← Back to Redmo, ND

Document Redmond_doc_29b37bfb05

Full Text

CITY OF REDMOND STREETLIGHT REQUIREMENT WORKSHEET This worksheet is to be filled and submitted by the applicant in the 30% Pre Review Entitlement Process (PREP) Formal Process to evaluate the illumination system requirements of the project. Please review the City of Redmond Illumination Design Manual and complete the entire form and return it to the Redmond Engineering Services Division as part of the 30% PREP submittal. 1. Applicant name and address: 2. Property location: a. Property address: b. Development name: c. Assessor’s Parcel Number(s): Street Frontage(s): 3. Roadway Classification: 4. Area Land-Use: Existing Proposed a. Ownership: (COR or PSE) f. Ownership (COR or PSE): b. Light Level (fc): h. Light Level (fc): c. Uniformity (avg/min): i. Uniformity (avg/min): d. Pole Type: j. Pole Type: e. Fixture Type: k. Fixture Type: Signature of Street Lighting Engineer: Date: For Official Use Only: Applicant has submitted a completed worksheet: Initials Date Streetlighting Requirements Met: □ Yes □ No *Note: This worksheet is for Street Lighting Analysis in the ROW and not for on site