Full Text
DOWNTOWN ID Name Description Expected Implementation Time Period Significant Support For These Strategies Cost Estimate Source 81 164th Ave NE Extension Construct new 164th Ave NE from NE 76th St to Cleveland St. Near-Term 1, 2, 3 $3,500,000 Downtown East-West Corridor Study, previous TFP 83 164th Ave NE Rechannelization Reconfigure 164th Ave NE from Redmond Way to NE 87th St Near-Term 1, 2, 3 $654,000 Previous TFP 95 166th Ave NE Rechannelization Reconfigure 166th Ave NE from NE 85th St to NE 104th St to 1 through lane in each direction, center left turn lane and bike lanes. Near-Term 2, 3 $850,000 Education Hill neighborhood plan, previous TFP 115 Redmond Way & Cleveland St Improvements including wb BAT lane and Couplet Conversion Convert Redmond Way and Convert Cleveland Street to two-way circulation Near-Term 1, 2, 3, 4 $17,424,764 Downtown East-West Corridor Study, Sound Transit for BAT lane, previous TFP 116 Cleveland Streetscape Improve Cleveland Street to a pedestrian-friendly Main Street. Near-Term 1, 3 $6,322,000 Development agreement, Downtown East-West Corridor Study, previous TFP ---PAGE BREAK--- DOWNTOWN ID Name Description Expected Implementation Time Period Significant Support For These Strategies Cost Estimate Source 254 161st Ave NE Extension (complete) Construct new 161st Ave NE from Bear Creek Pkwy Extension to Redmond Way. Improvements include 1 through lane in each direction, left turn lanes, bike lanes, parking, sidewalks, street lights, storm drainage, right-of-way, easements and traffic signals at Cleveland St and Bear Creek Pkwy. Near-Term 1, 2, 3, 4 $6,850,000 Downtown East-West Corridor Study, previous TFP 323 Redmond Central Connector Segment 1 Complete the Redmond Central Connector between the Bear Creek Trail and Sammamish River Trail Near-Term 1, 2, 3, 4 $4,750,000 Downtown Transportation Master Plan, previous Buildout Plan 324 Downtown Shared Parking Facility Shared parking facility at the intersection of Leary Wy and Bear Creek Parkway. Near-Term 1, 4 $500,000 Previous TFP 327 Cleveland Street Sidewalk Rehabilitation Replace sidewalks between 164th Avenue NE and 168th Avenue NE. Near-Term 3, 1, 4 $271,000 Staff and community input Downtown TFP Project Cost $41,121,764