Full Text
Wet Weather Plan Approved for Construction Wet Weather Plan No.: Date: Storm: Storm: These Wet Weather Plans (WWP) have been reviewed as part of the Construction Civil Review (CCR) process. If no changes were made after the CCR approval, these WWP shall be separated from the approved CCR set and sent to the City with applicable fees to obtain a WWP number and approval signature from the storm water reviewer(s). No further review is required. If there have been changes to the WWP following CCR approval, then the revised plans shall be sent to the storm water reviewer for further review and approval. This approval is for the design concept only. These plans appear to be in conformance with the City of Redmond design standards for construction. The owner is required to provide designs and plans in accordance with applicable City standards and assures that construction is accomplished in accordance with those standards. The owner and/or design engineer and/or developer may be required to make necessary approved field revisions to correct any errors or omissions found on the approved plan.