Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report Prepared for City of Puyallup June 2015 Prepared by ---PAGE BREAK--- ---PAGE BREAK--- June 2015 │ 214-1895-047 (78) Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report Prepared for City of Puyallup Public Works Engineering Stormwater Management 333 S Meridian Puyallup, WA 98371 Prepared by Parametrix 1019 39th Avenue SE, Suite 100 Puyallup, WA 98374 T. [PHONE REDACTED] F. 1.[PHONE REDACTED] www.parametrix.com ---PAGE BREAK--- CITATION Parametrix. 2015. Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report. Prepared by Parametrix, Puyallup, Washington. June 2015. ---PAGE BREAK--- ---PAGE BREAK--- ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup June 2015 │ 214-1895-047 (78) i TABLE OF CONTENTS 1. INTRODUCTION 1 2. BASIN DESCRIPTION 1 3. SITE DESCRIPTION 2 4. MINIMUM REQUIREMENTS 3 5. ALTERNATIVES CONSIDERED 4 6. DESIGN ANALYSIS 4 7. COST ESTIMATE 6 8. PROPOSED SCHEDULE 8 LIST OF TABLES 1 Land Cover Characteristics by Basin 2 2 Compliance with Minimum Requirements 3 3 Summary of Water Quality Design Flow Rates 4 4 Schedule A – Basins 1, 3, and 4 Project Cost Estimate 6 5 Schedule B – Basin Additive Basin 7 Project Cost Estimate 7 APPENDICES A NRCS Web Soil Survey B Basin Map C Cost Estimate D WWHM Reports E Diversion Structure Calculation Spreadsheets F Plans ---PAGE BREAK--- ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup June 2015 │ 214-1895-047 (78) iii KEY TERMS BMP Best Management Practice cfs cubic feet per second City City of Puyallup Ecology Washington State Department of Ecology GIS geographical information systems GULD General Use Level Designation NRCS National Resources Conservation Service TESC Temporary erosion and sediment control ---PAGE BREAK--- ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup June 2015 │ 214-1895-047 (78) 1 1. INTRODUCTION The City of Puyallup (City) was awarded a grant from the Washington State Department of Ecology (Ecology) for the Fiscal Year 2012 Statewide Stormwater Grant Program. The grant was awarded to the City for the Clarks Creek Targeted Outfall Retrofit Project. The amount of the grant is $551,000 with Local Agency funding of $183,667, for a total project amount of $734,667. The grant funding is to be used to “address water quality of the State of Washington by installing sedimentation and filtration devices at Clarks Creek outfalls, effectively treating and reducing pollutant loading to the TMDL-affected Clarks Creek.” As part of this grant-funded project, the City of Puyallup has already undertaken a project to retrofit five outfalls to Meeker Creek as a part of the Meeker Creek Channel Restoration Project. An Eco-Storm Plus system was selected to treat an approximately 16-acre residential basin prior to discharge to the creek. Meeker Creek discharges to Clarks Creek. The current project will treat up to an additional 52 acres of residential and street land uses primarily north of the 7th Avenue SW trunk line that discharges to Clarks Creek near DeCoursey Park. In all, seven basins tributary to 7th Avenue SW were analyzed for water quality treatment. Of the seven, four were selected for retrofit design. The basins selected maximize the treatment retrofit area and will provide the maximum water quality benefit to Clarks Creek. Ultimately available funding will limit the number of water quality devices installed, and one basin will be bid as an additive, awarded based on available funding. 2. BASIN DESCRIPTION Clarks Creek is located within the lower Puyallup River watershed. Clarks Creek drains approximately 13 square miles with an average flow of 60 cubic feet per second (cfs) (Ecology Publication No. 07-10-110 May 2008). The 7th Avenue SW trunk line basin is approximately 146 acres in size and discharges near DeCoursey Park to Clarks Creek. The basin is flat and is underlain primarily by Puyallup Fine Sandy Loam with Sultan Silt Loam mapped in the eastern third of the basin. A soil map produced by the Web Soil Survey (National Resources Conservation Service [NRCS]) is included in Appendix A. Treatment at the end of pipe immediately prior to discharge is infeasible due to the size of the basin and space available to install a treatment system. Therefore the design team approached the project by segregating sub-basins tributary to the 7th Avenue SW trunk line. Six basins were delineated on the north side of 7th Avenue SW and one basin was delineated on the south side. An exhibit showing the seven basins is included in Appendix B. The basins were delineated based upon the land areas fronting existing enclosed storm sewer systems within existing roads and alleys as depicted in the City’s geographical information systems (GIS). Aerial photography was used to determine the land cover characteristics in each basin and the results are tabulated in Table 1. ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup 2 June 2015 │ 214-1895-047 (78) Table 1. Land Cover Characteristics by Basin (Acres) Total Area Lots Driveways Roofs Yards Road/Sidewalk Basin 1 10.24 30 0.79 1.41 6.28 1.76 Basin 2 5.81 17 0.45 0.80 3.43 1.13 Basin 3 10.72 36 0.95 1.69 6.45 1.63 Basin 4 11.83 38 1.00 1.79 6.80 2.23 Basin 5 4.87 17 0.45 0.80 3.04 0.58 Basin 6 4.35 15 0.40 0.71 2.69 0.56 Basin 7 19.42 57 1.50 2.68 12.39 2.84 Total: 67.24 210 5.54 9.88 41.08 10.73 3. SITE DESCRIPTION The initial project investigation site was comprised of seven basins tributary to the 7th Avenue SW trunk line that discharges to Clarks Creek (see Exhibit in Appendix This wider study area was investigated to determine a range of costs for various treatment alternatives so that a robust analysis could be completed that would result in maximizing the area retrofitted for treatment. The basins all include residential land uses with typically non-pollution-generating roof areas and pollution-generating lawns, driveways and streets/alleys. The project assumptions for each basin were: Delineate basins with existing enclosed storm sewer systems that discharged to the trunk line in 7th Avenue SW to consolidate runoff to a single point for treatment; Assume that an underground vault type treatment Best Management Practice (BMP) will be necessary due to the urbanized condition of the site; Assume space is adequate that the existing enclosed storm sewer system at the point of treatment can be excavated and retrofit with a flow diversion device and off-line water quality treatment system with General Use Level Designation (GULD) for basic water quality treatment; Our analysis of the options for treatment for all seven basins included several GULD-approved systems for basic water quality including Linear Modular Wetlands, Jellyfish, StormFilters and Filterra systems. The estimated construction costs for these systems ranged from $900,000 to well over $1 million dollars, greatly exceeding the available funds for the project. The complete analysis of the alternatives is discussed further in Section 5. Given the funding constraints, the City has elected to focus the available funds on Basins 1, 3, 4, and 7. Further, the improvements for Basin 7 will be bid as a bid additive to allow the City to maximize the use of funds to retrofit areas tributary to 7th Street SW for water quality treatment. ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup June 2015 │ 214-1895-047 (78) 3 4. MINIMUM REQUIREMENTS A summary of the Minimum Requirements for the project according to the 2005 Stormwater Management Manual for Western Washington is provided in Table 2. Table 2. Compliance with Minimum Requirements Minimum Requirement Project Compliance Preparation of Stormwater Site Plans Stormwater Site Plans will be produced by the City of Puyallup concurrently with the preparation of contract plans and specifications for bidding. Construction Stormwater Pollution Prevention Temporary erosion and sediment control (TESC) measures will be provided during construction. TESC plans will be developed and included by the City of Puyallup in the contract plans. Source Control of Pollution This project will provide source control of pollution during construction. The roadway is not classified as a high-use site, therefore continued source control is not required after construction. Preservation of Natural Drainage Systems and Outfalls The project will retrofit existing enclosed storm sewer systems and will not divert runoff from its current course. Onsite Stormwater Management The project will not change the existing land cover. All improvements will be constructed below ground surface and existing land cover will be restored to its previous condition following installation. Runoff Treatment Water quality treatment will be provided by MWS-Linear Modular Wetlands, which are an approved GULD treatment device. Flow Control Flow control is not required because all improvements will be constructed below ground. Restoration of existing paved surfaces for installation of utilities is exempt from flow control. No additional impervious surfaces will be created by the project. Wetlands Protection Drainage patterns are not proposed to be altered. In addition, water quality treatment will be provided to protect the natural environment. Basin/Watershed Planning The project is consistent with and is a direct response to the efforts by Ecology and the City of Puyallup to improve water quality in Clarks Creek. Operation and Maintenance The City of Puyallup will own, operate, and maintain the proposed stormwater management facilities. The Public Works Department will follow the manufacturers’ recommendations for ongoing maintenance for the MWS Linear Modular Wetland systems installed as a part of this project. ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup 4 June 2015 │ 214-1895-047 (78) 5. ALTERNATIVES CONSIDERED During the conceptual stormwater analysis performed for the Project and development of the stormwater management approach, several alternatives were considered. However, the alternatives were determined to not be practicable based on several factors such as availability of right-of-way, technical infeasibility, and anticipated construction cost. The following alternatives were considered but not selected for further analysis or design: Given the urban developed nature of the basins upstream of the outfall, treatment BMPs such as bio-retention and wet ponds were deemed infeasible. The space required for such treatment methods would require significant right-of-way acquisition, which was not included in the scope of the project. There are three underground vault type systems that have GULD approval for basic water quality treatment that the City analyzed and they include MWS-Linear Modular Wetland, StormFilters, and the Filterra System. We prepared construction estimates for each system for all seven basins based on input from the manufacturers. The data estimates are provided in Appendix C. The cost to treat all seven basins exceeded the available funds for the project. Finally, the City settled on the current alternative included in this report, which will treat Basins 1, 3, and 4 and possibly Basin 7 if funds are available with MWS-Linear Modular Wetlands. The MWS-Linear Modular Wetland was determined to be the most effective system for this project because the system can function with as little as 6 inches of hydraulic grade across the system and the TAPE results include GULD for basic, enhanced, and phosphorous removal which will benefit water quality attainment goals for Clarks Creek. The inclusion of a bid additive for Basin 7 is expected to lower overall costs by including that schedule of work in the basis of award thus encouraging bidders to provide an estimate based on the economy of scale for all schedules rather than just the base bid. 6. DESIGN ANALYSIS Water quality will be provided by MWS-Linear Modular Wetland units. These proprietary systems have been sized by the manufacturer Modular Wetland Systems, Inc. Parametrix has contacted the manufacturers and provided the water quality design information included in Table 3 in order to prepare the 90% plans, specifications, and cost estimates included in this report. The 15 Minute Offline Water Quality flow rate from WWHM4 was used to size each of the MWS-Linear Modular Wetlands. Each wetland unit will be preceded by a flow diversion structure to limit the flows to the water quality unit and divert higher flows Calculation spreadsheets supporting the design of these diversion structures is included in Appendix E. Table 3. Summary of Water Quality Design Flow Rates Total Area 15 Min. Offline Water Quality Flow Rate (cfs) Basin 1 10.25 0.34 Basin 3 10.72 0.37 Basin 4 11.83 0.43 Basin 7 19.42 0.60 ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup June 2015 │ 214-1895-047 (78) 5 Basin 1 Basin 1 drains to the storm sewer system in 16th Street SW which then conveys the runoff south to 7th Avenue SW. It is proposed that a MWS-L-8-12-V unit be installed near the intersection of 16th Street SW and 7th Avenue SW