Document Palmdale_doc_d2b054302f

Full Text

Specific Plan Plant 10 Palmdale ~Lockheed . Advanced Company RESOLUTION 92-169 DATE OF ADDOP.TION SEPT. 10, 19-92 (Updated 12-9-94) ---PAGE BREAK--- TABLE OF CONTENTS Chapter Page No. I. PURPOSE AND INTENT OF SPECIFIC PLAN 1 . 1 Authority 2 1 .2 General Plan Consistency 2 II. SUMMARY OF EXISTING CONDITIONS 14 2.1 Project Location (Regional/Local Setting) 15 2.2 Legal Description 16 2. 3 Easements 17 2.4 Existing Physical Conditions 17 2.4.1 Topography 17 2.4.2 Geology and Soils 18 2.4.3 Drainage and Flood Control 19 2.4.4 Vegetation 20 2.4.5 Hazards 22 2.4.5.1 Aircraft Noise/Accident Potential 22 2.4.5.2 Earthquake 26 2.4.5.3 Flood 28 2.5 Existing Land Uses/Zoning 29 2 .5.1 General Plan Land Use 29 2 .5.2 City of Palmdale Zoning 30 2.6 Existing Circulation 32 2.6.1 Regional Circulation 32 2.6.2 Local Street System 33 2. 7 Community and Regional Perspective 34 2. 7 .1 Population/Employment 34 2. 7. 2 Related Projects 35 2. 7 .3 Local Transportation Systems 36 2. 7. 3. 1 Local Bus Service 36 2.7.3 .2 Regional Bus Service 36 2.7.3.3 Railway Service 36 2.7.3.4 Air Service 37 2. 7 .4 Public Services 38 2. 7.4.1 Fire Department 38 2. 7 .4.2 Police Department 39 2.7.4.3 Medical Services 39 2.7.4.4 Schools 41 2.7.4.5 Solid Waste Disposal 42 Ill. EXISTING SITE AND DEVELOPMENT PLANS 43 3.1 Existing Site 44 3.2 Development Plan 45 3.2 .1 Description 45 3.2.2 Existing Buildings 46 3.2.3 Development Plan Buildings 50 3.2.4 Existing Parking 52 3.2.5 Development Plan Parking 54 3.2 .6 Existing Landscape 56 ---PAGE BREAK--- TABLE OF CONTENTS Chapter IV. 3.2. 7 Development Landscape Plan 3.2. 7 .1 Inside Perimeter Fence 3.2. 7.2 Outside Perimeter Fence 3.2.8 Existing Drainage 3.2.8.1 Regional Detention Basin 3.2.9 Development Drainage Plan 3.2.9.1 Retention Basins 3.2.9.2 Flood Control Basin 3.2.10 Existing Central Energy Services Facility 3.2.11 Existing Utility Duct Bank Distribution 3.2.12 Existing Domestic Water System 3.2.13 Development Plan Domestic Water System 3.2.14 Existing Fire Protection System 3.2.15 Development Plan Fire Protection System 3.2.16 Existing Power System 3.2.17 Development Plan Power System 3.2.18 Existing Communications System 3.2.19 Development Plan Communications System 3.2.20 Existing Sewer System 3.2.21 Development Plan Sewer System 3.2.22 Existing Natural Gas 3.2.23 Development Plan Natural Gas 3.2.24 Existing Compressed Air System 3.2.25 Development Plan Compressed Air System 3.2.26 Existing Steam System 3.2.27 Development Plan Steam System 3.2.28 Existing Site Security and Access 3.2.29 Development Plan Site Security and Access ll.AND USE AND DEVELOPMENT REGULATIONS 4.1 Land Use 4.1 .1 Manufacturing/Industrial Uses 4.1 .1 .1 Purpose 4. 1 .1.2 Permitted Uses - Industrial 4. 1.2 Restricted Manufacturing/Industrial Uses 4.1 .2.1 Purpose 4.1 .2.2 Permitted Uses 4.2 General Development Standards 4.2.1 Infrastructure 4.2.2 Building Height 4.2.3 Building Setbacks 4.2.4 Exterior Building Materials 4.2.5 Roof Access Ladders 4.2.6 Parking Ratios 4.2.7 Parking Lots 4. 2. 8 Parking Setbacks 4.2.9 Fencing 4.3.0 Loading Zones 4.3.1 Signage ii Page No. 56 56 56 58 58 59 59 60 62 63 64 65 68 68 70 70 73 73 75 75 77 77 79 79 81 81 83 83 85 86 87 87 87 87 87 87 88 88 89 89 89 89 90 90 90 91 92 92 ---PAGE BREAK--- TABLE OF CONTENTS Chapter v. APPROVAL AND AMENDMENT PROCESS 5.1 Approval Process for Development Plan 5.1 Review and Approval Process 5.1 .2 Contents of Submittals 5.1 .3 Minor Modifications to Approved Site Plan 5.2 Amendment Process for Specific Plan 5.2.1 Minor Modifications 5.2.2 Major Modifications iii Page No. 93 94 94 94 94 95 95 95 ---PAGE BREAK--- TABLE OF CONTENTS MAPS/ILLUSTRATIONS Regional Map Topography Area Drainage Accident Potential Zones Earthquake Fault Map/Seismic Shaking Zone Flood Hazard Area City General Plan Land Use Map Zoning Map Regional Circulation Local Street System Current Development Patterns Airports Community Services Schools Specific Plan Area Roads and Parking Landscape Drainage Domestic Water Fire Protection Power Communications Sewer Gas Compressed Air Steam Security Fence Specific Plan Land Use Map Typical Road and Utility Section Standard Chain Link Fence TABLES Existing Native Vegetation List of Zones/Supplemental Use Districts in the City of Palmdale Population and Employment Existing Buildings Development Plan: Normal Occupancy of Buildings Existing Buildings Description Development Plan Building Description Building Area Analysis: Existing Facilities Development Parking Plan Central Plant Service Capacity Domestic Water Demand Domestic Water Demand Summary Projected Kilowatt Demand Growth Plant 10 Kilowatt Demand Growth - Summary Plant 10 Sewer: Maximum Demand Service Requirements Compressed Air Demand Loads Steam Demand Load Parking Ratios Loading Space Schedule Loading Space Size Schedule iv Page No. 15 18 19 22 27 28 29 31 32 33 35 37 40 42 44 55 57 61 67 69 72 74 76 78 80 82 84 86 88 91 Page No. 20-21 30 34 46 47 48-49 50-51 52 54 62 65 66 71 71 75 79 81 90 92 92 ---PAGE BREAK--- PURPOSE & INTENT OF SPECIFIC PLAN I 1 ---PAGE BREAK--- I. PURPOSE AND INTENT OF SPECIFIC PLAN Lockheed Advanced Development Company (LADC) will be primarily located in Palmdale, California, including Company headquarters (President & staff), Engineering, Manufacturing Operations and support functions (i.e. Purchasing, Human Resources, Facilities Engineering, etc.). Some specialized facilities will remain in Rye Canyon and Helendale, California. LADC'S mission is to research, design, engineer and develop prototype aircraft and aerospace systems. The purpose for filing the Specific Plan is to ensure an integrated, well planned, high quality environment for the development of LADC'S facilities. This document fulfills the City of Palmdale Municipal Code and the State of California Specific Plan developmental standards. Upon adoption, it will constitute the site zoning ordinance. Subsequent development proposals shall be reviewed and approved, consistent with regulations in the Specific Plan. 1. 1 AUTHORITY This specific plan establishes basic land use and building standards for development of the 674.1 acre LADC Plan 10 site. The plan was prepared in accordance with California Government Code (Section 65450) and applicable ordinances of the City of Palmdale and will constitute zoning for the subject site. Zoning and building elements not addressed in the Plan will be governed by applicable City of Palmdale zoning and building ordinances. 1.2 GENERAL PLAN CONSISTENCY California State law requires all Specific Plans and Zoning Ordinances to be consistent with the local jurisdiction's adopted General Plan. This section presents consistency of the Lockheed Plant 10 Specific Plan with the policies set forth in the Palmdale General Plan. LAND USE Policy LU1 :All land uses shall be developed in accordance with the land uses designated on the land use map of the General Plan. Consistency:The Specific Plan, which proposes aircraft manufacturing, assembly and testing, is consistent with the Light Industrial designation on the General Plan Land Use Map. Policy LU2:1ncompatible land uses shall be separated by the provision of an adequate buffer area. Consistency:Adjacent land uses include Air Force Plant 42 to the north and east, the Southern Pacific Railroad to the west, and land planned for light industrial uses to the south. Thus, adjacent land uses are compatible with the proposed Specific Plan. Policy LU3:Use of Specific Plans and other comprehensive planning techniques shall be encouraged for the development of land. Consistency:Development of this property will be implemented through comprehensive regulations and guidelines provided in the Lockheed Plant 10 Specific Plan. 2 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Policy LU4: No uses shall be permitted by the City within the Accident Potential Zone of U.S. Air Force Plant 42 without first obtaining a written response from the Air Force that such use can be developed without undue risk to public safety. Consistency: Specific Plan does not propose any new uses within the Accident Potential Zones. Policy LU5: Residential land uses denser than one dwelling unit per acre shall not be permitted in the Accident Potential Zone. Consistency: The Specific Plan does not propose any residential uses. Policy LU6: Land uses shall be regulated within the seismic management zone to minimize the risk of personal injury or property damage. Consistency: The specific Plan area does not fall within the Seismic Management Zone. Policy LU7: Open spaces shall be used to create a visually pleasing environment, as well as to distinguish City and neighborhood boundaries. Consistency: The Plant incorporates open space areas throughout the Specific Plan area, and provides for perimeter landscaping to distinguish the Plant 1 0 facility from adjacent industrial development. Policy LU8: Land use patterns that encourage non-motorized modes of transportation usage will be promoted. Consistency: The Specific Plan provides for pedestrian access to and between site buildings from planned parking areas. Policy LU9: Land uses shall be organized to promote maximum opportunity for transit usage. Consistency: Land uses have been organized at the terminus of two secondary arterials (8th and 18th Streets East) and one Major (10th Street East). These roadways provide for the incorporation of a local and regional transit system. Policy LU10: Intensive uses and activities shall be restricted in areas where natural and/or man-made hazards may threaten life, property or a sense of well being. Consistency: Natural and/or man-made hazards (APZ I and II; 1 00 year flood plain) have been identified within the Specific Plan area. No buildings are proposed with APZ's I and II. All construction is required to comply with specific mitigation measures regarding site drainage to eliminate flood hazard risk. 3 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Policy LU11: Proposed land uses should not adversely affect valuable natural resources in areas containing such resources. Consistency: The Specific Plan land uses does not have an adverse impact on natural resources (i.e. sand and gravel) because the Specific Plan does not contain such resources. Policy LU12: A mix of different, but compatible, land uses and activities shall be encouraged throughout the City. Consistency: The Lockheed Plant 10 Specific Plan provides for expansion of a major aerospace manufacturing and administrative support facility in the Antelope Valley. This expansion is expected to serve employment needs of local residents as well as regional needs of north Los Angeles County. Policy LU13: Commercial facilities shall be provided to meet the retail and service needs of the community and, where feasible, such facilities will be conveniently accessible by bicycle and by foot, as well as by automobile. Consistency: The Specific Plan provides for a cafeteria and salvage sales operation. Policy LU14: Land uses shall be organized to avoid creating nuisances among adjacent land uses. Consistency: The Specific Plan land uses have been organized to create an integrated, cohesive and compatible land use pattern both on and off-site. Policy LU 15: Regional uses shall be oriented in close proximity to the regional transportation network. Consistency: The Specific Plan area, which serves to provide employment to the region, has convenient access to the Antelope Valley Freeway and the Palmdale Airport, via A venue P. Policy LU16: Recreational, cultural, and employment opportunities shall be provided to meet the needs of the community. Consistency: The Lockheed Plant 10 Specific Plan incorporates the recreational and cultural opportunities of the existing on-site Lockheed Aerospace museum. The Plan also provides for local and regional employment opportunities. Policy LU17: Industrial development shall be coordinated to encourage an integrated industrial area with maximum flexibility and access to the regional circulation network. 