← Back to Redmo, ND

Document Redmond_doc_4a10f971b4

Full Text

Last updated 1/2019 Applications/Current Forms Page 1 of 2 TOTAL # of Fixtures FIXTURES - ENTER QUANTITY Office Use Only DATE: PLUM: PPLN: ACCEPTED BY: I hereby certify that I have read and examined this application and know the same to be true and correct, and I am authorized to apply for this permit. Print Name: Date: Signature: SITE LOCATION DETAILED DESCRIPTION OF WORK Company name: Mailing address: City: State: Zip: Phone: Contact person: Company name: Mailing address: BUILDING OWNER OR AUTHORIZED AGENT City of Redmond Development Services Center, 15670 NE 85th St, Redmond, WA 98052 [PHONE REDACTED] APPLICANT INFORMATION Plumbing Application If applicable: Is this work attached to an existing building permit? Backflow Preventer & Vacuum Breaker Backwater Valve Bathtub Clothes Washer Dishwasher Drinking Fountain Electric Water Heater Floor Drain Garbage Disposal Grease Interceptor Hose Bib Irrigation System Medical Gas Piping Roof Drain Sewage Ejector Shower/Valve Replacement Sink (Bar) Sink (Bathroom) Sink (Floor, Mop) Sink (Kitchen) Sink (Utility & Laundry Tray) Sink (3 Compartment) Toilet Urinal Water Service Water Softener Other *Value of Plumbing work Site address: Suite/FLR/RM: Tax parcel number: Project name/Tenant: Plat name/Lot number: Property owner: Mailing address: City: State: Zip: *Value of Construction: The value of construction shall include the prevail- ing fair market value of all labor, mate- rials and equipment, whether actually paid or not, needed to complete the work. PLUMBING CONTRACTOR INFORMATION State contractor’s license Expiration date: City of Redmond business license E-mail: City: State: Zip: Phone: E-mail:  Residential  Multi-family  Mixed Use  Commercial TYLE/WORK CLASS Water Piping Repair/Replace SIGN ---PAGE BREAK--- Last updated 1/2019 Applications/Current Forms Page 2 of 2 Plumbing Permit Checklist When A Plumbing Permit is Required The City of Redmond requires a plumbing permit before a plumbing system or fixture is installed, altered, or remodeled. The City does not require a permit to stop leaks or clear stoppages unless the piping being repaired is altered or replaced. New or replacement gas water heaters are processed under a MECHANICAL PERMIT New or replacement electric water heaters are processed under a PLUMBING PERMIT New commercial, multi-family, and mixed-use buildings  PLUMBING PLAN REVIEW IS REQUIRED FOR THE FOLLOWING PROJECTS Installation/alterations of medical gas systems   Installation of commercial kitchens, deli’s or three compartment sinks. Installation of any grease interceptors. SUBMIT THE FOLLOWING FOR PLAN REVIEW - PLEASE SUBMIT ALL MATERIALS ON A USB FLASHDRIVE.      System Sizes - Size of sanitary and potable water systems Riser diagram - Riser diagram of waste and vent, potable water and rainwater systems, indicating sizes Medical Gas Piping - Medical gas piping riser diagram indicating type of gas, bottle storage room and size of piping Location - Location and type of proposed fixtures Plan view - 1/8” minimum scale. Details - 1/4” minimum detail scale OTHER INFORMATION The Washington State Building Code Council did not adopt any fuel gas piping, combustion air or venting of equipment under the 2015 Uniform Plumbing Code. See the 2015 International Mechanical Code. The installation of a backflow prevention device (including those installed with a residential lawn sprinkler system) requires that a test report specified in Washington Administrative Code (WAC) 603.3.3 be provided at the job site at the time of final inspection. An intake appointment is required for all plan review projects and three or more over the counter applications. Please call [PHONE REDACTED] or [EMAIL REDACTED] to schedule an appointment. Electronic plans that do not meet the requirements below will fail and will result in the application being deemed incom- plete and will not be reviewed until complete. All USB drives may only contain documents being submitted to the City for proposed project. A. File Naming Standards: Bolded items noted in Section II indicate the naming convention in which the particular submittal must be named. For example, the Site Plan must be saved as Site Plan. B. Plan Sheet Standards: All plans must be drawn to scale, and have scale noted on each sheet. C. Acceptable File Types Plans, calculations, reports and supporting documents must be uploaded as a PDF. D. Plan Orientation: All plans must be uploaded in “Landscape” format in the horizontal position. E. Flatten and merge separate sheets into one file before submitting to the City for review. For example, all sheets in the structural plan set shall be one file named Structural Plans. Any files that are not named properly and/or uploaded incorrectly may be rejected at intake.