as shown on Sheet C1 in the plans enclosed in Appendix F. The MWS-L-8-12-V unit has a treatment capacity of 0.346 CFS which exceeds the calculated treatment flow rate of 0.34 CFS. Basin 3 Basin 3 drains to the storm sewer system in 14th Street SW which then conveys the runoff south to 7th Avenue SW. It is proposed that a MWS-L-8-12-V unit be installed near the intersection of 14th Street SW and 7th Avenue SW as shown on Sheet C2 in the plans enclosed in Appendix F. The MWS-L-8-12-V unit has a treatment capacity of 0.37 CFS which meets the calculated treatment flow rate of 0.37 CFS. Basin 4 Basin 4 drains to the storm sewer system in 9th Street SW which then conveys the runoff south to 7th Avenue SW. It is proposed that a MWS-L-8-16-V-UG unit be installed near the intersection of 9th Street SW and 7th Avenue SW as shown on Sheet C3 in the plans enclosed in Appendix F. The MWS-L-8-16-V-UG unit has a treatment capacity of 0.462 CFS which exceeds the calculated treatment flow rate of 0.43 CFS. Basin 7 Basin 7 drains to the storm sewer system in 11th Street SW which then conveys the runoff south to 7th Avenue SW. It is proposed that a MWS-L-8-24-V unit be installed near the intersection of 11th Street SW and 7th Avenue SW as shown on Sheet C4 in the plans enclosed in Appendix F. The MWS-L-8-24-V unit has a treatment capacity of 0.693 CFS which exceeds the calculated treatment flow rate of 0.60 CFS. ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup 6 June 2015 │ 214-1895-047 (78) 7. COST ESTIMATE Table 4. Schedule A – Basins 1, 3, and 4 Project Cost Estimate Item No. Description of Item Unit Estimated Quantity Unit Price Total A-1. Mobilization (10%) LS 1 $34,228 $34,228 A-2. Project Temporary Traffic Control LS 1 $15,000 $15,000 A-3. Flaggers and Spotters HR 300 $46 $13,800 A-4. Removal of Structures and Obstructions LS 1 $1,500 $1,500 A-5. Removing Asphalt Conc. Pavement SY 141 $7 $987 A-6. Removing Storm Sewer Pipe LF 52 $15 $780 A-7. Removing Curb and Gutter LF 58 $5 290 A-8. Removing Cement Conc.Sidewalk SY 27 $10 270 A-9. Potholing EA 15 $350 $5,250 A-10. Shoring or Extra Excavation Class B LS 1 $5,000 $5,000 A-11. Crushed Surfacing Top Course Ton 50 $40 $2,000 A-12. HMA CL. 1/2 In. PG 64-22 Ton 50 $110 $5,500 A-13. Storm Drain Pipe 8 In. Diam. Incl. Trench and Backfill LF 23 $60 $1,380 A-14. Storm Drain Pipe 12 In. Diam. Incl. Trench and Backfill LF 176 $60 $10,560 A-15. Storm Sewer Manhole 48 In. Diam. EA 2 $2,500 $5,000 A-16. Storm Sewer Manhole 84 In. Diam. EA 2 $12,500 $25,000 A-17. Storm Sewer Manhole 48 In. Diam. w/ Overflow Bypass EA 3 $5,000 $15,000 A-18. Connection to Drainage Structure EA 1 $500 $500 A-19. Reset Service Connection and Water Meter EA 1 $1,500 $1,500 A-20. Removal and Replacement of Unsuitable Material CY 25 $75 $1,875 A-21. Modular Wetland System Complete - Basin 1 LS 1 $70,500 $70,500 A-22. Modular Wetland System Complete - Basin 3 LS 1 $66,500 $66,500 A-23. Modular Wetland System Complete - Basin 4 LS 1 $89,000 $89,000 A-24. Erosion/Water Pollution Control LS 1 $1,500 $1,500 A-25. Roadside Restoration LS 1 $1,500 $1,500 A-26. Cement Conc. Traffic Curb and Gutter LF 58 $15 $870 A-27. Cement Conc. Sidewalk SY 27 $45 $1,215 Subtotal Project Cost: $376,505 Sales Tax $35,391 Contingency $41,189 TOTAL SCHEDULE A: $453,896 ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup June 2015 │ 214-1895-047 (78) 7 Table 5. Schedule B – Basin Additive Basin 7 Project Cost Estimate Item No. Description of Item Unit Estimated Quantity Unit Price Total B-1. Mobilization (10%) LS 1 $599 $599 B-2. Project Temporary Traffic Control LS 1 $1,000 $1,000 B-3. Flaggers and Spotters HR 80 $46 $3,680 B-4. Removal of Structures and Obstructions LS 1 $500 $500 B-5. Removing Asphalt Conc. Pavement SY 43 $7 $301 B-6. Removing Curb and Gutter LF 39 $5 $195 B-7. Removing Cement Conc.Sidewalk SY 45 $7 $315 B-8. Shoring or Extra Excavation Class B LS 1 $750 $750 B-9. Crushed Surfacing Top Course Ton 10 $40 $400 B-10. HMA CL. 1/2 In. PG 64-22 Ton 10 $110 $1,100 B-11. Storm Drain Pipe 8 In. Diam. PVC C900 Incl. Trench and Backfill LF 42 $90 $3,780 B-12. Storm Sewer Pipe 12 In. Diam. Incl. Trench and Backfill LF 59 $60 $3,540 B-13. Storm Sewer Manhole 48 In. Diam. EA 2 $2,500 $5,000 B-14. Storm Sewer Manhole 48 In. Diam. w/ Overflow Bypass EA 1 $5,000 $5,000 B-15. Adjust Manhole EA 0 $1,500 $0 B-16. Reset Service Connection and Water Meter EA 1 $1,500 $1,500 B-17. Removal and Replacement of Unsuitable Material CY 10 $75 $750 B-18. Modular Wetland System Complete - Basin 7 LS 1 $120,000 $120,000 B-19. Erosion/Water Pollution Control LS 1 $500 $500 B-20. Roadside Restoration LS 1 $1,000 $1,000 B-21. Cement Conc. Traffic Curb and Gutter LF 39 $20 $780 B-22. Cement Conc. Sidewalk SY 45 $45 $2,025 Subtotal Project Cost: $152,715 Sales Tax $14,355 Contingency $16,700 TOTAL SCHEDULE B: $183,770 ---PAGE BREAK--- Clarks Creek Targeted Outfall Retrofit Project Stormwater Pre-Design Report City of Puyallup 8 June 2015 │ 214-1895-047 (78) 8. PROPOSED SCHEDULE Based on grant review schedules, design time, and typical construction calendars, the project is expected to progress as outlined below: ---PAGE BREAK--- Appendix A NRCS Web Soil Survey ---PAGE BREAK--- ---PAGE BREAK--- Soil Map—Pierce County Area, Washington (7th Avenue SW Sub-basin) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/12/2014 Page 1 of 3 5225830 5225920 5226010 5226100 5226190 5226280 5225830 5225920 5226010 5226100 5226190 5226280 5226370 551430 551520 551610 551700 551790 551880 551970 552060 552150 552240 551430 551520 551610 551700 551790 551880 551970 552060 552150 552240 47° 11' 19'' N 122° 19' 17'' W 47° 11' 19'' N 122° 18' 37'' W 47° 11' N 122° 19' 17'' W 47° 11' N 122° 18' 37'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 0 150 300 600 900 Feet 0 50 100 200 300 Meters Map Scale: 1:3,850 if printed on A landscape (11" x 8.5") sheet. ---PAGE BREAK--- MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Pierce County Area, Washington Survey Area Data: Version 8, Dec 20, 2013 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 9, 2010—Aug 20, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Pierce County Area, Washington (7th Avenue SW Sub-basin) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/12/2014 Page 2 of 3 ---PAGE BREAK--- Map Unit Legend Pierce County Area, Washington (WA653) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 31A Puyallup fine sandy loam 29.2 67.8% 38A Shalcar muck 0.1 0.3% 42A Sultan silt loam 13.8 