4 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Consistency: Industrial development within the Specific Plan area is integrated with other Specific Plan uses and has immediate access to both SR 1 4 and the Regional Airport. Policy LU 18: The City shall encourage the clustering of housing on selected sites to allow the maximum usage of land while retaining needed open space and other amenities. Consistency: This policy is not applicable to the Specific Plan. Policy LU19: The City shall promote infilling of vacant land within the center city and island areas. Consistency: The Specific Plan area is perhaps the best example of infill within an existing development in the City of Palmdale. Policy LU20: Higher residential densities shall generally be designated along transit routes and thoroughfares and near major activity centers. Consistency: This policy is not applicable to the Specific Plan. Policy LU21 : Proposed development shall conform to the building intensity (density range) shown on the Land Use Plan. The overall base density of the proposed development shall not exceed the maximum density permitted for the whole site nor be less than the minimum density permitted. Consistency: The Specific Plan conforms to the building intensity as shown on the Land Use Plan. HOUSING Policy H 1 . 1 : Continue to encourage a diversity of housing types, in suitable locations with in the City. Consistency: This policy is not applicable to the Specific Plan. Policy H 1 Continue to reduce hazards to health and safety to an acceptable margin of risk. Consistency: The proposed Plan avoids placement of planning areas where any potential risks to health and safety cannot be mitigated. Policy H1 Continue to obtain funds from the public and private sectors for housing assistance funds. Consistency: This policy is not applicable to the Specific Plan. Policy H 1 Continue to encourage the development and preservation of adequate numbers of rental units. 5 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Consistency: This policy is not applicable to the Specific Plan. Policy H1 Continue to encourage high density development in areas designated for such use. Consistency: This policy is not applicable to the Specific Plan. Policy H1 Continue to develop affordable housing including manufactured housing. Consistency: This policy is not applicable to the Specific Plan. Policy H1 Continue to encourage housing opportunities for families of all sizes. Consistency: This policy is not applicable to the Specific Plan. Policy H1 Continue to support housing programs for elderly citizens in Palmdale. Consistency: This policy is not applicable to the Specific Plan. Policy H1 Continue to assure housing needs of handicapped persons are met. Consistency: This policy is not applicable to the Specific Plan. Policy H 1 . 1 0: Continue to encourage special needs housing in locations where the requisite facilities and service can be made available. Consistency: This policy is not applicable to the Specific Plan. Policy H 1 . 11 Continue to assure the installation of the special amenities and facilities needed by the elderly and handicapped, such as wheelchair ramps, security and safety devices in housing to be utilized for them. Consistency: This policy is not applicable to the Specific Plan. Policy H 1 .12: Continue to encourage public and private financing for the maintenance of the existing housing stock. Consistency: This policy is not applicable to the Specific Plan. Policy H 1.13: Continue to process all development proposals in a prompt and timely manner. Consistency: Processing of the Specific Plan and accompanying environmental documentation is being carried out in a methodical and organized manner according to standard City procedure. Approval of developments within the Specific Plan area is similarly structured in the Approval Process section of the Plan. 6 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Policy H 1 . 14: Encourage the recognition from other localities that housing problems and needs extend beyond political jurisdictions. Consistency: This policy is not applicable to the Specific Plan. Policy H2.1: Continue to encourage the physical development of sufficient quality to insure and add to the visual amenities of the City. Consistency: The Specific Plan contains design guidelines and standards, and provides for perimeter landscape treatment to ensure that visual quality is maintained in the Specific Plan area. Policy H2.2: Continue to insure that all necessary support services can be provided to new development. Consistency: The Public Facilities Plan Component of the Specific Plan ensures that adequate services are available to support the development. Policy H2.3: Continue to encourage the development of affordable housing throughout the City. Consistency: This policy is not applicable to the Specific Plan. Policy H2.4: Continue to adapt zoning regulations to changing community needs. Consistency: Upon adoption, the Specific Plan will constitute the zoning for the plan area, meeting the future needs of aerospace industry. Policy H2.5: Continue to encourage minority participation in all sectors of the housing market. Consistency: This policy is not applicable .to the Specific Plan. Policy H3.2: Encourage water conservation and water reclamation techniques in all new developments. Consistency: The environmental documentation for the Specific Plan requires compliance with water conserving measures designed to achieve water conservation. Policy H3.3: Encourage the installation and use of energy efficient appliances in all new construction. Consistency: The environmental documentation for the Specific Plan recommends measures for energy conservation. Policy H3.4 Encourage "retrofit" weather seal and insulation of existing housing units. Consistency: This policy is not applicable to the Specific Plan. 7 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) COMMUNITY DESIGN Policy CD1: The Land Use Plan should establish buffer zones of other appropriate controls between adjacent incompatible land uses. Consistency: Adjacent land uses include Air Force Plant 42 to the north and east, the Southern Pacific Railroad to the west, and land planned for light industrial uses to the south. Thus, adjacent land uses are compatible with the proposed Specific Plan. Policy CD2: Physical land use development should be carefully integrated into the natural environmental setting hillside development should respect natural contours, rather than utilizing massive grading to reshape the site). Consistency: The Specific Plan area is relatively flat and will not be subject massive grading. Policy CD3: Design Review Boards, consisting of community design professionals, should be created to evaluate development proposals and to advise the Planning Commission and the City Council on appearance and design issues. Consistency: The Specific Plan provides a mechanism for individual site plan review as well as explicit design guidelines which must be followed. Policy CD4: All new power distribution networks, communication lines, and other service network facilities should be located underground as possible. Consistency: Specific Plan design criteria specify that utility lines be placed underground whenever possible in the Specific Plan area. Policy CD5: Design criteria will be established for on and off premise signs and billboards. Consistency: The policy is not applicable to the Specific Plan because the proposed facility is a private use not open to the public. Policy CD6: Special Districts should be made distinctive by preserving and emphasizing their scale, architectural character, and dominant activities. Consistency: Specific Plan development regulations and guidelines are oriented towards establishing a scale and character appropriate for a manufacturing facility. Policy CD7: A wider variety of shopping, entertainment, employment and residential activity should be encouraged throughout the City. Consistency: This policy is not applicable to the Specific Plan. 8 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Policy CD8: The City of Palmdale should encourage the inclusion of green space belts in large subdivisions, and provide for linking the green space systems among subdivision. Consistency: This policy does not apply to the Specific Plan. Policy CD9: Clustered housing should be encouraged throughout the city to enhance the aesthetic quality. Consistency: This policy does not apply to the Specific Plan. Policy CD10: The location and design of public facilities should play a strategic role in the overall community appearance. They provide essential services which should be grouped to form community focal points and permit space-saving economies. Consistency: The Specific Plan allows for a grouping of Public Facilities within the Plan area. TRANSPORTATION Policy T1: All City streets shall be constructed in accordance with the Circulation Map. Consistency: The Specific Plan proposes construction of private streets, consistent with circulation standards for non-public facilities. The exception to this is Lockheed Way, which is planned for improvement consistent with the City's Circulation Element. Policy T2: All City streets shall be c~nstructed in accordance with the City Engineering Manual. Consistency: The street improvement standards in the Specific Plan for Lockheed Way follow the design standards for the City of Palmdale. All other streets are proposed as private streets and will meet the minimum improvement standards set by the City for private streets. Policy T3: Schools, Parks, and neighborhood commercial uses shall be located within convenient walking distance to residential growth centers. Consistency: This policy is not applicable to the proposed Specific Plan. Policy T4: Access to major and secondary arterials shall be limited to protect the efficient flow of traffic. Consistency: The Specific Plan is located at the northerly terminus of 8th, 10th, and 1 5th Streets East. This location effectively limits access to these arterials to just three points. 