assembly 3/1/18 706 Updated signature Blow-off Assembly 3/1/18 707 Updated signature 6" & 8" PRV Station Plan 3/1/18 708 Updated signature 6" & 8" PRV Station Plan and Section 3/1/18 709A Updated signature, text edits 6" AND 8" PRV Station Section 3/1/18 709B Updated signature, text edits 6" & 8" PRV Station Misc. (Catch Basin) Details 3/1/18 710A Updated signature 6" & 8" PRV Station Misc. (Ladder) Details 3/1/18 710B Updated signature Irrigation BackFlow Preventor 3/1/18 711 Updated signature Fire Hydrant and Standpipe Location 3/1/18 712 Updated signature ---PAGE BREAK--- March 2018 TABLE OF CONTENTS 7 continued WATER Fire Hydrant Assembly 3/1/18 713 Updated signature Fire Sprinkler System Backflow Preventer (Section A) 3/1/18 714 Updated signature, text edits Fire Sprinkler System Backflow Preventer (Section B) 3/1/18 714A Updated signature, text edits Hydrant Location within Planting Area 3/1/18 716 Updated signature Valve Box Detail 3/1/18 718 Updated signature Exempt Irrigation Meter Location Requirements 3/1/18 719 Updated signature 5/8” X ¾” and 1” Meter in Sidewalk 3/1/18 720 Updated signature 5/8” X ¾” and 1” Double Meters in Sidewalk 3/1/18 721 Updated signature 1-1/2” and 2” Meter in Sidewalk 3/1/18 722 Updated signature 8 SEWER Side Sewer Cleanout 3/1/18 810 Updated signature Drop Connection 3/1/18 820 Updated signature Side Sewer 3/1/18 830 Updated signature Side Sewer Marker 3/1/18 832 Updated signature 48" Standard Manhole 3/1/18 840 Updated signature, text edits 48” Saddle Manhole 3/1/18 841 NEW Intersection of Sewers at Manhole 3/1/18 842 Updated signature Sewer Manhole Frame & Cover 3/1/18 843 NEW Bollard Barrier 3/1/18 890 Updated signature 9 MISCELLANEOUS Mailbox Standard 3/1/18 901 Updated signature Cluster Box Mailbox Standard 3/1/18 901A Updated signature Double Mailbox Standard 3/1/18 902 Updated signature Survey Monument Case and Cover 7/1/15 903 6' Wood Fence 3/1/18 904 Updated signature Structural Soil for Street Trees 3/1/18 907 Dimensions & text edits Rock Wall Under 4 Feet 3/1/18 909 Bollard 3/1/16 911 Irrigation Control Panel 7/1/14 920 Parks Double Check Valve 3/1/16 921 Irrigation Trench 3/1/17 922 Irrigation Thrust Block 3/1/18 923 Title change Irrigation System Gate Valve 3/1/18 925 Title change Irrigation Control Valve 3/1/18 926 Title change Irrigation Quick Coupler 3/1/18 927 Title change Rainbird 5500 & 6500 Series Head & Swing Joint 3/1/16 928 Rainbird 1800 Series Swing Joint 3/1/17 929 Irrigation Valve Box Installation 3/1/18 930 Title change ---PAGE BREAK--- March 2018 TABLE OF CONTENTS 99 DESIGN GUIDANCE Sidewalk Ramp Layout 7/1/14 DG01 Crosswalk Accessibility Design Standards 7/1/15 DG02 Sight Distance Triangle 7/1/14 DG03 Standard Intersection Head Numbers & Phasing 7/1/14 DG04 Traffic Circle Dimensions 7/1/14 DG05 120’ Hammerhead Alternate 7/1/14 DG06 120’ Hammerhead 7/1/14 DG07 60’ Y 7/1/14 DG08 90’ Cul-de-Sac 7/1/14 DG09 Typical Rockery Details Post Const. Guides 3/1/18 DG10 Edited for clarity Storm/Sewer Facility Access Road 3/1/18 DG11 Edited for clarity Pedestrian Clear Zone 3/1/17 DG12 46’ Rustic Street Section 3/1/18 DG13 Edited for clarity 46’ Rustic Street Parking Section 3/1/18 DG14 Edited for clarity 46’ Rustic Street Plan View 3/1/18 DG15 Edited for clarity 53’ – 55’ Rustic Street Section 3/1/18 DG16 Edited for clarity Stormwater Pond/Treatment Sign 3/1/18 DG17 Title change & typo Encroachment Detail (Below grade) 6/2018 DG18 NEW Encroachment Detail (Awnings, Canopies, Marquees and Signs 8-feet to 15-feet) 6/2018 DG19 NEW Encroachment Detail (Plan View) 6/2018 DG20 NEW 2018 DELETED DETAILS Downtown Pedestrian Sidewalk with Ceramic Permeable Paver Band 303C Directional Paver Detail 303D Patterned Concrete Crosswalk 423 Moved to Section 3 as 313 Earth Dike 505 Perimeter Dike/Swale 506