32.0% Totals for Area of Interest 43.1 100.0% Soil Map—Pierce County Area, Washington 7th Avenue SW Sub-basin Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/12/2014 Page 3 of 3 ---PAGE BREAK--- ---PAGE BREAK--- Appendix B Basin Map ---PAGE BREAK--- ---PAGE BREAK--- DATE: May 6, 2014 FILE: 0 SCALE IN FEET 300 City of Puyallup Clarks Creek Outfall ---PAGE BREAK--- ---PAGE BREAK--- Appendix C Cost Estimate ---PAGE BREAK--- ---PAGE BREAK--- ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 1 Mobilization LS 1 $46,095.14 $46,095 2 Property Restoration LS 1 $14,000.00 $14,000 3 Project Temporary Traffic Control LS 1 $15,000.00 $15,000 4 Basins 1-7 LS 1 $658,502.00 $658,502 $733,597 $68,958 $200,639 $1,003,194 Basin 1 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 1-1 Filterra 6'x12' 4'x4' EA 1 $83,865.00 $83,865 1-2 Removing Cement Conc. Sidewalk SY 35 $25.00 $875 1-3 Cement Conc. Sidewalk SY 35 $50.00 $1,750 1-4 Removing Cement Conc. Curb and Gutter LF 60 $10.00 $600 1-5 Cement Concrete Traffice Curb and Gutter LF 60 $25.00 $1,500 1-6 Removing Asphalt Conc. Pavement SY 30 $10.00 $300 1-7 HMA CL. 1/2 In. PG 64-22 Ton 4 $100.00 $400 1-8 Storm Sewer Pipe 12 In. Diam. LF 60 $45.00 $2,700 1-9 Catch Basin Type 1 EA 0 $1,250.00 $0 1-10 By-Pass Structure EA 3 $5,000.00 $15,000 Sum $106,990 Basin 2 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 2-1 Filterra 8'x6' EA 1 $47,046.00 $47,046 2-2 Remove Cement Conc. SY 35 $25.00 $875 2-3 Cement Conc. Sidewalk SY 35 $50.00 $1,750 2-4 Removal of Curb and Gutter LF 60 $10.00 $600 2-5 Cement Concrete Traffice Curb and Gutter LF 60 $25.00 $1,500 2-6 Removing Asphalt Conc. Pavement SY 25 $10.00 $250 2-7 HMA CL. 1/2 In. PG 64-22 Ton 6 $100.00 $600 2-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 40 $45.00 $1,800 2-9 Catch Basin Type 1 EA 0 $1,250.00 $0 2-10 By-Pass Structure EA 2 $5,000.00 $10,000 Sum $64,421 Basin 3 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 3-1 Filterra 6'x12' 4'x4' EA 1 $83,865.00 $83,865 3-2 Remove Cement Conc. SY 50 $25.00 $1,250 3-3 Cement Conc. Sidewalk SY 50 $50.00 $2,500 3-4 Removal of Curb and Gutter LF 90 $10.00 $900 3-5 Cement Concrete Traffice Curb and Gutter LF 90 $25.00 $2,250 3-6 Removing Asphalt Conc. Pavement SY 40 $10.00 $400 3-7 HMA CL. 1/2 In. PG 64-22 Ton 5 $100.00 $500 3-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 60 $45.00 $2,700 3-9 Catch Basin Type 1 EA 0 $1,250.00 $0 3-10 By-Pass Structure EA 3 $5,000.00 $15,000 Sum $109,365 Clarks Creeks Outfall Retrofit - Filterra Subtotal Project Cost= Sales Tax Contingency Total Project Cost= ---PAGE BREAK--- Basin 4 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 4-1 Filterra 6'x12' 6'x8' EA 1 $93,240.00 $93,240 4-2 Remove Cement Conc. SY 55 $25.00 $1,375 4-3 Cement Conc. Sidewalk SY 55 $50.00 $2,750 4-4 Removal of Curb and Gutter LF 95 $10.00 $950 4-5 Cement Concrete Traffice Curb and Gutter LF 95 $25.00 $2,375 4-6 Removing Asphalt Conc. Pavement SY 45 $10.00 $450 4-7 HMA CL. 1/2 In. PG 64-22 Ton 5 $100.00 $500 4-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 60 $45.00 $2,700 4-9 Catch Basin Type 1 EA 0 $1,250.00 $0 4-10 By-Pass Structure EA 3 $5,000.00 $15,000 Sum $119,340 Basin 5 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 5-1 Filterra 6'x6' EA 1 $35,454.00 $35,454 5-2 Remove Cement Conc. SY 30 $25.00 $750 5-3 Cement Conc. Sidewalk SY 30 $50.00 $1,500 5-4 Removal of Curb and Gutter LF 55 $10.00 $550 5-5 Cement Concrete Traffice Curb and Gutter LF 55 $25.00 $1,375 5-6 Removing Asphalt Conc. Pavement SY 25 $10.00 $250 5-7 HMA CL. 1/2 In. PG 64-22 Ton 3 $100.00 $300 5-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 40 $45.00 $1,800 5-9 Catch Basin Type 1 EA 0 $1,250.00 $0 5-10 By-Pass Structure EA 2 $5,000.00 $10,000 Sum $51,979 Basin 6 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 6-1 Filterra 12'x6' EA 1 $34,858.50 $34,859 6-2 Remove Cement Conc. SY 20 $25.00 $500 6-3 Cement Conc. Sidewalk SY 20 $50.00 $1,000 6-4 Removal of Curb and Gutter LF 35 $10.00 $350 6-5 Cement Concrete Traffice Curb and Gutter LF 35 $25.00 $875 6-6 Removing Asphalt Conc. Pavement SY 15 $10.00 $150 6-7 HMA CL. 1/2 In. PG 64-22 Ton 2 $100.00 $200 6-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 20 $45.00 $900 6-9 Catch Basin Type 1 EA 0 $1,250.00 $0 6-10 By-Pass Structure EA 1 $5,000.00 $5,000 Sum $43,834 Basin 7 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 7-1 Filterra 6'x8' 12'X6' EA 1 $128,098.50 $128,099 7-2 Remove Cement Conc. SY 70 $25.00 $1,750 7-3 Cement Conc. Sidewalk SY 70 $50.00 $3,500 7-4 Removal of Curb and Gutter LF 125 $10.00 $1,250 7-5 Cement Concrete Traffice Curb and Gutter LF 125 $25.00 $3,125 7-6 Removing Asphalt Conc. Pavement SY 60 $10.00 $600 7-7 HMA CL. 1/2 In. PG 64-22 Ton 7 $100.00 $650 7-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 80 $45.00 $3,600 7-9 Catch Basin Type 1 EA 0 $1,250.00 $0 7-10 By-Pass Structure EA 4 $5,000.00 $20,000 Sum $162,574 ---PAGE BREAK--- ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 1 Mobilization LS 1 $42,023 $42,023 2 Property Restoration LS 1 $21,000 $21,000 3 Project Temporary Traffic Control LS 1 $15,000 $15,000 4 Basins 1-7 LS 1 $600,325 $600,325 $678,348 $63,765 $185,528 $927,641 Basin 1 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 1-1 Linear Modular Wetland 8'x12' EA 1 $66,000 $66,000 1-2 Removing Cement Conc. Sidewalk SY 30 $25 $750 1-3 Cement Conc. Sidewalk SY 30 $50 $1,500 1-4 Removing Cement Conc. Curb and Gutter LF 50 $10 $500 1-5 Cement Concrete Traffice Curb and Gutter LF 50 $25 $1,250 1-6 Removing Asphalt Conc. Pavement SY 25 $10 $250 1-7 HMA CL. 1/2 In. PG 64-22 Ton 3 $100 $300 1-8 Storm Sewer Pipe 12 In. Diam. LF 80 $45 $3,600 1-9 Catch Basin Type 1 EA 1 $1,250 $1,250 1-10 By-Pass Structure EA 1 $10,000 $10,000 Sum $85,400 Basin 2 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 2-1 Linear Modular Wetland 4'x17' EA 1 $39,750 $39,750 2-2 Remove Cement Conc. SY 30 $25 $750 2-3 Cement Conc. Sidewalk SY 30 $50 $1,500 2-4 Removal of Curb and Gutter LF 50 $10 $500 2-5 Cement Concrete Traffice Curb and Gutter LF 50 $25 $1,250 2-6 Removing Asphalt Conc. Pavement SY 25 $10 $250 2-7 HMA CL. 1/2 In. PG 64-22 Ton 3 $100 $300 2-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 80 $45 $3,600 2-9 Catch Basin Type 1 EA 1 $1,250 $1,250 2-10 By-Pass Structure EA 1 $10,000 $10,000 Sum $59,150 Basin 3 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 3-1 Linear Modular Wetland 8'x12' EA 1 $66,000 $66,000 3-2 Remove Cement Conc. SY 30 $25 $750 