9 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Policy T5: The City shall reduce congestion and the need for energy consumptive job commuting by providing expanded employment opportunities. Consistency: The Specific Plan will create local employment opportunities through the addition of 1,319,000 square feet of manufacturing office, warehouse and special support uses. Policy T6: The City shall support the concept of constructing a metropolitan bypass freeway for the purpose of providing an improved regional Highway 138 connection between 1-5 and 1-1 5. Consistency: The proposed metropolitan bypass (Highway 138) alignment lies south of the Specific Plan area. The Specific Plan does not affect this concept. Policy T7: A major dedicated access route to the Antelope Valley Freeway shall be required to minimize the adverse impacts associated with development of the Palmdale Regional Airport site. Consistency: The Specific Plan promotes the dedication of a major access route from the Palmdale Regional Airport to SR14 via Avenue P-8. Policy T8: Land uses shall be arranged in a manner which increases the opportunity to utilize alternate forms of transportation, such a mass transit systems, bikeways, and pedestrian thoroughfares. Consistency: Limited major roadways that are easily accessible to the entire Specific Plan provide opportunities for incorporation of commuter based transit systems within the Plan area. Policy T9: Higher density land uses shall be located in groups to facilitate use of mass transit programs. · Consistency: The Specific Plan area consists of higher density land uses whose location will facilitate the use of mass transit. Policy T10: The circulation map shall designate the location of existing and future transit terminals. Consistency: This policy does not apply to the Specific Plan. PUBLIC SERVICES AND FACILITIES Policy PS 1 : Groundwater sources should be developed and used to their safe yield. Consistency: Water supply will be provided by Palmdale Water District and Los Angeles County Water District 34. Groundwater overdraft as a result of cumulative effects of areawide development is expected to occur as a result of the proposed project. A Statement of Overriding Considerations will be required prior to approval of the Specific Plan. 10 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Policy PS2: New imported water should be used for irrigation to relieve over utilized groundwater sources and the rates for this use made competitive with pumping groundwater. Consistency: The Specific Plan itself will not result in a significant impact to groundwater resources. The Plan proposes wastewater treatment facilities to serve manufacturing uses, with in combination with other required water conserving measures in the Draft EIR for this project, result in an insignificant impact to groundwater resources. Policy PS3: Residential land use densities greater than two units per acre should be served by community water systems for public sewerage system. Consistency: This policy is not applicable .to the Specific Plan. Policy PS4: Land use densities greater than three units per acre should be served by a public sewerage system. Consistency: The proposed plan will provide public sewer service. GOVERNMENTAL SYSTEMS Policy GS1 : The major recommendation of this element is that the City of Palmdale continue its annexation program to include the entire planning area encompassed by this plan, both populated and unpopulated areas. Consistency: This policy does not apply to the proposed Specific Plan; the Specific Plan is currently within City boundaries. Policy GS2: Subdivision procedures should require annexation to existing service districts when public services are required in developing areas. Consistency: This policy does not apply to the proposed Specific Plan. Policy GS3: Joint school and City recreational facilities should be shared and maintained by Palmdale School District through joint powers agreement. Consistency: This policy does not apply to the proposed Specific Plan. ENVIRONMENT AL RESOURCES Policy ER 1 : An open space network should be established to protect and preserve the ecological balance of wildlife and plant communities. Consistency: The Specific Plan provides for preservation of a majority of the on- site native vegetation by locating planned buildings to avoid these areas. 11 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Policy ER2: Urban development should be consolidated in well-defined growth centers to reduce disruption of native plant and animal habitat and to prevent degradation of unique ecological areas. Consistency: The Lockheed Plant 10 Specific Plan is a well-defined growth center which is centrally located adjacent to existing Air Force Plant 42 operations in the City of Palmdale. For this reason, the chances for disrupting the ecological wildlife surrounding the City is minimal. Policy ER3: Development should be encouraged to utilize and enhance natural topographic features, thus establishing harmony between the natural and man-made environment. Consistency: This policy does not apply to the proposed Specific Plan. Policy ER4: High priority should be given for routes proposed for scenic corridors or bikeways which form linkages between recreational areas. Consistency: This policy does not apply to the proposed Specific Plan. Policy ER5: Implement land use policies which concentrate growth and discourage premature urban expansion. Consistency: The Specific Plan represents a concentration of growth in central Palmdale. SEISMIC SAFETY Policy SS1: Standards and criteria to reduce unacceptable levels of seismic risk should be established and enforced. Consistency: Seismic risk will be avoided to the extent feasible. Policy SS2: Selective land use and building regulations should be adopted and enforced in areas of high seismic hazard. Consistency: Project structure will be built according to standard seismic codes. Policy SS3: Development should be minimized in active fault zones per current standards. Consistency: Development is not planned within any fault zones PUBLIC SAFETY Policy PS1: Standards to reduce unacceptable levels of fire and geological risk should be maintained. 12 ---PAGE BREAK--- 1.2 GENERAL PLAN CONSISTENCY (cont'd) Consistency: The Specific Plan incorporated, by reference, all Federal, State and local codes related to fire and geologic hazards. Policy PS2: Urban development should be carefully controlled in areas with identified brush fire hazards except in areas where fire retardant planting and/or fuel removal have removed the fire hazard, to the satisfaction of the County Authorities. Consistency: The Specific Plan area does not fall within a fire hazard area. 13 ---PAGE BREAK--- SUMMARY OF EXISTING CONDITIONS II 14 ---PAGE BREAK--- II. SUMMARY OF EXISTING CONDITIONS 2. 1 PROJECT LOCATION Regional Setting Palmdale, California is on the southern 'High Desert' region of southern California' s Antelope Valley which was formed by the rifting regional faulting and is bordered on the east by Mojave Desert, the south by the Sierra Pelona-San Gabriel mountains, the west by the Tehachapi Mountain range, and the north by the Sierra Nevada range. The City of Palmdale, located in north Los Angeles County, is approximately 48 miles north of Burbank Airport, 58 miles from the Los Angeles city center and approximately 38 miles from LOCKHEED' S Rye Canyon facility located in Santa Clarita. SIMI ~B ' OX NARD THOUS AND • O AKS ND SCALE MOJAVE DE SERT S A N BER NAR DIN O • REGIONAL MAP 15 ---PAGE BREAK--- Local Setting The side bordered on the west by Southern Pacific Railroad (SPAR) right-of-way and Sierra Highway, north and east by USAF Plant 42 and south by Lockheed Way and Avenue P. The east boundary is 15th Street East, a city designated secondary highway of 80' width. It continues north separating Air Force Plant 42 from Lockheed property. A private road on Air Force property to the north borders Lockheed property, and provides access to Air Force Building No. 870. This road extends to the Southern Pacific Railroad right-of-way which borders the site on the west. Lockheed Way (Avenue 0-8) borders the southern line of the westerly portion of the property between the Southern Pacific Railroad and the center line of 10th Street East. The Lockheed Way 80' right-of-way and 100' right-of-way centers on the original property line. Lockheed Way separates the two parcels between 10th and 15th Streets East. The 10th Street East, 100' wide right-of-way borders the property to the west of the southern portion, extending from Avenue Pon the south to Lockheed Way. Avenue P, a city designated major highway of 100' width borders the southern portion of the site. There is no apparent available record of the dedication of Lockheed Way (A venue 0-8) between the Southern Pacific right-of-way and 15th Street East. The County of Los Angeles maintains Lockheed Way for the City of Palmdale. 2.2 LEGAL DESCRIPTION A record of survey by G.R. Psomas (LLS. 2301) in June 1968, identifies the boundaries of the original 539.15 acres of the Lockheed/Palmdale Plant 10 site in the following legal description. Portions of Sections 11, 12 and 14 in Township 6 North, Range 12 West, San Bernardino Meridian, in the county of Los Angeles, State of California, according to the official plot of the survey of said land filed in the Bureau of Land Management, and also Lot 1 of Tract No. 10828 in the County of Los Angeles, State of California, according to map thereof recorded in book 188, page 30 of Maps, records of said county. The southern legal description for the 144. 5 acres acquired in 1 969 is as follows: "Lot 37 to 44 inclusive, and Lots 53 through 60 inclusive, all in Track No. 5110, in the City of Palmdale, County of Los Angeles, State of California, as per map recorded in book 177 pages 28 and 29 of Maps in the office of the County Recorder of said County, excepting therefrom: the South 208.71 feet of the west 208.71 feet of said Lot 40; the south 208.71 feet of the east 208.71 feet of said Lot 44; the south 106.97 feet of the west 270.61 feet of said Lot 57; those portions of Lots 53, 59 and 60 located southeast of a line which bears north 45 - 33'-49" east and which intersects the south line of Section 13, Township 6 north, range 12 west, San Bernardino meridian, at a point located 825 feet west of meridian, at a point located 825 feet west of the southeast corner of the southwest 1 /4 of said Section 13 and which intersects the east line of said southwest 1 /4 of Section 13 at a point located 867 feet north of the southeast corner of said southwest 1 /4 of said Section 13" . Exceptions generally cover reservations by PIO (Palmdale Irrigation District) for the existing well site at the northeast corner of 10th Street East and Avenue P, two future well sites on 10th Street East and 1 5th Street East respectively. 