Document Pasco_doc_5505540383

Full Text

Framing Inspection Checklist - 1 - 7/2023 Framing Inspection Checklist  Anchor bolts installed with washers and nuts.  Anchor bolts within 12" of bottom plate break.  Seal all top/bottom plate holes or holes in the floor.  Seal horizontal penetrations 10' on center.  Seal around windows and exterior bottom plates.  Strong back with diagonal bracing on gables per manufacturer’s instructions.  Lateral bracing per individual truss papers.  Nail all truss hangers – all round holes need to be filled.  Nail all joist hangers – all round holes need to be filled.  Strap top plate breaks when 2 breaks occur within 24" with a 16 gauge strap and 6-16d nails on each side of break.  Positive connection on all post and beams.  Fire stop all top and bottom of all chases.  Make sure all joists have hangers – including stair landings.  Strap any beams to top plates where beam goes thru top plate  Nail all beam pockets.  Nail all corner studs 2 rows 16d nails at 24" on center.  Check that all roof ventilation has been installed.  Roof must be complete before framing inspection.  Get fix for any cut/damaged joist or truss from joist or truss company.  Toe nail rim board to sill plate at 6" on center.  Add studs under all double girder truss/double joist.  Smoke detectors required in all sleeping rooms and outside each sleeping room - within 15' and make sure detectors are more than 3' away from air return ducts or registers.  Fire block stair case and seal any holes in fire blocks  Max stud spacing 24" on center.  Transfer all point loads in crawl space.  Add sheetrock backing to tub/shower stalls and secure to walls.  Provide individual truss papers.  Provide approved plans, joist layout.  Clean crawl space of all debris.  Block all trusses at bearing locations. (see truss papers)  Block all joists at bearing walls.  Electrical must be completed and approved by Labor & Industries.  All other inspections must be passed at or prior to framing inspection.  Block any short joist to rim board.  Add full support under heals of rafters.  Check for tempered glass at required areas.  Check to assure house is built as per approved plans. Submit any changes for review and approval to the Building Dept office before framing inspection. Inspection Services I Building Division 525 N 3rd Ave, Pasco, WA 99301 P: [PHONE REDACTED] www.pasco-wa.gov I [EMAIL REDACTED]