3-3 Cement Conc. Sidewalk SY 30 $50 $1,500 3-4 Removal of Curb and Gutter LF 50 $10 $500 3-5 Cement Concrete Traffice Curb and Gutter LF 50 $25 $1,250 3-6 Removing Asphalt Conc. Pavement SY 25 $10 $250 3-7 HMA CL. 1/2 In. PG 64-22 Ton 3 $100 $300 3-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 80 $45 $3,600 3-9 Catch Basin Type 1 EA 1 $1,250 $1,250 3-10 By-Pass Structure EA 1 $10,000 $10,000 Sum $85,400 Subtotal Project Cost= Sales Tax Contingency Total Project Cost= Clarks Creeks Outfall Retrofit - MWS-Linear Modular Wetlands ---PAGE BREAK--- Basin 4 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 4-1 Linear Modular Wetland 8'x16' EA 1 $75,000 $75,000 4-2 Remove Cement Conc. SY 30 $25 $750 4-3 Cement Conc. Sidewalk SY 30 $50 $1,500 4-4 Removal of Curb and Gutter LF 50 $10 $500 4-5 Cement Concrete Traffice Curb and Gutter LF 50 $25 $1,250 4-6 Removing Asphalt Conc. Pavement SY 25 $10 $250 4-7 HMA CL. 1/2 In. PG 64-22 Ton 3 $100 $300 4-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 80 $45 $3,600 4-9 Catch Basin Type 1 EA 1 $1,250 $1,250 4-10 By-Pass Structure EA 1 $10,000 $10,000 Sum $94,400 Basin 5 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 5-1 Linear Modular Wetland 4'x15' EA 1 $35,550 $35,550 5-2 Remove Cement Conc. SY 30 $25 $750 5-3 Cement Conc. Sidewalk SY 30 $50 $1,500 5-4 Removal of Curb and Gutter LF 50 $10 $500 5-5 Cement Concrete Traffice Curb and Gutter LF 50 $25 $1,250 5-6 Removing Asphalt Conc. Pavement SY 25 $10 $250 5-7 HMA CL. 1/2 In. PG 64-22 Ton 3 $100 $300 5-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 80 $45 $3,600 5-9 Catch Basin Type 1 EA 1 $1,250 $1,250 5-10 By-Pass Structure EA 1 $10,000 $10,000 Sum $54,950 Basin 6 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 6-1 Linear Modular Wetland 4'x13' EA 1 $30,825 $30,825 6-2 Remove Cement Conc. SY 30 $25 $750 6-3 Cement Conc. Sidewalk SY 30 $50 $1,500 6-4 Removal of Curb and Gutter LF 50 $10 $500 6-5 Cement Concrete Traffice Curb and Gutter LF 50 $25 $1,250 6-6 Removing Asphalt Conc. Pavement SY 25 $10 $250 6-7 HMA CL. 1/2 In. PG 64-22 Ton 3 $100 $300 6-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 80 $45 $3,600 6-9 Catch Basin Type 1 EA 1 $1,250 $1,250 6-10 By-Pass Structure EA 1 $10,000 $10,000 Sum $50,225 Basin 7 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 7-1 Linear Modular Wetland 8'x12' EA 2 $66,000 $132,000 7-2 Remove Cement Conc. SY 60 $25 $1,500 7-3 Cement Conc. Sidewalk SY 60 $50 $3,000 7-4 Removal of Curb and Gutter LF 100 $10 $1,000 7-5 Cement Concrete Traffice Curb and Gutter LF 100 $25 $2,500 7-6 Removing Asphalt Conc. Pavement SY 50 $10 $500 7-7 HMA CL. 1/2 In. PG 64-22 Ton 6 $100 $600 7-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 160 $45 $7,200 7-9 Catch Basin Type 1 EA 2 $1,250 $2,500 7-10 By-Pass Structure EA 2 $10,000 $20,000 Sum $170,800 ---PAGE BREAK--- ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 1 Mobilization LS 1 47,598.25 $ 47,598 $ 2 Property Restoration LS 1 14,000.00 $ 14,000 $ 3 Project Temporary Traffic Control LS 1 15,000.00 $ 15,000 $ 4 Basins 1-7 LS 1 679,975.00 $ 679,975 $ 756,573 $ 71,118 $ 206,923 $ 1,034,614 $ Basin 1 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 1-1 8x14 Vault EA 1 $101,955 $101,955 1-4 Removing Cement Conc. Curb and Gutter LF 24 $10 $240 1-5 Cement Concrete Traffice Curb and Gutter LF 24 $25 $600 1-6 Removing Asphalt Conc. Pavement SY 48 $10 $480 1-7 HMA CL. 1/2 In. PG 64-22 Ton 6 $100 $600 1-8 Storm Sewer Pipe 12 In. Diam. LF 20 $45 $900 Sum $104,775.00 Basin 2 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 2-1 8x11 Vault EA 1 $75,210 $75,210 2-4 Removal of Curb and Gutter LF 21 $10 $210 2-5 Cement Concrete Traffice Curb and Gutter LF 21 $25 $525 2-6 Removing Asphalt Conc. Pavement SY 42 $10 $420 2-7 HMA CL. 1/2 In. PG 64-22 Ton 5 $100 $500 2-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 20 $45 $900 Sum $77,765.00 Basin 3 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 3-1 8x14 Vault EA 1 $105,975 $105,975 3-4 Removal of Curb and Gutter LF 24 $10 $240 3-5 Cement Concrete Traffice Curb and Gutter LF 24 $25 $600 3-6 Removing Asphalt Conc. Pavement SY 48 $10 $480 3-7 HMA CL. 1/2 In. PG 64-22 Ton 6 $100 $600 3-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 20 $45 $900 Sum $108,795.00 Clarks Creeks Outfall Retrofit - StormFilters Subtotal Project Cost= Sales Tax Contingency Total Project Cost= ---PAGE BREAK--- Basin 4 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 4-1 8x16 Vault EA 1 $120,795 $120,795 4-4 Removal of Curb and Gutter LF 26 $10 $260 4-5 Cement Concrete Traffice Curb and Gutter LF 26 $25 $650 4-6 Removing Asphalt Conc. Pavement SY 52 $10 $520 4-7 HMA CL. 1/2 In. PG 64-22 Ton 6.5 $100 $650 4-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 20 $45 $900 Sum $123,775.00 Basin 5 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 5-1 8x11 Vault EA 1 $65,115 $65,115 5-4 Removal of Curb and Gutter LF 21 $10 $210 5-5 Cement Concrete Traffice Curb and Gutter LF 21 $25 $525 5-6 Removing Asphalt Conc. Pavement SY 42 $10 $420 5-7 HMA CL. 1/2 In. PG 64-22 Ton 5 $100 $500 4-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 20 $45 $900 Sum $66,770.00 Basin 6 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 6-1 96" MH EA 1 $59,925 $59,925 6-4 Removal of Curb and Gutter LF 16 $10 $160 6-5 Cement Concrete Traffice Curb and Gutter LF 16 $25 $400 6-6 Removing Asphalt Conc. Pavement SY 25 $10 $250 6-7 HMA CL. 1/2 In. PG 64-22 Ton 3 $100 $300 6-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 20 $45 $900 Sum $61,935.00 Basin 7 ITEM NO. DESCRIPTION OF ITEM UNIT Est Quant. UNIT PRICE TOTAL 7-1 8x22 Vault EA 1 $132,750 $132,750 7-4 Removal of Curb and Gutter LF 32 $10 $320 7-5 Cement Concrete Traffice Curb and Gutter LF 32 $25 $800 7-6 Removing Asphalt Conc. Pavement SY 64 $10 $640 7-7 HMA CL. 1/2 In. PG 64-22 Ton 7.5 $100 $750 7-8 Storm Sewer Pipe 12-in. Diam. Incl. Trench LF 20 $45 $900 Sum $136,160.00 ---PAGE BREAK--- Appendix D WWHM Reports ---PAGE BREAK--- ---PAGE BREAK--- WWHM4 PROJECT REPORT Project Name: CCBasin1 Site Name: Site Address: City : Report Date: 6/11/2014 Gage : McMillin Data Start : 1948/10/01 Data End : 1996/09/30 Precip Scale: 1.00 Version : 2013/06/26 Low Flow Threshold for POC 1 : 50 Percent of the 2 Year High Flow Threshold for POC 1: 50 year PREDEVELOPED LAND USE MITIGATED LAND USE Name : CC Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 6.28 Pervious Total 6.28 Impervious Land Use Acres ROADS FLAT 1.76 ROOF TOPS FLAT 1.41 