16 ---PAGE BREAK--- 2.3 EASEMENTS Southern California Edison Company maintains a 25' easement parallel to and west of the 1 00' 10th Street East right-of-way and east of the 60' right-of-way at Tristar Way to vaults at manhole No.1 opposite Building 608. Los Angeles Sanitation District maintains service in a 30' wide easement for public utilities west of the center line in 10th Street East. This easement is vacated north of Avenue 0-5. Southern California Gas Company maintains a 1 O' easement for pipeline purposes west of the 100' 10th Street East right-of-way and 1 O' south of the centerline of Tristar Way. This easement continues west to termination at the meter for Building 607. There is another 50' wide public utility easement east of the westerly property line according to LADC drawings. 2.4 EXISTING PHYSICAL CONDITIONS 2.4.1 TOPOGRAPHY The floor of the Antelope Valley is predominantly flat. Elevations vary from 2300' to 4000' above sea level. The LADC Plant 10 site is at an elevation of approximately 2580'. The terrain generally slopes downward to the north east. The predominant building pad, including the area supporting all existing on-site structures, has been graded relatively flat leaving an upper shelf of triangular form at the west property line and a lower 55 acre rectangular shelf along 15th Street East. These shelves vary in grade from 0 to over 20 feet above and below the basic pad. No further major grading is anticipated in the development of this plan. 17 ---PAGE BREAK--- NO SCALE 2.4.2 GEOLOGY AND SOILS Cf) < UJ I 1-w. w a: Cf) I I- . TOPOGRAPHY The site lies in the lower plain of slope from the Sierra Pelona foothills of the San Gabriel mountains w hich slopes generally to the northeast at approximately 1: 120 or 0.8%. Early soils reports indicate the site was originally covered with a moderate growth of vegetation w ith most being stripped during grading of the pad. The northeasterly portion of the site has filled and westerly portion of the site has been excavated. Compacted fill is expected to be encountered in depths from 0 to 20 feet. Ground water w as not encountered w ithin exploratory depths of 60 feet. Natural soils of the vicinity are silty sand undelain primarily by sand. 18 ---PAGE BREAK--- 2.4.3 DRAINAGE AND FLOOD CONTROL General drainage pattern is across the valley floor to the north and east. This flow has been re- directed somew hat around the major graded pad of the LADC Plant 10 site. The southern section of LADC property is traversed by a wash on the Anaverde storm drain system, including a 55 acre Regional Detention Basin shown the lower shelf of LADC property north of Lockheed Way and w est of 15th Street East. REGION AL DE TENTION BASIN LADC PLANT . ND SCALE (.S10\J!'-0W.o. I; n .R{(HARCf P'RE S( l'NE I PL A NT <2 ? r I / . I I I l ' \ : 1 11 l I I l I . 1 , " , . l I y - J 111 { - - AREA DRAINAGE 19 ---PAGE BREAK--- 2.4.4 VEGETATION No plants or vegetation designed as sensitive by Federal or State Agencies were detected during the site survey. The native area consist of a Joshua Tree woodland Mojave desert scrub plant community. Following is a list of observed floral species: SCIENTIFIC NAME ASTERACEAE Acamptopappus sphaerocephalus Ambrosia acanthicarpa Artemisia tridentata parishii nauseosus hololeucus "Gutierrezia microcephala Lessingia sp. T etradymia stenolepis BRASSICACEAE altissimum CACTACEAE Opuntia echinocarpa CHENOPODIACEAE Atriplex canescens "Salsola australis EPHEDRACEAE Ephedra nevadensis EUPHORBIACEAE "Eremocarpus setigerus GERANIACEAE • Erodium cicutarium Heliotropium curasavicum oculeatum LILIACEAE Yucca brevifolia POACEAE "Brom us rubens "Bromus tectorum Stipa speciosa POL YGONACEAE "Eriogonum davidsonii Eriogonum maculata Eriogonum fasciculata 20 COMMON NAME Golden heads Western Ragweed Great Basin Sage Rabbitbrush Match weed Autumn Vinegarweed Felt-leaf Cottonhorn Tumble-mustard Golden Cholla Four-wing Saltbush Tumbleweed Mormon Tea Turkey Mullein Red-stem Filaree Chinese Pusley Joshua Tree Red Brome Grass Cheat Grass Desert Needle Grass Skeleton weed Leafy Annual Buckwheat Coastal Buckwheat ---PAGE BREAK--- SOLANACEAE Lycium andersonii Larrea divaricata tridentata CULTIVATED PLANTS *Cupressus arizonica *Rosmarinus officinalis Peachthorn Creosote Bush Arizona Cypress Rosemary * = Species found on both native and non-native (disturbed) areas. NOTE: Species list is a composite from surveys conducted on September 30, 1989; and December 20, 1991 . Unless otherwise noted, species listed represent those found on native (moderately disturbed) areas of the project site. 21 ---PAGE BREAK--- 2.4.5 HAZARDS Plant 10 site is subject to hazards from three basic sources; Aircraft operations and the resultant USAF Plant 42 AICUZ, Potential seismic activity, Potential inundation from the 50 or 100 year flood conditions related to the Ana Verde flood control System, Hazardous material chemical release, and Ground vibration from railway activity. These hazards were considered in sitting, planning and constructing of future buildings. 2.4.5.1 Aircraft Noise and Accident Hazards Development limits are imposed at the LADC Plant 10 site through land use restrictions and height obstruction limitations outlined in the USAF Plant 42 Air Installation Compatible Use Zones (AICUZ) and City of Palmdale City Council Resolution 91-37. Restricted areas based on aircraft accident potential APZ are also defined in the AICUZ. @ ' ND SCALE I : ~ . . . I hu. I ~ l I I i ' I I l -I - - 1 ! : 1 I SOURCE: USAF PLANT 42 AIC UZ. OCTOBER 199 0 ACCIDENT POTENTIAL ZONES 22 ' \ i I : - . L. - I ! ' I t i - L ~ I ~ \ j·1 I 1· I, \1 : i I i . . . ---PAGE BREAK--- - rr!~ , / / § ii"'! · L: = ~ _.-hi . . 11 : · : I ! . ! . . I : 1 . . . I i ~ . ' i - - ·i-f. rz ; I ~ L. A_ D. C_ PLANT 1 0 AICUZ - A.F. PLANT 42 .t MASTER PALMDALE, PLAN CALIFORNIA o· 200· 400· soo· 23 ---PAGE BREAK--- 0 0 0 -c c> . . _ Q 0 500" E.LE.VATION PLAN a H t I -~J1· 1 F. . E - . , 150· E!..EY . - ~ _oo_o_· , 11[--200· 50 .000" LONGITUDINAL· SECTION c RUHWAY I ~ 1000· Jo.ooo· 500' E!..E.YAT IO.~ TRANSVERSE SECTION CLASS B RUNWAY IMAGINARY SURFACES AFR 86-14/TMS-803-7/NAVFACP-971-12 MAY 1981 A PRIMARY SURFACE B CLEAR ZONE SURFACE C APPROACH-DEPARTURE CLEARANCE SURFACE(SLOPE) D APPROACH-DEPARTURE CLEARANCE SURFACE(HORIZONTALl E INNER HORIZONTAL SURFACE F CONICAL SURFACE G OUTER HORIZONTAL SURFACE H TRANSITIONAL SURFACE 24 1. Datum elevation for: a . surface D E F and G is the established airfield elevation. b. surface C is the runway centerline elevation at the threshold. c. surface H varies at each point along the runway centerline. 2. The intersections shown on the plan are for the case of a level runway. ---PAGE BREAK--- A PRIMARY SURFACE B CLEAR ZONE SURFACE C APPROACH-DEPARTURE CLEARANCE SURFACE (50:1 SLOPE RATIO) D APPROACH-DEPARTURE CLEARANCE SURFACE (500' HORIZONTAL ELEVATION) E INNER HORIZONTAL SURFACE (150' ELEVATION) F CONICAL SURFACE (20:1 SLOPE RATIO) G OUTER HORIZONTAL SURFACE (500' ELEVATION) H TRANSITIONAL SURFACE (7:1 SLOPE RATIO) A ISOMETRIC CLASS B RUNWAY IMAGINARY SURFACES AFR 86-14/TMS-803-7/NAVFACP-971 12 MAY-1981 Q 25 AICUZ Q ---PAGE BREAK--- Noise contours (LON and CNEL) created by aircraft operations have little effect on land use at the site, however, noise control procedures may be required to maintain acceptable interior noise levels for certain uses in the higher noise zones. The Accident Potential Zones (APZ) related to the approach and departure tracks from each runway are more restrictive. The APZ is divided into three zones. Most restrictive is the clear zone, off the end of the runway; the next is APZ-1, and the least is APZ-2. These zones and the related land use matrix are shown in the AICUZ section of this report. The AICUZ document also establishes height obstruction clearance requirements derived from the Federal Aviation Administration (FAA) Federal Air Regulations (FAR) Part 77. A portion of the site is subject to the impacts and restrictions imposed by aircraft noise contours (CNEL), Accident Potential Zones (APZ) and height limitations from flight operations on USAF Plant 42 Runway 04/22. Working environments in close proximity to aircraft engines will be subject to Occupational Safety and Health Administration (OSHA) and United States Department of Labor Standards adopted by California OSHA (California Administrative Code Title 8, Industrial Relations Chapter 4) which determine the allowable duration of exposure to noise exceeding prescribed levels. Noise control procedures, such as engine test enclosures and ear protection devices, may be required for compliance with the standards. 2.4.5.2 Earthquake Hazard Palmdale and LADC Plant 10 are located north of the San Gabriel Mountains. The geological setting is dominated by the potentially active San Andreas and Garlock faults which are to the southwest and northwest, respectively. The San Andreas is located 4 miles to the south, the Garlock fault 35 miles northwest, and the San Jacinto fault, also moderately active, to the southeast. The most significant of these, the San Andreas fault, is considered capable of generating the greatest ground site motions. Only one great earthquake (1857 Fort Tejon earthquake) has occurred along the fault segment nearest Palmdale during recent time. Seismologists estimate a rather high probability, approximately 50 percent, for a large earthquake on this portion of the San Andreas fault during the next 50 years. The San Andreas fault dominating the earthquake dictates a maximum credible site earthquake of Richter magnitude. This suggests that new structures for Plant 10 should be designed to withstand forces by the postulated quake. 26 ---PAGE BREAK--- Los Angeles County Antelope Valley area plan hazard and resources map designates certain areas along the San Andreas rift zone, to the south of Palmdale as "Seismic safety management zones" . These coincide with the Alquist-Priolo seismic special studies zone and are restrictive according to land use policy. City of Palmdale General Plan, Earthquake Fault Zone Map indicates the site is within a "seismic shaking zone" . Structural design of future buildings are required to meet Seismic Zone 4 standards specified in the Uniform Building Code. i . I USAF f . . - PLANT 4 Z ! / l _ _ .J ~ _j NO SCALE SEISMIC SHAKING ZONE 27 ---PAGE BREAK--- 2.4.5.3 Flood Hazard Lockheed/Palmdale Plant 1 0 site and surrounding area receives storm water runoff from the foothill slopes to the south, and in particular, the Anaverde Creek Wash. City of Palmdale Master Plan of Drainage shows the runoff directed and controlled by a series of open channel/closed conduit drainage corridors terminating in detention basins or ground water recharge preserves. An approximate 55 acre portion of the site adjoining 15th Street East has been designated such a preserve. Discharge from the basin is by culvert beneath the existing road to an open channel/closed conduit system terminating in a similar basin on Plant 42 property at Avenue M. Effects of the Ana Verde natural drainage course traversing the site are reflected in the southern and eastern portions of the site being designated Flood Hazard areas and Other Flood Areas on the Federal Emergency Management Agency (FEMA) Flood Hazard Boundary Map. 100 YEAR FLOOD HAZARD AREA NO SCALE FLOOD HAZARD AREA 28 I _ 1 - - ( 4 ~ " - ---PAGE BREAK--- 2.5 EXISTING LAND USES/ZONING Lockheed Palmdale Plant 10 facility falls under the jurisdiction of the City of Palmdale. 