Full Text
Development Services Center Reviewed for Code Compliance X Approved with Corrections noted Resubmittal Required Signature: Jay Kelley Approved 02/14/2017 Print one copy of the plans and all applicable materials. Printed copy must be in field prior to inspection. ANY CHANGES TO AN ISSUED PERMIT BEGIN IN THE FIELD WITH A BUILDING INSPECTOR. Call for an inspection ([PHONE REDACTED]) and present your changes to the building inspector in the field. The inspector will determine if they can approve your change in the field (no fee), or if you need to apply for a formal Revision (fee). If the Inspector requires a formal Revision they will provide you with a signed form containing further instructions. Please make an appointment with the assigned Building Plans Examiner ONLY AFTER you have received the signed revision form. The revision is not issued over the counter. SITE COPY BLDG-2016-09802 ---PAGE BREAK--- SITE COPY BLDG-2016-09802 ---PAGE BREAK--- SITE COPY BLDG-2016-09802 ---PAGE BREAK--- SITE COPY BLDG-2016-09802 ---PAGE BREAK--- SITE COPY BLDG-2016-09802 ---PAGE BREAK--- SITE COPY BLDG-2016-09802