DRIVEWAYS FLAT 0.79 Impervious Total 3.96 Basin Total 10.24 Element Flows To: Surface Interflow Groundwater ANALYSIS RESULTS ---PAGE BREAK--- Predeveloped Landuse Totals for POC #1 Total Pervious Area:0 Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Pervious Area:6.28 Total Impervious Area:3.96 Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0.6165 acre-feet On-line facility target flow: 0.5723 cfs. Adjusted for 15 min: 0.6011 cfs. Off-line facility target flow: 0.3235 cfs. Adjusted for 15 min: 0.3397 cfs. Perlnd and Changes No changes have been made. This program and accompanying documentation are provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2013; All Rights Reserved. ---PAGE BREAK--- WWHM4 PROJECT REPORT Project Name: CCBasin2 Site Name: Clarks Creek Site Address: City : Puyallup Report Date: 6/11/2014 Gage : McMillin Data Start : 1948/10/01 Data End : 1996/09/30 Precip Scale: 1.00 Version : 2013/06/26 Low Flow Threshold for POC 1 : 50 Percent of the 2 Year High Flow Threshold for POC 1: 50 year PREDEVELOPED LAND USE MITIGATED LAND USE Name : CC Basin 2 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 3.43 Pervious Total 3.43 Impervious Land Use Acres ROADS FLAT 1.13 ROOF TOPS FLAT 0.8 DRIVEWAYS FLAT 0.45 Impervious Total 2.38 Basin Total 5.81 Element Flows To: Surface Interflow Groundwater ANALYSIS RESULTS ---PAGE BREAK--- Predeveloped Landuse Totals for POC #1 Total Pervious Area:0 Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Pervious Area:3.43 Total Impervious Area:2.38 Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0.3591 acre-feet On-line facility target flow: 0.3411 cfs. Adjusted for 15 min: 0.3593 cfs. Off-line facility target flow: 0.193 cfs. Adjusted for 15 min: 0.2033 cfs. Perlnd and Changes No changes have been made. This program and accompanying documentation are provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2013; All Rights Reserved. ---PAGE BREAK--- WWHM4 PROJECT REPORT Project Name: CCBasin3 Site Name: Site Address: City : Report Date: 6/11/2014 Gage : McMillin Data Start : 1948/10/01 Data End : 1996/09/30 Precip Scale: 1.00 Version : 2013/06/26 Low Flow Threshold for POC 1 : 50 Percent of the 2 Year High Flow Threshold for POC 1: 50 year PREDEVELOPED LAND USE MITIGATED LAND USE Name : CC Basin 3 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 6.45 Pervious Total 6.45 Impervious Land Use Acres ROADS FLAT 1.63 ROOF TOPS FLAT 1.69 DRIVEWAYS FLAT 0.95 Impervious Total 4.27 Basin Total 10.72 Element Flows To: Surface Interflow Groundwater ANALYSIS RESULTS ---PAGE BREAK--- Predeveloped Landuse Totals for POC #1 Total Pervious Area:0 Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Pervious Area:6.45 Total Impervious Area:4.27 Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0.6546 acre-feet On-line facility target flow: 0.6138 cfs. Adjusted for 15 min: 0.6456 cfs. Off-line facility target flow: 0.3475 cfs. Adjusted for 15 min: 0.3655 cfs. Perlnd and Changes No changes have been made. This program and accompanying documentation are provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2013; All Rights Reserved. ---PAGE BREAK--- WWHM4 PROJECT REPORT Project Name: CCBasin4 Site Name: Site Address: City : Report Date: 6/11/2014 Gage : McMillin Data Start : 1948/10/01 Data End : 1996/09/30 Precip Scale: 1.00 Version : 2013/06/26 Low Flow Threshold for POC 1 : 50 Percent of the 2 Year High Flow Threshold for POC 1: 50 year PREDEVELOPED LAND USE MITIGATED LAND USE Name : CC Basin 4 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 6.8 Pervious Total 6.8 Impervious Land Use Acres ROADS FLAT 2.23 ROOF TOPS FLAT 1.79 DRIVEWAYS FLAT 1.01 Impervious Total 5.03 Basin Total 11.83 Element Flows To: Surface Interflow Groundwater ANALYSIS RESULTS ---PAGE BREAK--- Predeveloped Landuse Totals for POC #1 Total Pervious Area:0 Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Pervious Area:6.8 Total Impervious Area:5.03 Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0.7441 acre-feet On-line facility target flow: 0.7161 cfs. Adjusted for 15 min: 0.7557 cfs. Off-line facility target flow: 0.4064 cfs. Adjusted for 15 min: 0.4289 cfs. Perlnd and Changes No changes have been made. This program and accompanying documentation are provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2013; All Rights Reserved. ---PAGE BREAK--- WWHM4 PROJECT REPORT Project Name: CCBasin5 Site Name: Site Address: City : Report Date: 6/11/2014 Gage : McMillin Data Start : 1948/10/01 Data End : 1996/09/30 Precip Scale: 1.00 Version : 2013/06/26 Low Flow Threshold for POC 1 : 50 Percent of the 2 Year High Flow Threshold for POC 1: 50 year PREDEVELOPED LAND USE MITIGATED LAND USE Name : CC Basin 5 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 3.04 Pervious Total 3.04 Impervious Land Use Acres ROADS FLAT 0.58 ROOF TOPS FLAT 0.8 DRIVEWAYS FLAT 0.45 Impervious Total 1.83 Basin Total 4.87 Element Flows To: Surface Interflow Groundwater ANALYSIS RESULTS ---PAGE BREAK--- Predeveloped Landuse Totals for POC #1 Total Pervious Area:0 Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Pervious Area:3.04 Total Impervious Area:1.83 Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0.2901 acre-feet On-line facility target flow: 0.2655 cfs. Adjusted for 15 min: 0.2785 cfs. Off-line facility target flow: 0.15 cfs. Adjusted for 15 min: 0.1574 cfs. Perlnd and Changes No changes have been made. This program and accompanying documentation are provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2013; All Rights Reserved. ---PAGE BREAK--- WWHM4 PROJECT REPORT Project Name: CCBasin6 Site Name: Site Address: City : Report Date: 6/11/2014 Gage : McMillin Data Start : 1948/10/01 Data End : 1996/09/30 Precip Scale: 1.00 Version : 2013/06/26 Low Flow Threshold for POC 1 : 50 Percent of the 2 Year High Flow Threshold for POC 1: 50 year PREDEVELOPED LAND USE MITIGATED LAND USE Name : CC Basin 6 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 2.69 Pervious Total 2.69 Impervious Land Use Acres ROADS FLAT 0.56 ROOF TOPS FLAT 0.7 DRIVEWAYS FLAT 0.4 Impervious Total 1.66 Basin Total 4.35 Element Flows To: Surface Interflow Groundwater ANALYSIS RESULTS ---PAGE BREAK--- Predeveloped Landuse Totals for POC #1 Total Pervious Area:0 Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Pervious Area:2.69 Total Impervious Area:1.66 Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0.261 acre-feet On-line facility target flow: 0.2402 cfs. Adjusted for 15 min: 0.2522 cfs. Off-line