2.5.1 GENERAL PLAN LAND USE City of Palmdale's General Plan Land Use Plan designates the project site as "Light Industrial." NO SCALE AVENUE U - AVENUE p I PALMDALE I CITY OF PALMDALE LAND USE PLAN 29 LECENO LIG i :N0u$T;'UAL 2 " EOll.llA ll'l()USTR1"L J s:>:c.-ic "L"N ZONE 5 OF'EN S;>ACE 6 COMMUNITY COMMERCIAL r ---PAGE BREAK--- Area across Sierra Highway west of the site is designated Light Industrial backed up by Multi- family Residential uses. South of Avenue P between Sierra Highway and 15th Street East is designated Light Industrial. Closest property planned for residential use is the Multi-Family zone located north of Avenue P approximately 2000 feet west of the site, adjacent to and west of the Light Industrial land use designation along Sierra Highway. 2.5.2 CITY OF PALMDALE ZONING CITY OF PALMDALE LIST OF ZONES A-1 A-2 R-1 R-2 R-3 R-PD C-1 C-2 C-3 OS CM C-PD M-1 M-2 M-A M-PO S-PB S-R Light Agricultural Heavy Agricultural Single-Family Residential Low Density Multiple Residential Medium Density Multiple Residential Residential Planned Development Neighborhood Commercial Light Commercial Medium Commercial Open Space Commercial Manufacturing Commercial Planned Development Light Manufacturing & Industrial Medium Manufacturing & Industrial Aircraft Manufacturing-Industrial Planned Development Parking & Buffer Recreational LIST OF SUPPLEMENTAL DISTRICTS -CC . Civic Center District -D Design District -HD Height District -0 Quarry District -DP Development Plan 30 ---PAGE BREAK--- Current City of Palmdale Zoning Map differs with the General Plan in designated Land Use in the area. This map, dated January 1991 , shows the area north of P Street to a diagonal line north of Lockheed Way, between 10th Street East and 15th Street East, as an A-2-5, zone. Balance of LADC property is zoned MA (Manufacturing Aircraft). I I I LOS . - -:io - - - - - - ~ NO SCALE L ADC PLANT 10 CITY OF PALMDALE ZONING 31 I l A_ . ' 3 0 ~ ~ ;c=:t'Zir:: ---PAGE BREAK--- 2.6 EXISTING CIRCULATION 2.6. 1 REGIONAL CIRCULATION Primary north/south access to the Antelope Valley and City of Palmdale is by State Highway 14, The Antelope Valley Freeway. Primary east/west access is State Highway 138, designated Palmdale Boulevard through the city. Sierra Highway, roughly paralleling State Highway 14, is the primary local north/south artery and borders the site on the west. There are several proposals being considered for widening and straightening the newly approved alignment of Highway 138 which will become future east/west freeway. The freeway alignment is in jeopardy because of the significant development taking place within the adopted route. New alignment may be required and current thinking is to move the alignment north in the vicinity of Avenue P-8 which would be convenient to development on the south side of Plant 42, including the LADC Plant 10 site. 10 I.OS A...c.E.L(S. ® REGIONAL CIRCULATION _ NO SCALE 32 ---PAGE BREAK--- 2.6.2 LOCAL STREET SYSTEM Street system is a basic grid with major east/west streets designated by letters and the north/south streets assigned numbers. Site is located just north and east of the intersection of Avenue P and Sierra Highway. Both streets are designated major highways with 1 00' rights-of-way on the City of Palmdale Mater Plan for streets and highways. Avenue P is the primary collector and distributor of Plant 10 employee traffic. Current primary access to the site is 8th Street East right-of-way is 80' from Avenue P north to Plant 10 and terminates north of Lockheed Way at the main gate to LADC Plant 1 O. Traffic ~ l 1. , . ~ , l 0 ; 0 : : x - x 0 = OF LOCAL STREET SYSTEM NO SCALE See Traffic Study. 33 AV'( W A Y ( •vt 0 PALMDALE / ( ---PAGE BREAK--- 2. 7 COMMUNITY AND REGIONAL PERSPECTIVE 2. 7 .1 POPULATION/EMPLOYMENT Projected population forecast for the year 2010, depicted for a high growth scenario based on the 24 percent annual grow rate experienced by Palmdale between 1 984 and 1987, indicates a population for the year 2010 of 126,400 residents which approximates four times the 1987 estimated population. Primary sources of employment in the area are listed below: I EMPLOYER I EMPLOYEES 6/90 I PRODUCTS I MANUFACTURING Lockheed Aircraft Co 2,000 Military Aircraft Rockwell International 1,825 Aircraft, Aerospace U.S. Borax & Chemical Co 843 Chemical Northrop Aircraft Corp. 2,800 Military Aircraft NASA 800 Aircraft, Aerospace California Portland Cement 160 Cement Lancaster Business Park 1,430 Business/Industrial Park NON-MANUFACTURING Edwards Air Force Base 13,780 Aerospace Research Antelope Valley Hospital 1,250 Medical Hospital Lancaster School District 1,250 Elementary Schools Antelope Valley Union 1,000 High Schools Lancaster Community 400 Medical Hospital (173 beds) Federal Aviation Admin. 525 Air Traffic Control/Maint High Desert Hospital 590 Medical Hospital (173 Beds) Gen Telephone, So Cal 328 Public Utilities Antelope Valley College 519 Education Antelope Valley Business Co 291 Transportation Agency Desert Inn 197 Hotel/Restaurant/Caterer Although 66% of the work force in the Antelope Valley is employed at locations within the Antelope Valley, 34% commutes to jobs outside the Antelope Valley to job locations in the east San Fernando Valley, central Los Angeles and Santa Clarita Valley. Local employment rate is expected to lag behind population growth through 2010. This seemingly negative consideration for the Palmdale vicinity reflects the population explosion in L.A. County and the insurgence of affordable housing in outlying communities with employment found at work sites in other parts of the County. 34 ---PAGE BREAK--- 2.7.2 RELATED PROJECTS As the growth in population suggests, the Palmdale Lancaster area is experiencing a proportional growth in housing, commercial and industrial areas. From April 1987 to April 1989, Palmdale developers processed; 8,891 single family residential lots; 1500 apartment/condominiums and multi-family units; 528,000 square feet of commercial space plus a 150 room hotel, and auto dealership, an office and business park and a shopping center; 426,000 square feet of industrial/warehouse space along with industrial parks, a manufacturing center, a school and a church. CURRENT DEVELOPMENT PATTERNS NO SCALE Source: City of Palmdale General Plan Land Use Element 35 ---PAGE BREAK--- The new Sierra Gateway Center multi-acre industrial park in the C-M & M-2 Zone west of Sierra Highway across from Plant 10 is under construction with the first building completed. US Air Force Plant 42, called the Production Flight Test Installation, borders the site on the north and east has been used to assemble and fly the B-1 B bomber, the B-2 Stealth Bomber, NASA's Space Shuttle and many other aircraft and weapons systems. Northrop, Rockwell and Lockheed are major aerospace contractors located at Plant 42. The FAA also operates the Los Angeles Air Route Traffic Control Center at their facility at 25th Street East and Avenue P bordering Plant 42. This facility serves 215 public airports and 20 military airfields. 2. 7 .3 LOCAL TRANSPORTATION SYSTEMS 2. 7 .3.1 Local Bus Service Palmdale is serviced by the Antelope Valley Bus Company providing local transportation between Quartz Hill, Lancaster, Little Rock and Palmdale which includes approximately 100 buses equipped for 41 to 48 rider capacity. Service is generally on an hourly basis, however, no service is provided along Sierra Highway or Avenue P in the vicinity of LADC Plant 10. Antelope Valley Bus Company provides transit service, charter service and commuter service. Currently providing up to 4 buses daily from the Antelope Valley to LADC Burbank. A similar commuter service could be provided locally. Service can be initiated with a minimum of 39 guaranteed riders daily. Antelope Valley Airport Express offers commuter services from Lancaster and Palmdale to Los Angeles International Airport. Service includes 8 round trips daily and approximate trip time is 2 hours with stops in Palmdale and Newhall. 2. 7 .3 .2 Regional Bus Service bus service is available to and from points outside the Antelope Valley. Two buses daily each way service the San Fernando Valley. Timing of this service is not convenient to employee transit. Truck freight service is provided by eight local lines with parcel post service provided daily. 2. 7 .3.3 Railway Service Amtrak does not offer passenger service to or from Palmdale. Southern Pacific Railroad provides transcontinental freight service connecting Los Angeles, San Francisco and market centers in the continental United States and Mexico. Southern Pacific Railroad and right-of-way abuts the Plant 1 0 site on the west. An existing spur serves the site at Building 601 for loading and off-loading of material, supplies and aircraft products logistically required. An adjacent spur to the north serves a 500,000 S.F. building under the jurisdiction of Air Force Plant 42. Trainmaster in Mojave reports on a typical day, 24 to 30 trains, evenly divided northbound and southbound, pass through Palmdale. Mojave is considered a major terminal where through trains drop off cars which are reassembled with a local train servicing various locations in the valley, including Palmdale and the LADC Plant 10 site. This local distribution occurs up to 3 times per week. If required, through trains will stop directly at the LADC Plant 10 site, disconnect cars, and have the local train come to move cars on-site as required. Service to Plant 10 includes delivery of aviation jet fuel, aircraft parts and basic materials. 36 ---PAGE BREAK--- 2. 7 .3.4 Air Service Future development of 17,600 acres immediately east of Air Force Plant 42, designated for the Palmdale Regional Airport, remains uncertain. Contingent on many factors, including citizen concern, Air Force requirements, airline demand, and transport connection to the Los Angeles basin, it remains a future project. Access to transportation is provided by the Antelope Valley Express bus for six airlines based at Los Angeles International Airport and two local airlines based in Lancaster at Fox Field. Eight round trips per day are currently provided to LAX. AIRPORTS ND SCALE 37 - · ,p ---PAGE BREAK--- Air service has been re-established for the Palmdale and Lancaster area through direct service to the Department of Airports terminal on the south side of USAF Plant 42. Access to the terminal is via 20th Street East. Service is programmed for expansion in keeping with demand. Initial service has been established as connecting flights to major airports serving as airline hubs. America West Airline initiated service in early 1990 with four flights per day from Palmdale to Las Vegas and Phoenix with continuing service to other destinations. Delta Air Lines connector Sky West, is serving Palmdale with 8 flights daily between 6:00 a.m. and 10:30 p.m. Sky West operates Swearingen Metroliners with a 10 seat passenger capacity. Operators of van ground shuttle services are providing door-to-door service to the Palmdale Regional Airport from across Antelope Valley and the north San Fernando Valley. Palmdale Regional Airport has completed a $ 200,000 taxiway improvement and is completing a $500,000 Terminal Building improvement. Airport Authority has signed a joint operating agreement with the Air Force and the Air Traffic Control Tower hours have been extended, starting at 6AM and concluding at 1 2 midnight. 