← Back to Redmo, ND

Document Redmond_doc_841d5186d2

Full Text

STATE ENVIRONMENTAL POLICY ACT (SEPA) DETERMINATION OF NON-SIGNIFICANCE For more information about this project visit www.redmond.gov/landuseapps PROJECT INFORMATION IMPORTANT DATES PROJECT NAME: Hopelink COMMENT PERIOD Depending upon the proposal, a comment period may not be required. An is placed next to the applicable comment period provision. There is no comment period for this DNS. Please see below for appeal provisions. This DNS is issued under WAC 197-11-340(2), and the lead agency will not make a decision on this proposal for 14 days from the date below. Comments can be submitted to the Project Planner, via phone, fax (425)556-2400, email or in person at the Development Services Center located at 15670 NE 85th Street, Redmond, WA 98052. Comments must be submitted by 02/02/2017. APPEAL PERIOD You may appeal this determination to the City of Redmond Office of the City Clerk, Redmond City Hall, 15670 NE 85th Street, P.O. Box 97010, Redmond, WA 98073-9710, no later than 5:00 p.m. on 02/17/2017, by submitting a completed City of Redmond Appeal Application Form available on the City’s website at www.redmond.gov or at City Hall. You should be prepared to make specific factual objections. DATE OF DNS ISSUANCE: For more information about the project or SEPA procedures, please contact the project planner. SEPA FILE NUMBER: SEPA-2016-02054 PROJECT DESCRIPTION: SEPA for EPF, SPE and Shoreline Permit for new construction of Hopelink facility PROJECT LOCATION: 15511 NE 90TH ST SITE ADDRESS: 15511 NE 90TH ST REDMOND, WA 98052 APPLICANT: Poppi Handy LEAD AGENCY: City of Redmond The lead agency for this proposal has determined that the requirements of environmental analysis, protection, and mitigation measures have been adequately addressed through the City’s regulations and Comprehensive Plan together with applicable State and Federal laws. Additionally, the lead agency has determined that the proposal does not have a probable significant adverse impact on the environment as described under SEPA. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. SIGNATURE: Planning Director Robert G. Odle RESPONSIBLE OFFICIAL: CITY CONTACT INFORMATION PROJECT PLANNER NAME: PHONE NUMBER: EMAIL: Sarah Pyle RESPONSIBLE OFFICIAL: SIGNATURE: [PHONE REDACTED] [EMAIL REDACTED] 15670 NE 85th Street Redmond, WA 98052 Address: Linda E. De Boldt Public Works Director January 19, 2017 ATTACHMENT C ---PAGE BREAK--- VICINITY MAP Hopelink Parcel Number(s): [PHONE REDACTED] Project Location ATTACHMENT C