facility target flow: 0.1358 cfs. Adjusted for 15 min: 0.1425 cfs. Perlnd and Changes No changes have been made. This program and accompanying documentation are provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2013; All Rights Reserved. ---PAGE BREAK--- WWHM4 PROJECT REPORT Project Name: CCBasin7 Site Name: Site Address: City : Report Date: 6/11/2014 Gage : McMillin Data Start : 1948/10/01 Data End : 1996/09/30 Precip Scale: 1.00 Version : 2013/06/26 Low Flow Threshold for POC 1 : 50 Percent of the 2 Year High Flow Threshold for POC 1: 50 year PREDEVELOPED LAND USE MITIGATED LAND USE Name : CC Basin 7 Bypass: No GroundWater: No Pervious Land Use Acres C, Lawn, Flat 12.39 Pervious Total 12.39 Impervious Land Use Acres ROADS FLAT 2.84 ROOF TOPS FLAT 2.68 DRIVEWAYS FLAT 1.5 Impervious Total 7.02 Basin Total 19.41 Element Flows To: Surface Interflow Groundwater ANALYSIS RESULTS ---PAGE BREAK--- Predeveloped Landuse Totals for POC #1 Total Pervious Area:0 Total Impervious Area:0 Mitigated Landuse Totals for POC #1 Total Pervious Area:12.39 Total Impervious Area:7.02 Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0 5 year 0 10 year 0 25 year 0 50 year 0 100 year 0 Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated POC #1 The Facility PASSED The Facility PASSED. Flow(cfs) Predev Mit Percentage Pass/Fail 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass ---PAGE BREAK--- 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass 0.0000 0 0 0 Pass Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 1.135 acre-feet On-line facility target flow: 1.0228 cfs. Adjusted for 15 min: 1.0709 cfs. Off-line facility target flow: 0.5791 cfs. Adjusted for 15 min: 0.6064 cfs. Perlnd and Changes No changes have been made. This program and accompanying documentation are provided 'as-is' without warranty of any kind. The entire risk regarding the performance and results of this program is assumed by End User. Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed or implied, including but not limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without limitation to damages for loss of business profits, loss of business information, business interruption, and the like) arising out of the use of, or inability to use this program even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2013; All Rights Reserved. ---PAGE BREAK--- Appendix E Diversion Structure Calculation Spreadsheets ---PAGE BREAK--- ---PAGE BREAK--- Basin 1 Rim Elevation Note: for Contech, Top of Weir-IE=2.17 min. 33.38 Q to mws 0.3397 from WWMH Orifice Diam. (in) IE Hmax (ft) Qmax (cfs) Q100 4.2 from WWMH 3.00 27.61 5.8 0.587 to MWS Weir Max WSE Top of Weir Max H (ft) P (ft) C L (ft) Qmax (cfs) 31.88 29.78 2.1 2.17 3.66 4.00 44.517 H = hydraulic head Stage Hor Qor Hweir C Qweir Qout Clarks Creek Outfall 27.61 0.00 0.000 0.00 3.27 0.000 0.000 Basin 1 27.70 0.09 0.073 0.00 3.27 0.000 0.073 27.80 0.19 0.106 0.00 3.27 0.000 0.106 27.90 0.29 0.132 0.00 3.27 0.000 0.132 28.00 0.39 0.153 0.00 3.27 0.000 0.153 28.10 0.49 0.171 0.00 3.27 0.000 0.171 28.20 0.59 0.188 0.00 3.27 0.000 0.188 28.30 0.69 0.203 0.00 3.27 0.000 0.203 28.40 0.79 0.217 0.00 3.27 0.000 0.217 28.50 0.89 0.230 0.00 3.27 0.000 0.230 28.60 0.99 0.243 0.00 3.27 0.000 0.243 28.70 1.09 0.255 0.00 3.27 0.000 0.255 28.80 1.19 0.266 0.00 3.27 0.000 0.266 28.90 1.29 0.277 0.00 3.27 0.000 0.277 29.00 1.39 0.288 0.00 3.27 0.000 0.288 29.10 1.49 0.298 0.00 3.27 0.000 0.298 29.20 1.59 0.308 0.00 3.27 0.000 0.308 29.30 1.69 0.318 0.00 3.27 0.000 0.318 29.40 1.79 0.327 0.00 3.27 0.000 0.327 29.50 1.89 0.336 0.00 3.27 0.000 0.336 29.60 1.99 0.345 0.00 3.27 0.000 0.345 29.70 2.09 0.353 0.00 3.27 0.000 0.353 WQ event (Qweir=0, Qout>Qmws) 29.80 2.19 0.361 0.02 3.27 0.037 0.398 29.90 2.29 0.370 0.12 3.29 0.547 0.917 30.00 2.39 0.378 0.22 3.31 1.366 1.744 30.10 2.49 0.385 0.32 3.33 2.410 2.796 30.20 2.59 0.393 0.42 3.35 3.645 4.038 30.30 2.69 0.401 0.52 3.37 5.048 5.449 30.40 2.79 0.408 0.62 3.38 6.609 7.017 30.50 2.89 0.415 0.72 3.40 8.315 8.731 30.60 2.99 0.422 0.82 3.42 10.161 10.584 30.70 3.09 0.429 0.92 3.44 12.141 12.570 30.80 3.19 0.436 1.02 3.46 14.249 14.685 30.90 3.29 0.443 1.12 3.48 16.483 16.926 31.00 3.39 0.450 1.22 3.49 18.838 19.288 31.10 3.49 0.456 1.32 3.51 21.313 21.769 31.20 3.59 0.463 1.42 3.53 23.905 24.367 31.30 3.69 0.469 1.52 3.55 26.612 27.081 31.40 3.79 0.475 1.62 3.57 29.433 29.908 31.50 3.89 0.482 1.72 3.59 32.366 32.848 31.60 3.99 0.488 1.82 3.61 35.410 35.898 31.70 4.09 0.494 1.92 3.62 38.565 39.059 31.80 4.19 0.500 2.02 3.64 41.828 42.328 100-year event (Max WSE, Qout>Q100) ---PAGE BREAK--- Basin 3 Rim Elevation Note: for Contech, Top of Weir-IE=2.17 min. 34.23 Q to mws 0.3655 from WWMH Orifice Diam. (in) IE Hmax (ft) Qmax (cfs) Q100 4.46 from WWMH 3.10 30.00 4.2 0.536 to MWS Weir Max WSE Top of Weir Max H (ft) P (ft) C L (ft) Qmax (cfs) 32.73 32.17 0.6 2.17 3.37 4.00 5.654 H = hydraulic head Stage Hor Qor Hweir C Qweir Qout 30.00 0.00 0.000 0.00 3.27 0.000 0.000 Clarks Creek Outfall 30.10 0.10 0.082 0.00 3.27 0.000 0.082 Basin 3 30.20 0.20 0.117 0.00 3.27 0.000 0.117 30.30 0.30 0.143 0.00 3.27 0.000 0.143 30.40 0.40 0.165 0.00 3.27 0.000 0.165 30.50 0.50 0.184 0.00 3.27 0.000 0.184 30.60 0.60 0.202 0.00 3.27 0.000 0.202 30.70 0.70 0.218 0.00 3.27 0.000 0.218 30.80 0.80 0.233 0.00 3.27 0.000 0.233 30.90 0.90 0.247 0.00 3.27 0.000 0.247 31.00 1.00 0.261 0.00 3.27 0.000 0.261 31.10 1.10 0.274 0.00 3.27 0.000 0.274 31.20 1.20 0.286 0.00 3.27 0.000 0.286 31.30 1.30 0.297 0.00 3.27 0.000 0.297 31.40 1.40 0.309 0.00 3.27 0.000 0.309 31.50 1.50 0.319 0.00 3.27 0.000 0.319 31.60 1.60 0.330 0.00 3.27 0.000 0.330 31.70 1.70 0.340 0.00 3.27 0.000 0.340 31.80 1.80 0.350 0.00 3.27 0.000 0.350 31.90 1.90 0.359 0.00 3.27 0.000 0.359 32.00 2.00 0.369 0.00 3.27 0.000 0.369 32.10 2.10 0.378 0.00 3.27 0.000 0.378 WQ event 32.20 2.20 0.387 0.03 3.28 0.068 0.455 32.30 2.30 0.396 0.13 3.29 0.618 1.013 32.40 2.40 0.404 0.23 3.31 1.461 1.865 32.50 2.50 0.412 0.33 3.33 2.526 2.938 32.60 2.60 0.421 0.43 3.35 3.778 4.198 32.70 2.70 0.429 0.53 3.37 5.198 5.626 100-year event ---PAGE BREAK--- Basin 4 Rim Elevation Note: for Contech, Top of Weir-IE=2.17 min. 36.49 Q to mws 0.4289 from WWMH Orifice Diam. (in) IE Hmax (ft) Qmax (cfs) Q100 5.05 from WWMH 3.30 31.27 5.2 0.675 to MWS Weir Max WSE Top of Weir Max H (ft) P (ft) C L (ft) Qmax (cfs) 34.99 33.44 1.6 2.17 3.56 4.00 27.446 H = hydraulic head Stage Hor Qor Hweir C Qweir Qout 31.27 0.00 0.000 0.00 3.27 0.000 0.000 Clarks Creek Outfall 31.30 0.03 