2. 7 .4 PUBLIC SERVICE 2. 7 .4.1 Fire Department Existing on-site and off-site protection service, including personnel and equipment, will service the existing and proposed LADC Plant 10 development. L.A. County Fire Department will be the primary responder. LADC has its own Fire Prevention Bureau operating from Building 61 2. This facility functions as an alarm station with radio dispatch capability. Antelope Valley is serviced by the Los Angeles County Fire Department through 14 fire stations throughout the area. There are two stations in Palmdale and three in Lancaster. Up to 50 fire fighters are on duty at any 24 hours per day. New stations in Lancaster and Palmdale are scheduled depending on area growth and available funding. A mutual-aid agreement is in effect between LA County Fire Department and Kern County Fire Department to provide additional resources if needed. Should LA County Fire Department assistance be required at Plant 10, the First Alarm assignment would generate response from Station 24 located at 10th Street West and Avenue P, approximately 2 miles from the facility. Response time is approximately 4 minutes. Station 24 has one engine company and one truck company with 6 fire fighters on duty 24 hours per day. First Alarm back-up is provided by Station 37, located on 9th Street East in Palmdale and Station 129, located on Avenue M Just west of Sierra Highway in Lancaster. Station 37 has one 3 man engine company and a 2 person paramedic unit. Station 1 29 has one 3 person engine company and is the Antelope Valley north LA County Communication Center, dispatching equipment as required. 38 ---PAGE BREAK--- Fire Department provides emergency paramedic rescue services out of Station 33 in Lancaster and Station 37 in Palmdale. Station 37 located on 9th Street East in Palmdale has a 2 person paramedic unit with a 4 minute response time to Plant 10. Air squad 9 located at Camp 9, Bear Divide Ranger Station in Santa Clarita and Air Squad 8 located in Malibu provide helicopter paramedic rescue service to the Antelope Valley area. Air Squad 9 is on duty 24 hours per day. A five person hazardous material response team serves from Station 76 located on Henry Mayo Drive West of 1-5 in Santa Clarita. Response time isle approximately 45 minutes. Station 87 and 105 located in the LA Basin provide HazMat back-up in keeping with the County Fire Department policy of dispatching 2 HazMat teams to accidents involving hazardous materials. New L.A. County Fire Department Firestation is proposed at the corner of Avenue P and 15th Street East. 2.7.4.2 Police Department Existing on-site Security Department and off site law enforcement agencies serve anticipated LADC Plant 1 0 facility needs. Law enforcement in the Antelope Valley is handled by the Los Angeles County Sheriff's Department at 1010 West Avenue J in Lancaster. Two hundred officers are assigned to this Sheriff Station with approximately 30 officers on patrol on a typical day. Response time to the LADC Plant 10 facility is 3 minutes. Sheriff Department has available personnel to service the existing community. There are no plans to either add to the facility, add another station or increase personnel. There are plans to develop additional facilities determined by the numb.er of service calls and response time to those calls. LADC Plant 10 has its own security department which provides plant protection services. Plant security has a staff of approximately 40 officers with 20 on a typical day shift and provides gate and building guards and roving patrol of the LADC premises. LA County Sheriff Department has worked closely with plant security in the past, however, Plant 10 security patrol calls to the Sheriff Station are infrequent. 2. 7 .4.3 Medical Services A wide range of emergency medical and medical services throughout the area serve LADC Plant 10. Medical services of all types have expanded throughout the Antelope Valley over the last few years and currently provide full service for medical needs. Four major hospitals are available, in addition to various clinics, care centers and convalescent hospitals. Largest regional hospital facility is the Antelope Valley Hospital Medical Center, a 261 bed full service hospital at 1600 West Avenue J in Lancaster. The facility will expand to 341 beds with completion of the fourth and fifth floors of a new tower. AVHMC emergency department serves as base station for LA County Paramedics and has the only active heliport. The medical center has a staff of about 260 physicians. 39 ---PAGE BREAK--- Palmdale Hospital Medical Center at 1212 East Avenue Sis a 123 bed facility utilizing 200 physicians with a staff of 300 employees and a fully staffed 24 hour emergency service. High Desert Hospital is 1 73 bed hospital at 44855 60th Street West offering general acute care services. The High Desert Hospital has a staff of 514 employees. Lancaster Community Hospital at 43830 10th Street West in Lancaster is a 132 bed facility having 300 physicians with a staff of 465 employees. The Lancaster Community Hospital offers 24 hour emergency care. A new 120-bed General Acute Care Hospital and Ambulatory Care Center is proposed on the northwest corner of Avenue P and Division Street West of Sierra Highway. The facility will be constructed on a 22.5 acre site, and will offer Emergency Medical Services equipped with a Helistop. COMMUNITY SERVICES : Source: City of Palmdale General Plan Public Services Element ND SCALE 40 ---PAGE BREAK--- 2. 7 .4.4 Schools There are dozens of public schools in the thirteen school districts available to residents of the Antelope Valley providing classes from kindergarten through Bachelor and Master Degrees in limited majors. Antelope Valley College at 30th Street West and Avenue K in Lancaster is part of the California Community College System. AVC offers Associates of Arts Degrees. Enrollment at AVC has reached 8,637 students. Many Colleges and Universities offer undergraduate and graduate degrees locally through satellite programs. Courses are held at the Rockwell facility in Palmdale, Antelope Valley High School and Edwards Air Force Base. Antelope Valley Union High School District includes six High Schools; two in Lancaster, two in Quartz Hill, one in Palmdale and one in Littlerock. High School enrollment is 9700 students. Enrollment is growing requiring the construction of approximately one school per year to 1995. Existing schools are accepting new students living in their district. Lancaster School District has 11 elementary schools offering classes from K through 6th grade and 2 Junior High Schools, 7th and 8th grades.· Enrollment is 10, 761 students and the schools are full. Some schools are using temporary classrooms. Schools are accepting new students living within their district. Palmdale School District (PSD) is an elementary school district serving residents in the City of Palmdale and designated areas of LA County. PSD consists of eighteen schools; thirteen K to 5th grade schools, one year round K to 7th grade, two sixth grade centers and two 7th through 8th grade Junior High (intermediate schools. Enrollment in the district is approximately 10,500 students. Over the past three years PSD has added several schools causing attendance boundaries to change to balance enrollment loads. The district owns eight additional sites and schools being planned for these sites and are in various stages of development approval. Schools are crowded and some are using temporary classrooms. All schools are accepting new students living within their attendance boundary areas. Free school bus transportation is provided throughout the Valley by the Antelope Valley Schools Transportation Agency. This service is provided students who may not safely walk to school or who may live beyond a reasonable walking distance from their designated school. In addition to the public schools, there are sixteen private schools serving the growing community, ten in Lancaster, five in Palmdale and one in Rosamond. Private school enrollment is approximately 4800 students. 41 ---PAGE BREAK--- LADC PLANT 10 .A • • LEGEND ELEMENTARY /INTERMEDIATE/JR HIGH HIGH SCHOOL COU£GE SCHOOLS ND SCALE Source: City of Palmdale General Plan Public Services Element 2. 7.4.5 Solid Waste Disposal Palmdale Disposal Company is under contract to the City of Palmdale to provide trash pick-up and disposal in Palmdale and is currently providing this service to LADC Plant 1 0 on an as needed basis. LADC owns the on-site roll-off containers and PDC provides for pick-up and disposal. PDC will increase its capacity to service Plant 1 0 as the plant develops. 42 ---PAGE BREAK--- EXISTING SITE & DEVELOPMENT PLANS Ill 43 ---PAGE BREAK--- 3.1 EXISTING SITE Origin.al Master Plan prepared in 1968 included 539 acre site, and envisioned a 1988 build out of 4,623,838 square feet. It divided the site into two main areas, industrial on the north portion and non- industrial on the south, separated by a utility core. Site has been developed in conformance with this concept. Major structures, including assembly, flight test hangars, paint structure, engine test area, aircraft parking areas, and related taxiw ay, were located north of the utility core. Dominant feature of the facility is Building 601, a high bay hangar of approximately 800,000 square feet and is a Valley landmark easily visible from a long distance served by a Souttiern Pacific Railroad spur. The larger structures (except buildings, # 636 and # 637) have direct access to the flight line providing access to Plant 42 taxi and runway. East/west utility spine located between Tristar Way and Avenue 0-5 includes the central utility plant for on-site underground utility services, including the power substation and two water reservoirs and pump stations. Employee cafeteria and general administration buildings occupy the west end of this core. The underground fuel storage yard is the eastern terminus. The 135.1 acre area south of Lockheed Way between 10th Street East and 15th Street East w as added at a later date and remains undeveloped. NO SCALE II LADC PLANT 10 539.0 ACRE S \.0Ci<)'1EEO f - ~1 ; I· ~ I ~I l~S.