Full Text
APPENDIX RD MANDATORY COMPLIANCE CERTIFICATE 2020 Georgia Residential Energy Code Compliance Certificate This certificate shall be posted on or near the electrical distribution panel or air handler Permit# _ Jurisdiction Logo and/or Contact Information Here House Address or Community/Lot# _ Building Summary Buil_derCo_rnpany_lll~rne - __Sif:nature + . Cont"cct(ernaB/phone) I Date - - - Compliance Pathway (check.one)· Building Envelope {when multiple .values.per-.component, list value covering largest area) D Prescriptive: R401-404 Ceiling/Roof R-value Above-grade mass wall R-value 0 UA Trade-off: R402.1.5 Sloped/vaulted ceiling R-value Cantilevered floors R-value 0 RESCheck: Keyed to 2015 IECC Exterior wall R-value Window/Glass Door SHGC D Simulated Performance: R405 Kneewail (cavity and/or continuous) R-value Window/Glass Door U-factor D Energy Rating Index (ERi): R406 Foundation (cavity and/or continuous) R-vaiue Skylight SHGC ERiScore Floors over unconditioned R-value Skylight U-factor Mechanical Summary ' --HVA_C I Con_tact_Jemail(phone) I Date . . Heating System Type Efficiency (AFUE, Cooling System Type Efficiency (SEER, Water Heating Type Efficiency (EF or . HSPF, COP or other) EER or other) other) D Gas D Air conditioner D Gas D Heat pump D Heat pump D Electric D Other D Other: D Other: D Yes D Nol Manual J, S, Dor equivalent complete? Required Mechanical Ventilation Type (check one) Design Rate (check one) D Exhaust D Continuous Design Ventilation 0 Supply D Intermittent Rate (CFM) D alanced B If 1n • termi nt Ii un n er tte , st r time I mm. p hour Duct and Envelope Tightness Testing Summary DET Verifier - I _Co_ntac~(~mail/phone) I DET Verifier ID Envelope Tightness Testing 5 ACHSO) (Envelope Tightness; Blower Door Fan Flow x 60 / Thermal Envelope Volume) Blower Door Fan Flow (CFMSO) lThermal Envelope Volume (ft') -[Envelope Tightness (ACHSO) If multifamily unit and conducting sampling, this unit is not required to be tested. Mark N/A. Duct Tightness Testing(< 6 CFM25/100 ft2) (Total Duct Leakage ; 100 x Fan Flow/ Area Served) Number of Heating and Cooling Systems Duct Tightness Leakage Test Results • System 1 System 2 System 3. If air handler and ductwork located entirely within in condi- Location Fan Flow Area Served (ft 2) Total Duct Leakage ft 2) Rough In Total (RIT) or Post Construction Total (PCT) Version 1.0