0.051 0.00 3.27 0.000 0.051 Basin 4 31.40 0.13 0.107 0.00 3.27 0.000 0.107 31.50 0.23 0.142 0.00 3.27 0.000 0.142 31.60 0.33 0.170 0.00 3.27 0.000 0.170 31.70 0.43 0.194 0.00 3.27 0.000 0.194 31.80 0.53 0.215 0.00 3.27 0.000 0.215 31.90 0.63 0.235 0.00 3.27 0.000 0.235 32.00 0.73 0.252 0.00 3.27 0.000 0.252 32.10 0.83 0.269 0.00 3.27 0.000 0.269 32.20 0.93 0.285 0.00 3.27 0.000 0.285 32.30 1.03 0.300 0.00 3.27 0.000 0.300 32.40 1.13 0.314 0.00 3.27 0.000 0.314 32.50 1.23 0.328 0.00 3.27 0.000 0.328 32.60 1.33 0.341 0.00 3.27 0.000 0.341 32.70 1.43 0.353 0.00 3.27 0.000 0.353 32.80 1.53 0.366 0.00 3.27 0.000 0.366 32.90 1.63 0.377 0.00 3.27 0.000 0.377 33.00 1.73 0.389 0.00 3.27 0.000 0.389 33.10 1.83 0.400 0.00 3.27 0.000 0.400 33.20 1.93 0.411 0.00 3.27 0.000 0.411 33.30 2.03 0.421 0.00 3.27 0.000 0.421 33.40 2.13 0.431 0.00 3.27 0.000 0.431 WQ event 33.50 2.23 0.441 0.06 3.28 0.193 0.634 33.60 2.33 0.451 0.16 3.30 0.845 1.296 33.70 2.43 0.461 0.26 3.32 1.759 2.220 33.80 2.53 0.470 0.36 3.34 2.883 3.353 33.90 2.63 0.479 0.46 3.35 4.187 4.666 34.00 2.73 0.488 0.56 3.37 5.654 6.143 34.10 2.83 0.497 0.66 3.39 7.274 7.771 34.20 2.93 0.506 0.76 3.41 9.037 9.543 34.30 3.03 0.514 0.86 3.43 10.937 11.452 34.40 3.13 0.523 0.96 3.45 12.969 13.492 34.50 3.23 0.531 1.06 3.47 15.128 15.659 34.60 3.33 0.539 1.16 3.48 17.410 17.949 34.70 3.43 0.547 1.26 3.50 19.814 20.361 34.80 3.53 0.555 1.36 3.52 22.336 22.891 34.90 3.63 0.563 1.46 3.54 24.974 25.537 35.00 3.73 0.571 1.56 3.56 27.727 28.297 100-year event ---PAGE BREAK--- Basin 7 Rim Elevation Note: for Contech, Top of Weir-IE=2.17 min. 33.88 Q to mws 0.6064 from WWMH Orifice Diam. (in) IE Hmax (ft) Qmax (cfs) Q100 7.77 from WWMH 4.00 29.55 4.3 0.903 to MWS Weir Max WSE Top of Weir Max H (ft) P (ft) C L (ft) Qmax (cfs) 32.38 31.72 0.7 2.17 3.39 4.00 7.274 H = hydraulic head Stage Hor Qor Hweir C Qweir Qout 29.60 0.05 0.097 0.00 3.27 0.000 0.097 Clarks Creek Outfall 29.70 0.15 0.168 0.00 3.27 0.000 0.168 Basin 7 29.80 0.25 0.217 0.00 3.27 0.000 0.217 29.90 0.35 0.257 0.00 3.27 0.000 0.257 30.00 0.45 0.291 0.00 3.27 0.000 0.291 30.10 0.55 0.322 0.00 3.27 0.000 0.322 30.20 0.65 0.350 0.00 3.27 0.000 0.350 30.30 0.75 0.376 0.00 3.27 0.000 0.376 30.40 0.85 0.400 0.00 3.27 0.000 0.400 30.50 0.95 0.423 0.00 3.27 0.000 0.423 30.60 1.05 0.445 0.00 3.27 0.000 0.445 30.70 1.15 0.466 0.00 3.27 0.000 0.466 30.80 1.25 0.485 0.00 3.27 0.000 0.485 30.90 1.35 0.504 0.00 3.27 0.000 0.504 31.00 1.45 0.523 0.00 3.27 0.000 0.523 31.10 1.55 0.541 0.00 3.27 0.000 0.541 31.20 1.65 0.558 0.00 3.27 0.000 0.558 31.30 1.75 0.574 0.00 3.27 0.000 0.574 31.40 1.85 0.591 0.00 3.27 0.000 0.591 31.50 1.95 0.606 0.00 3.27 0.000 0.606 31.60 2.05 0.622 0.00 3.27 0.000 0.622 31.70 2.15 0.637 0.00 3.27 0.000 0.637 WQ event 31.80 2.25 0.651 0.08 3.28 0.297 0.949 31.90 2.35 0.666 0.18 3.30 1.009 1.675 32.00 2.45 0.680 0.28 3.32 1.969 2.648 32.10 2.55 0.693 0.38 3.34 3.130 3.823 32.20 2.65 0.707 0.48 3.36 4.467 5.174 32.30 2.75 0.720 0.58 3.38 5.967 6.687 32.40 2.85 0.733 0.68 3.40 7.616 8.349 100-year event ---PAGE BREAK--- Appendix F Plans ---PAGE BREAK--- ---PAGE BREAK--- OF 90% REVIEW SUBMITTAL CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WA 8 PRELIMINARY 1 G1 COVER SHEET CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WASHINGTON PUYALLUP PROJECT LOCATION BASIN 1 BASIN 3 BASIN 7 BASIN 4 ---PAGE BREAK--- OF 90% REVIEW SUBMITTAL CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WA 8 PRELIMINARY 2 G2 LEGEND, NOTES & ABBREVIATIONS ---PAGE BREAK--- OF 90% REVIEW SUBMITTAL CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WA 8 PRELIMINARY 3 G3 SURVEY CONTROL AND ALIGNMENT PLAN ---PAGE BREAK--- OF 90% REVIEW SUBMITTAL CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WA 8 PRELIMINARY 4 C1 BASIN 1 MODULAR WETLAND SYSTEM PLAN ---PAGE BREAK--- OF 90% REVIEW SUBMITTAL CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WA 8 PRELIMINARY 5 C2 BASIN 3 MODULAR WETLAND SYSTEM PLAN ---PAGE BREAK--- OF 90% REVIEW SUBMITTAL CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WA 8 PRELIMINARY 6 C3 BASIN 4 MODULAR WETLAND SYSTEM PLAN ---PAGE BREAK--- OF 90% REVIEW SUBMITTAL CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WA 8 PRELIMINARY 7 C4 BASIN 7 MODULAR WETLAND SYSTEM PLAN ---PAGE BREAK--- OF 90% REVIEW SUBMITTAL CLARKS CREEK TARGETED OUTFALL RETROFIT PUYALLUP, WA 8 PRELIMINARY 8 DT1 DETAIL SHEET STORMGATE ADJUSTABLE WEIR (SEE DETAIL 1/2) GRADE RING (TYP) AND COVER (STD) PEAK FLOW OUTLET PIPE (SEE NOTE 4) INLET PIPE (SEE NOTE 4) VARIABLE DIAMETER (SEE NOTE 2) WATER QUALITY FLOW OUTLET PIPE (SEE NOTE 4) AND COVER (STD) 2'-2" MIN 4' MIN 3' 4" MIN SET SCREWS (TYP) (SEE NOTE 5) WEIR FRAME ADJUSTABLE WEIR PLATE (SEE NOTE 5) EMBEDMENT ANCHORS (TYP) 04/04/06 NONE SG-MH-DTL MJW ARG STORMGATE MANHOLE HIGH FLOW BYPASS PLAN AND SECTION VIEWS STANDARD DETAIL 1 1/2 1 1 STORMGATE MANHOLE - PLAN VIEW 1 A STORMGATE MANHOLE - SECTION VIEW 04/04/06 NONE SG-MH-DTL MJW ARG STORMGATE MANHOLE HIGH FLOW BYPASS TOP VIEW, WEIR DETAIL, DATA AND NOTES STANDARD DETAIL 2 2/2 2 1 WEIR DETAIL - PLAN VIEW 2 B WEIR DETAIL - SECTION VIEW 2 B 2 2 STORMGATE MANHOLE- TOP VIEW 1 A XXX X.XX X.XX XX" XXX.XX' XXX.XX' XXX XX" XXX.XX' XXX XX" XXX.XX' XXX XX" XX" XXX.XX' XXX.XX' X.XX' XXX.XX' XXX.XX' 1) STORMGATE BY CONTECH STORMWATER SOLUTIONS; PORTLAND, OR (800) 548-4667; SCARBOROUGH, ME (877) 907-8676; LINTHICUM, MD (866) 740-3318. 2) PRECAST MANHOLE TO BE CONSTRUCTED IN ACCORDANCE WITH ASTM C478. DETAIL DRAWING REFLECTS DESIGN INTENT ONLY. ACTUAL DIMENSIONS AND CONFIGURATION OF STRUCTURE WILL BE SHOWN ON PRODUCTION SHOP DRAWING. 3) STRUCTURE AND ACCESS COVERS TO MEET AASHTO H-20 LOAD RATING. 4) INLET AND OUTLET PIPING TO BE SPECIFIED BY ENGINEER AND PROVIDED BY CONTRACTOR. PRECAST STORMGATE MANHOLE EQUIPPED WITH EITHER CORED OPENINGS OR KNOCKOUTS AT INLET AND OUTLET LOCATIONS. 5) CONTRACTOR TO ADJUST WEIR TO DESIGN ELEVATION SPECIFIED IN DATA TABLE BELOW. DO NOT EXCEED 5.0 FT-LBS TORQUE WHEN TIGHTENING SCREWS ON WEIR FRAME. SEAL WEIR TO FRAME WITH RTV SILICONE SEALANT AFTER FINAL ADJUSTMENT. GENERAL NOTES 1 0.3397 4.20 48" 33.38' 27.61' CP 12" 27.36' PVC 12" 27.61' CP 12" 3.0" 29.78' XXX.XX' 2.1' 31.88' 27.61' 3 0.3655 4.46 48" 34.23' 30.32' PVC 12" 29.67' PVC 12" 30.32' PVC 12" 3.1" 32.17' XXX.XX' 0.6' 32.73' 30.00' 4 0.4289 5.05 48" 36.49' 32.89' CP 12" 30.94' PVC 8" 30.94' PVC 12" 3.3" 33.44' XXX.XX' 1.6' 34.99' 31.27' 7 0.6064 7.77 48" 33.88' 29.93' CP 12" 29.47' PVC 8" 29.92' CP 12" 4.0" 31.72' XXX.XX' 0.7' 32.38' 29.55'