\ ACRES ~J - ; ~I ;II j ~ AVENUE p 44 - - ---PAGE BREAK--- 3.2 DEVELOPMENT PLAN 3.2.1 DESCRIPTION LADC is relocating all of its operations from Burbank to Palmdale. Two buildings #636 and #637, are complete. Additional major construction projects will support the Development Plan. This Specific Plan identifies proposed structures and their related functions, describes accessibility to flight line and parking, fixes general locations of structures and establishes development standards for landscaping/parking/fencing/signage/etc The Existing square feet of building area is programmed to expand by jll\1~@~~ square feet as part of the Development Plan. Employee intense functions will be located north of Lockheed Way and clear of the APZ-1 impact zone. The existing facility is based on a north/south flight line, with flight-orientated facilities north of Avenue 0-5. Support facilities, including the administration building, employee services and the central utility plant are in the east/west core, between Avenue 0-5 and Tristar Way. The Specific Plan continues the concept of fabrication, assembly and support facilities north of Avenue 0-5. Proposed new engineering, administration and nonflight-line support structures could be south of Avenue 0-5. Proposed new structures are located clear of the restrictive APZ zone for the USAF Plant 42 Runway 04/22. 45 ---PAGE BREAK--- 3.2.2 EXISTING BUILDINGS 601 FINAL ASSEMBLY HANGAR: Major sub-assemblies are mate to form complete aircraft bodies, wings are fabricated and installed, engines are installed, and aircraft interiors are outfitted. Four levels of office and manufacturing mezzanines flank the north and south sides of the main assembly floor. 602 FLIGHT TEST AND STRUCTURAL FATIGUE HANGAR: Divided into three sections; the North high-bay is used as a staging area for complete aircraft to ready them for flight tests, the building center section comprises four levels of offices, electronic labs and computer rooms, and the South high-bay is dedicated to special structural testing and flight test aircraft. 603 CENTRAL UTILITY PLANT: Electricity, steam, chilled water, vacuum and compressed air originate and distribute to the rest of the plant underground from this building. 604 MAINTENANCE BUILDING: Offices and workshops for maintenance. 605 WAREHOUSE: Salvage sales and maintenance support storage. 605T SALVAGE SALES OFFICE: Triple-wide trailer complex located near salvage sales storage area. Includes cash operations and salvage sales personnel. 606 MAINTENANCE BUILDING: Office and maintenance warehouse. 607 ADMINISTRATION: Office and lab. 608 ADMINISTRATION: Administration offices and flight simulation. 609 WAREHOUSE: Storage of miscellaneous small parts such as rivets, bolts fasteners, etc., and contains an ASRS (Automatic Storage Retrieval System). 610 PAINT HANGAR: New aircraft are painted in this facility. 610T ENGINEERING: Break area. 611 OFFICES: A office building housing engineering personnel. 612 FIREHOUSE: An alarm and radio dispatch center. 612T ENGINEERING: Storage 613 DOCUMENT DESTRUCT: Documents, paper and materials will be shredded and pulverized into dry pulp. 615 PUMP HOUSE: Contains pumps for fire protection reservoirs. 616 PUMP HOUSE: Same as 615. 617 GARAGE AND FUEL SERVICE: Services company vehicles and fuel trucks that service the flight line. Includes three 10,000 gallon and one 2,000 gallon underground storage tanks. 619 HAZMAT DISPENSING: New chemicals used in manufacturing process within 636 are dispensed in small quantities. Waste chemicals and solids are accumulated for transportation to disposal sites, to for site treatment facility. 46 ---PAGE BREAK--- 3.2.2 EXISTING BUILDINGS (cont'd) 620 through 624 FLIGHT LINE SERVICE: When aircraft are stationed on flight line for testing prior to final delivery, buildings serve as ground support offices for crew and mechanics. When a flight stall is not in use, they are not occupied. 625 PRODUCTION CONTROL: Offices for inventory control and production scheduling. 626 WAREHOUSE: Non-hazard storage 629 HAZMAT OFFICE: Office support for HAZMA T operations. 630 HAZMAT STORAGE: Contains non-hazardous storage and fire extinguishers. 630A HAZMAT STORAGE: Hazmat containers 631 through 635: same as 620 through 624. 636 NON-METALLICS FACILITY: Produce composite aircraft parts. Includes office and quality assurance test labs. Equipment includes autoclaves, ovens, presses, and spray-booths. 637 METALLIC FABRICATION CENTER: Large mills, lathes, saws, grinders, and various small tools used to machine steel, aluminum and titanium parts. 640 & 641 WAREHOUSE: Storage of maintenance supplies. 642 ENGINEERING: Sand blast booth. 643 ENGINEERING: LN2 Lab 644 WAREHOUSE: Storage of metal production, tooling, and raw materials used in fabrication processes. 646 TAILPIPE FACILITY: Assembly and re-work aircraft tailpipe assemblies. 650 through 654 WAREHOUSE: Storage of spare parts and tools. No assigned occupants. 655 FLIGHT LINE OFFICE: There is one acre underground fuel depot located between Ave 0-5 and Tristar Way on the East side of 10th Street East. Facility has five 50,000 gallon underground fuel storage tanks for Jet A and B fuel. The fuel is piped via 1 O" fiber reinforced pipe (FOP) to storage and dispensing facility at Building 617. Fuel is transported from this location to the flight line. 47 ---PAGE BREAK--- 3.2.2 EXISTING BUILDINGS (cont'd) Plant consists of It~ buildings comprising ~l\l~S.11.1® square feet. . Employee ratio on day shift, to area of occupied space is 1 per 1,281 square feet, reflecting non- typical personnel space ratios in the aircraft assembly and production operation. NORMAL OCCUPANCY OF BUILDINGS Revised Date fiWiMffiiR1fiM\11~9'4 BUILDING 601 ASSEMBLY 602 FLIGHT TEST HANGAR 603 CENTRAL UTILITY PLANT 604 MAINTENANCE 605 WAREHOUSE R~mt 606 MAINTENANCE 607 SUPPORT FUNCTIONS 608 ADMIN/FLIGHT SIMULATION 609 WAREHOUSE 61 0 PAINT HANGAR ~.;iit tmm~Ee;QgM 611 ADMINISTRATION 61 5 FIRE PUMP STATION 61 6 FIRE PUMP STATION 617 GARAGE & FUEL SERVICE 619 HAZMAT DISPENSING UNIT 620 FLIGHT LINE SERVICE 62 1 FLIGHT LINE SERVICE 622 FLIGHT LINE SERVICE 623 FLIGHT LINE SERVICE 624 FLIGHT LINE SERVICE 625 PRODUCTION CONTROL g:g~ H1:t~~lf!Ig£.tf:Rt!i~ 629 HAZMAT 0.f.fHCE lil~ 631 FLIGHT LINE SERVICE 632 FLIGHT LINE SERVICE 633 FLIGHT LINE SERVICE 634 FLIGHT LINE SERVICE 635 FLIGHT LINE SERVICE 636 NON-METALLICS FACILITY 637 FABRICATION 640 WAREHOUSE 641 WAREHOUSE I ~-r~tN~m~mm 644 TOOL STORAGE 650 WAREHOUSE 65 1 WAREHOUSE 652 WAREHOUSE 653 WAREHOUSE 654 WAREHOUSE 655 FLIGHT LINE OFFICE S.S. = SPECIAL SUPPORT TYPE GROSS SF MFG S.S. S.S. S.S. WHSE S.S. OFF. OFF/S.S. WHSE S.S. O'.Ff:i S.S. wa:gg S.S. S.S. MFG. S.S. S.S. S.S. S.S. S.S. S.S. MFG t?!ft~i Of:E, W.H$o S.S. S.S. S.S. S.S. S.S. MFG MFG WHSE WHSE 11~1: WHSE Mi§:~ WHSE WHSE WHSE WHSE WHSE OFF. 48 260,403 llt!ft~ 13,586 ilf:il,~~ 5,760 8,364 il~lll :I 6,280 3, 175 3,617 i~I~~ 1 ,801 imgg g~§QQ 3,794 I 2,400 1, 152 2,400 1, 152 2,400 760 • 22,400 22,400 22,400 22,400 22,400 7,080 2'\lg~M3.72 NORMAL OCCUPANCY ---PAGE BREAK--- EXISTING BUILDING AREA ANALYSIS BLDG BUILDING OFFICE MFG/AS SM WHSE S.S. GROSS SF 601 ASSEMBLY 107 941 355 017 199 594 193 039 855 591 602 FLIGHT TEST HANGAR 88149 137 976 34 278 260 403 603 CENTRAL UTILITY PLANT 363 27 340 27 703 604 MAINTENANCE 2 904 6 886 3 400 396 13 586 605 WAREHOUSE 69 12 527 204 12 800 605T SALVAGE SALES 350 350 606 MAINTENANCE 1 039 2184 2 122 415 5 760 607 SUPPORT FUNCTIONS 3 497 4 036 831 8 364 608 ADM/FLIGHT SIMULATION 40 123 8 738 14 831 63 692 609 WAREHOUSE 2 500 8 477 212 11 189 610 PAINT HANGAR 1 279 62 752 2 804 66 835 610T LUNCH ROOM 630 630 611 ADMINISTRATION 191 320 33 680 225 000 612 PLANT PROTECTION 3 726 1 640 914 6 280 612T WAREHOUSE 480 480 613 DOCUMENT DESTRUCT 1 300 5 400 900 7 600 615 FIRE PUMP STATION 3175 3 175 616 FIRE PUMP STATION 3 617 3 617 617 GARAGE & FUEL SERVICE 854 5 640 854 625 7 973 619 HAZMA T DISPENSING UNIT 2400 2 400 620 FLIGHT LINE SERVICE 1 409 392 1 801 621 FLIGHT LINE SERVICE 2 208 392 2 600 622 MECHANICAL TEST LAB 2 208 392 2 600 623 FLIGHT LINE SERVICE 2 520 80 2 600 624 FLIGHT LINE SERVICE 2 208 392 2 600 625 PHODUCTION CONTROL 3 604 190 3 794 626 HAZMAT STORAGE 1 836 1 836 629 HAZIMA T OFFICE 1 991 419 2 41 0 630 HAZMAT STORAGE 4 133 4 133 630A HAZMAT STORAGE 1 885 1 885 631 FLIGHT LINE SERVICE 2 400 2 400 632 FLIGHT LINE SERVICE 11 52 1 152 633 FLIGHT LINE SERVICE 2 400 2 400 634 FLIGHT LINE SERVICE 1 152 1 152 635 FLIGHT LINE SERVICE 800 400 1 200 2 400 636 NON-METALLICS FACILITY 20 226 134 757 1 811 39 606 196 400 637 FABRICATION 9 483 150 083 11 171 35 997 206 734 640 WAREHOUSE 760 760 641 WAREHOUSE 320 320 642 SAND BLAST BOOTH 360 360 643 LOX/LN2 1 200 1 200 644 TOOL STORAGE 25 200 25 200 646 TAILPIPE FACILITY 1 146 24 340 5141 30 627 650 WAREHOUSE 22400 22 400 651 WAREHOUSE 22 400 22 400 652 WAREHOUSE 22 400 22 400 653 WAREHOUSE 22 400 22 400 654 WAREHOUSE 22 400 22400 nee ~I 1~\.IT I IN~ ncr:1rc A 00. OAA 7 non TOTALS 4'1~ RQ4 391 ~7A 401 4Q8 2.19<1.872 49 ---PAGE BREAK--- 3.2.3. DEVELOPMENT PLAN 604A WOODSHOP CONSOLIDATION: Wood cutting and shipping box fabrication. 607A ENGINEERING: First aid station, Aero Lab and VMS Lab. 607B ENGINEERING: Iron Bird prototype. 611A ENGINEERING: Administration, engineering office support. 614 SCRUBBER: Clean emission controls. 636B FABRICATION EXPANSION: Future production may require expansion to the existing Non- Metallics Facility, functions being similar to those in building 636. 637B FABRICATION EXPANSION: As future production dictate, various metallic fabrication functions will be relocated from building 601 into building 6378. 639 OFFICE BUILDING: Administration offices and Engineering. 644A WAREHOUSE: Inactive tooling and raw materials storage. 645 HAZMAT STORAGE: New chemicals used in manufacturing processes will be delivered/stored prior to disposition. Additionally, hazardous waste will be accumulated prior to transportation to disposal area. 647 ENGINE TEST: Aircraft engine testing. Generated noise will be suppressed through sound baffling and "HUSH HOUSE" construction. 648 WAREHOUSE: "Inactive" materials storage. 649 WAREHOUSE: Central shipping and receiving warehouse for Plant 10, including raw materials, aircraft components, and electronic parts storage. 658 STORAGE BUILDING: Manufacturing project tooling storage. 656 FURNITURE STORAGE: Office furniture warehouse. 50 ---PAGE BREAK--- 3.2.3. DEVELOPMENT PLAN (cont'd) NORMAL OCCUPANCY OF BUILDINGS Revised Date !llB~!i\~j~j[f,;fii!~'!1~ NO BUILDING 604A WOODSHOP CONSOLIDATE ~r~1.I ~ffil,ff: SCRUBBER 636B FABRICATION EXPANSION 637B FABRICATION EXPANSION 639 ADMINISTRATION 644A STORAGE 645 HAZMAT STORAGE 647 ENGINE TEST 648 SECURED STORAGE 649 U/42 WAREHOUSE 656 FURNITURE STORAGE 658 STORAGE SUB-TOTAL EXISTING TYPE MFG. ~Ill~! ~111!:4:) 111:1: S.S. MFG. MFG. OFF. WHSE S.S. S.S. WHSE WHSE WHSE WHSE 51 GROSS SF 10,000 ffi~ 1i!