Full Text
Revision Application redmond.gov/BuildingPermits Inspections will proceed Inspections will not proceed REVISION DETAILS Project Contact Phone: Increase in valuation: Increase in square Revision description: Permit Plans Examiner on approved plan TO BE COMPLETED BY INSPECTOR IN FIELD REVISION REQUIRED FOR Building Civil Fire Planning Mechanical Electrical Plumbing 1. Any changes to an issued permit begin in the field with a Building Inspector. Please schedule an “other” inspection through the permit portal (Redmond.gov/REPS) or through the inspection request phone line ([PHONE REDACTED]). 2. During the inspection the Building Inspector will determine if they can approve the revision in the field (no fee), or if a formal revision is required (fee). If a formal revision is required, the Building Inspector must sign the application. 3. Once the application is complete and you have received the inspector’s signature, please submit the Revision Application to [EMAIL REDACTED]. 4. The assigned Plans Examiner will provide you with instructions on how to uploads the revised plans. A complete set of plans shall be a complete set of plans with clouded revisions and any supporting documentation shall be uploaded for review. 5. Revisions submitted for plan review require a Building Revision Fee (minimum two hour plan review) prior to plan review. (Additional fees may apply) APPLICANT INSTRUCTIONS City of Redmond Development Services Center, 15670 NE 85th St, Redmond, WA 98052 [PHONE REDACTED] All plans must be drawn to scale, in landscape, and separate sheets flattened and merged into one file named “Revised_Plans” The Plans Examiner will review your submittal for accuracy, completeness, and determine if other department reviews are required. Plan review time is dependent upon staffing availability and complexity of the scope of work. Revisions will not be issued at the time of application. No refunds will be issued on revisions. Field Field Inspector Published: 03/2024 Page 1 of 1 SIGN