Full Text
City of Redmond Business License: Contractors are required to obtain a City of Redmond business license prior to working in the City. Get a Redmond City business license here: WA State DOR For questions, contact the business license office at [PHONE REDACTED] or [EMAIL REDACTED]. Electronic Plan Standards Files that are improperly named or formatted incorrectly may be rejected at intake. Paper plans, incomplete applications and applications delivered by courier will not be accepted and will result in the application being deemed incomplete. • All plans must be drawn to scale and have scale noted on each sheet • All documents must be uploaded as a PDF • All plans must be uploaded in landscape orientation (horizontal position) • All plans must be named accordingly per the submittal requirements in BOLD • All plans must be flattened and reduced Link to current International, Washington State Amendment and City of Redmond building codes Demolition fees are non-refundable. Demolition fees are collected prior to the per- mit being reviewed. All demolition permits on a parcel must be FINALED before an associated Building Permit can be issued. Any structure more than 200 square feet in size requires a separate demo permit. For partial demolition projects, where the entire building is not being removed, a build- ing permit is required. Demolition Submittal Packet Only for whole building demolitions redmond.gov/BuildingPermits SUBMITTAL REQUIREMENTS CHECKLIST Anticipated demolition start date: Completed Demolition Application Form Salvage Assessment: Provide a Salvage and Deconstruction Assessment completed by a certified salvage verifier. Detailed Site Plan: The site plan must show property lines, trees, and ALL other Demolition Checklist items. Asbestos Abatement Report: Provide the asbestos abatement report from the asbestos removal company. Puget Sound Clean Air Agency Notification: File an Asbestos/Demolition Notification with Puget Sound Clean Air Agency Rodent Abatement: Declaration due at time of submittal. Certification due prior to pre-construction meeting. SEPA Checklist: If the structure being demolished is over 30,000 SF, a SEPA review is required. Apply for Permits Online: Submit a request for a permit through the PRO (Plan Review Online) portal. Once your permit request is processed, you will receive detailed instruction about how to upload the submittal documents. Application forms and information can be found here: Development Services Center I Redmond, WA All documents listed are required at time of submittal. Published: 10/2025 Page 1 of 5 ---PAGE BREAK--- Water Supply Date Yes No Meter to be removed Yes No Meter to remain and be protected Yes No Private well* or Monitoring Well (Call Public Works Natural Resources [PHONE REDACTED]) To be filled and capped per WAC 173-160 To be used for other purposes Sanitary Sewer Yes No Sewer to be capped Yes No Existing line to remain and be used by new structure Septic System Yes No Tank to be removed* Yes No Tank to be drained and filled* Electrical Supply Yes No Electricity to be shut-off and meter removed** Gas/Oil Yes No Gas to be shut-off and meter removed Yes No Remove fuel or oil tanks. Complete underground/above ground storage Tank closure checklist (Call Fire Prevention Division: [PHONE REDACTED]) Existing Foundation Yes No Foundations destroyed and removed Yes No Basement - Destroyed or filled Yes No All debris removed from site – lot to be restored to original condition Fire Information Yes No Fire alarm system removal? Yes No Fire alarm system partial removal? Yes No Fire Sprinkler system removal? Yes No Fire Sprinkler system partial removal? Yes No Knox Box to be removed? Yes No Is the building available to use for Fire Department training prior to demolition?*** If yes, please provide the best means of contact: * Call King County Health Department: [PHONE REDACTED] Call Puget Sound Energy: [PHONE REDACTED] for applicable permits Call Redmond Fire Training Division: [PHONE REDACTED] for more information DEMOLITION CHECKLIST Important Information • All demolition permits on a parcel need to be FINALED before an associated Building Permit can be issued. • Construction debris must be taken to an approved King County Facility. You must report demolition waste. • Department of Ecology Guidance: How to Find and Address PCBs in Building Materials (wa.gov) • Potential Cultural Resources/Historic Preservation may be required. • If you are relocating a structure, more information may be required. Contact [EMAIL REDACTED] for more information. • No tree removal is allowed as part of the demolition permit. A separate tree removal permit is required. Published: 10/2025 Page 2 of 5 ---PAGE BREAK--- Print Name: Signature: Date: This form is to be submitted with all demolition permits at time of application. Permit Number: Site Address: I understand the following requirements apply to my demolition permit. 1. Rodent abatement must begin at least 15 days before the start of demolition. 2. Rodent abatement must continue until the start of demolition. 3. Project shall have pre-construction meeting prior to the start of demolition. 4. I must provide a fully executed Rodent Abatement Certification signed by a licensed pest control agent at the pre- construction meeting or emailed to [EMAIL REDACTED] prior to the pre-construction meeting. 5. In addition to the Rodent Abatement Certification, bait stations or other evidence of an ongoing rat abatement program should be easily visible at the pre-construction meeting. 6. Site inspectors cannot waive the rodent abatement requirement. Rodent Abatement Declaration For compliance with King County Board of Health Code Title 8, Chapter 8.06 redmond.gov/BuildingPermits Published: 10/2025 Page 3 of 5 SIGN ---PAGE BREAK--- Print Name: Signature: Date: This form is to be submitted to [EMAIL REDACTED] prior to the pre-construction meeting or to the site inspector at the pre-construction meeting. Permit Number: Site Address: Name of Licensed Pest Control Company: Company Phone number: License No. of Company: I hereby certify that: My firm, as shown above, has a contract for rodent abatement at the noted site address. • We began rodent abatement on this date: (at least 15 days prior to the start of demolition) • Our most recent monitoring inspection occurred on this date: • The rodent abatement program complies with any guidelines and recommendations adopted by the King County Public Health Department or the Washington State Department of Agriculture for rodent abatement and the use of pesticides. • Our contract for rodent abatement services will operate until demolition begins. Rodent Abatement Certification For compliance with King County Board of Health Code Title 8, Chapter 8.06 redmond.gov/BuildingPermits Published: 10/2025 Page 4 of 5 SIGN ---PAGE BREAK--- Demolition Permit Application redmond.gov/BuildingPermits Site address: Suite/FLR/RM: Tax parcel number: Project name/Tenant: Plat name/Lot number: Property owner: Mailing address: City State: Zip: Value of Demo: $ The value shall include all materials and labor for the project. SITE LOCATION DETAILED DESCRIPTION OF WORK Building Square Feet: Number of Units: Existing Use: Commercial Multi-Family Mixed Use Residential Garage Accessory Structure TYPE OF WORK Contact Person: Company Name: Email: Phone: Mailing address: City: State: Zip: APPLICANT Lender Name: Email Phone Mailing address: City State: Zip: LENDER INFORMATION N/A Company name: Email: Phone: UBI State Contractor License Mailing address: City State: Zip: CONTRACTOR Expiration of Permit: Per RMC 15.08 Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 365 days after the date of filing unless such application has been pursued in good faith or a permit has been issued; except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 365 days each. The extension shall be requested in writing and justifiable cause demonstrated. I hereby certify that I have read and examined this application and know the same to be true and correct, and I am authorized to apply for this permit. Print Name: Date: Signature: BUILDING OWNER OR AUTHORIZED AGENT Published: 10/2025 Page 5 of 5 Residential SIGN