~2 19J ~f~~[l~t911 fl;¥.1£itf.P.1g 22,000 214,000 140,000 20,000 13,000 40,000 250,000 i:w:;i~ 1~1: ]ii! 3,097,205 DAY SWING GRAVE 20 200 33 0 [fu[(lf5 15 mg 10 2 3 00 25 30 1,247 !lii!li;I 100 95 15 3 100 15 358 :z1· 1!:1 95 15 115 ~!ii ---PAGE BREAK--- 3.2.4 EXISTING PARKING At Plant 10 LADC will perform the Engineering, Manufacturing and Testing of aircraft prototypes which require a variety of building sizes, uses and personnel densities. Some structures are very large with few personnel assigned, other buildings accommodate temporary personnel, some buildings have no assigned personnel and a few have the typical office/industrial environment. These non-typical conditions make it appropriate to apply special parking criteria under the Specific Plan. Existing Plant 1 0 is secured by fencing with vehicle and pedestrian access through guard gates. Included is parking lot 19 which is located outside the secured fence and can be used for car pool parking providing a total of 3,315 existing parking spaces. 52 ---PAGE BREAK--- EXISTING PARKING REQUIREMENTS NO. BUILDING OFFICE LAB MFG S.S. WHSE GROSS SF REQ PA ~ 601 ASSEMBLY 107,941 82,500 272,517 193,039 199,594 855,591 925 602 FLIGHT TEST HANGAR 88, 149 137,976 34,278 260.403 475 603 CENTRAL UTILITY PLANT 363 27,340 27,703 6 604 MAINTENANCE 2,904 6.886 396 3.400 13,586 19 605 WAREHOUSE 69 204 12,527 12,800 1 605T SALVAGE SALES 350 350 1 606 LERC EMPLOYEE REC. 1.039 2,184 415 2, 122 5,760 6 607 SUPPORT FUNCTIONS 3,497 4,036 831 8,364 18 608 ADM/FLIGHT SIMULATION 40, 123 8,738 14,831 63,692 192 609 WAREHOUSE 2,500 212 8.477 11.189 11 610 PAINT HANGAR 1,279 6,670 56,082 2,804 66,835 84 610T LUNCH ROOM 630 630 0 611 ADMINISTRATION 191,320 33,680 225,000 772 612 PLANT PROTECTION 3,726 1,640 914 6,280 17 612T WAREHOUSE 480 480 0 613 DOCUMENT DESTRUCT 1,300 5,400 900 7,600 10 615 FIRE PUMP STATION 3, 175 3, 175 1 616 FIRE PUMP STATION 3,617 3,617 1 617 GARAGE & FUEL SERVICE 854 5,640 625 854 7,973 9 619 HAZMAT DISPENSING 2,400 2.400 2 620 FLIGHT LINE SERVICE 1.409 392 1,801 1 621 FLIGHT LINE SERVICE 2,208 392 2,600 2 622 MECHANICAL TEST LAB 2,208 392 2,600 7 623 FLIGHT LINE SERVICE 2,520 BO 2,600 B 624 FLIGHT LINE SERVICE 392 2,208 2,600 0 625 PRODUCTION CONTROL 3,604 190 3,794 12 626 HAZMAT STORAGE 1,836 1,836 0 629 HAZMA T OFFICE 1,991 419 2.410 B 630 HAZMA T STORAGE 4,133 4,133 0 630A HAZMA T STORAGE 1,885 1,885 0 631 FLIGHT LINE SERVICE 2.400 2,400 0 632 FLIGHT LINE SERVICE 1, 152 1.152 1 633 FLIGHT LINE SERVICE 2,400 2.400 B 634 FLIGHT LINE SERVICE 1, 152 1, 152 4 635 FLIGHT LINE SERVICE 800 400 1,200 2.400 3 636 NON-METALLICS FACILITY 20,226 16,869 117,BBB 39,606 1,811 196,400 252 637 FABRICATION 9.483 1,054 149,029 35,997 11, 171 206,734 170 640 WAREHOUSE 760 760 0 641 WAREHOUSE 320 320 0 642 SAND BLAST SOOTH 360 360 0 643 LOX/LN2 1,200 1,200 1 644 TOOL STORAGE 25,200 25,200 2 646 TAILPIPE FACILITY 1, 146 24,340 5,141 30,627 30 650 WAREHOUSE 22.400 22.400 2 651 WAREHOUSE 22.400 22.400 2 652 WAREHOUSE 22.400 22.400 2 653 WAREHOUSE 22.400 22.400 2 654 WAREHOUSE 22,400 22,400 2 655 FLIGHT LINE OFFICE 6,834 246 7,080 27 TOTALS 485,894 130,115 790, 787 401.498 391,578 2, 199,872 3,096 53 ---PAGE BREAK--- 3.2.5 DEVELOPMENT PARKING PLAN 4, 751 future parking spaces to be provided in designated parking lots 23-36 for a total of 8,066 spaces. Most of the parking will be located inside the fenced facility within 500 feet of the assigned building. The additional parking is provided by revising some existing lots and adding new lots. DEVELOPMENT PARKING PLAN REQUIREMENTS NO GROSS SF MFG OFFICE WHSE S.S. SHIFT REQ 1 PRKG 604A 10,000 10,000 20 10 607A 11,000 11,000 44 6078 15,000 15,000 60 61 lA 75,000 75,000 200 300 614 22,000 22,000 4 6368 214,000 204,000 10,000 [PHONE REDACTED] 140,000 116,000 24,000 330 202 639 19,800 19,800 79 644A 20,000 20,000 15 2 645 23,265 23,265 10 2 647 13,000 13,000 10 3 648 40,000 40,000 2 3 649 250,000 250,000 300 13 656 21,468 21,468 25 2 658 22,800 22,800 30 2 SUB-TOTAL 897,333 330,000 145,800 377,533 35,000 1, 143 908 2, 199,872 920,902 485,894 391,578 401,498 2,691 1,422 TOTAL 3,097,205 1,250,902 631,694 769, 111 436,498 3,834 2,330 54 ---PAGE BREAK--- 8 Cl \ \ \ \ Cl 334 000 1~'6-4) "4\VU:.-1 C> C) ~ l~\1-•3 I LEGEND EXISTING ROADS • • • PROPOSED ROADS - ADD!T!ONAL 8 0 ~ II I D • 0 0 0 I n ru /LJll ~ I - EXISTING BUIL DEVELOPMENT PLAN 4' . 8 0 0 0 0 0 ~ ~ 111 N OUTDOOR \IJ I II l!t.. l!!lll64t~ II II II L. A. D. C. PLANT 10 SPECIFIC PALMDALE, PLAN CALIFORNIA -1 _J ROADS & PARKING EXISTING LOT SPACES l 96 IA 114 2 6 3 H 4 75 5 u 6 92 7 23 B :l 9 23 10 64 II 32 12 38 13 -460 14 1:19 15 1oe 16 12 17 uo 18 252 19 167 20 54 21 384 22 64 TOTAL 3315 FUTURE LOT SPACES 23 618 24 750 2:1 9:1:1 26 7:lS 27 252 29 14-1 29 144 30 192 31 144 32 115 33 34 47 35 186 36 Wi TOTAL 4751 SITE TOTALS 8066 @ O' 200' 400' 600' ---PAGE BREAK--- 3.2.6 EXISTING LANDSCAPE Landscaping on the improved portion of Plant 10 consists of partial peripheral row of trees. This Cupressus Glabra (smooth Arizona Cypress) is an excellent high desert, drought resistant, fast growing evergreen wind break or tall screen. Some street and sidewalk trees have been installed in the area south of the new buildings 636 & 637. The balance of the nearly level 360 acre building pad is not landscaped and has no significant natural growth with the exception of some native Joshua Trees. The undeveloped portions of the site could be classified as moderately disturbed Joshua Tree Woodland/Mojave Desert Scrub Plant community. 3.2.7 DEVELOPMENT LANDSCAPE PLAN 3 2. 7 .1 Inside Perimeter Fence o No landscaping will be provided at parking lots, sturcture entrances, yard areas or streets. o Rock & gravel will be used as ground cover. o Existing wind break tree tows along the west property line and along Lockheed Way will remain. o Existing landscaping may be changed provided that a minor modification to the original project case is filed. 3.2.7.2 Outside Perimeter Fence o A 20' wide buffer strip will be provided from the north edge of the Lockheed Way right- of-way to the perimeter fence, between west property line and 15th Street East. Exception: where structures and parking occur outside of the perimeter fence line o Landscaping for structures and parking outside of the perimeter fence line along Lockheed Way will be in accordance with the City of Palmdale Zoning Ordinance Standards. o Landscaping in buffer strip along Lockheed Way will consist of existing tree row, rock/gravel ground cover and Joshua Trees (at 35'-0" O.C.) spacing. 56 ---PAGE BREAK--- (J1 0 0 0 334 000 I I I 1: SPCC-1 12-i?l-'l 0 0 0 Vi N 0 0 0 LJI~ T20 T22 =c 622 63 T23 0 0 0 M If') N 0 0 0 0 0 0 0 0 0 If') If') N OUTDOOR STOfll\GE 649 ~ 62'.i 0 LEGEND ' ' EXISTING I M LL.11 111 LEGEND ~11111 EXISTING PROPOSED Il l -1 _J EXISTING BUILDINGS 11 DE VELOPMENT PLAN BUILDINGS 0 0 0 0 0 0 0 0 0 If) C\J OUTDOOR E 14 11 CCICKH' L. A. D. c. PLANT 10 SPECIFIC PLAN ® PALMDALE, CAL IFORNIA O' 200' 400' 600' FIRE PROTE CTION ---PAGE BREAK--- 3.2.16 EXISTING POWER SYSTEM Power is supplied to the site by Southern California Edison (SCE) through two separate overhead 66KV feeders to the main 14 MV A, 66KV primary and a 12 KV secondary substation named Helijet. Helijet is fed overhead by a 66KV feeder along the 25' SCE easement paralleling 8th Street East then east along Tristar Way. The other feeder provides two-66 KV overhead transmission lines (Lancaster Helijet and Anaverde Helijet) paralleling 10th Street East then west along Tristar Way to the substation. SCE can switch the source of the second feed at 14th Street and Avenue P. Two main feeders are part of a loop system giving the Plant 1 0 substation two sources of power should one leg of the loop be out of service. In addition to these two sources, the SCE substation at 40th Street East and A venue P can switch the power source on the east leg thereby providing a third source of power to the Plant. Secondary 1 2kV substation consists of four 12kV circuits, designated TAWNA, TRIST AR, DEBRA and AIRBUS. TAWNA and AIRBUS both loop the facility. DEBRA feeds Building 636 and TRISTAR feeds Building 637. A 1 2kV substation distributes power underground at 1 2kV to existing on-site substations where the power is transformed and distributed to the user as required. The basic east/west main runs on the south side of the Utility Spline, Tristar Way. All existing main duct banks have at least four spare 5" conduits and all auxiliary duct banks have at least one spare conduit. Existing on-site distribution system is adequately serving the facility. 3.2.17 DEVELOPMENT PLAN POWER SYSTEM When Buildings 636, 637 and 611 become fully operational, the present capacity of the Plant 10 Central Plant Building 603 to provide adequate chilled water will be exceeded. A new 90,000 MBH HPS Boiler, 1000 Ton Chiller and four 4000 CFM compressors are scheduled for installation as the need occurs. Peak demand on August 9th 1990 was 10,352 KW or approximately 12.5 MVA indicating the current 14MVA rating of the existing transformer will be exceeded with planned additional loads. A new 14 M VA transformer has been scheduled for installation and should be operation in early 1992. This new transformer will double the capacity of the substation. Substation had two 14 MVA transformers at one time and is already equipped to accommodate the second unit. Increasing the substation and should be operation in early 1992. This new transformer will double the capacity of the substation. Four existing 12 Kv breakers have sufficient capacity to feed the projected load. On the west side of Plant 10, the only duct bank and cable additions required will be extensions from the existing loop to the new buildings. On the east side of Plant 10, a new duct bank will be added to allow SCE circuits DEBRA and TRI STAR to loop the east side. DEBRA and TRISTAR will provide power to all future buildings on the east side. Power distribution will be via the new 12 Kv power duct banks which have the same construction as the existing 12 Kv duct banks. The 12 Kv will be transformed as required at each building. 70 ---PAGE BREAK--- Existing 14 MVA substation will be upgraded to a 28 MVA capacity as required. This new capacity will be adequate for all service needs. Development projected kilowatt Demand growth is shown in the tables. Electric distribution will be an extension of the on-site 12 kV underground system with power transformed at each building as required. PROJECTED KILOWATT DEMAND GROWTH BUILDING AREA SO.FT. W/SF KW 603A CENTRAL PLANT EXPANSION 14,000 70 980 604A MAINTENANCE EXPANSION 10,000 10 130 611 ENGINEERING 225,000 3 675 611A ENGINEERING ADDITION 75,000 3 225 613 DOCUMENT DESTRUCT 7,600 3 23 629A OFFICE 2,850 3 9 630 HAZMAT STORAGE 4,000 3 12 636A OFFICE AREA 17, 100 10 51 637A FAB. EXPANSION 72,000 16 1, 152 645 HAZMAT STORAGE 25, 150 3 75 646 TAILPIPE FACILITY 20,000 6 120 647 ENGINE TEST 13,000 6 80 636B FABRICATION EXPANSION 214,000 16 3,450 637B FABRICATION EXPANSION 140,000 16 2,240 639 ADMINISTRATION 53,200 10 590 648 SECURED STORAGE 40,000 2 80 649 U/42 WAREHOUSE 250,000 2 500 658 TRUCK GARAGE, FUEL SERVICE 22,800 4 90 656 FURNITURE STORAGE 40,000 2 80 626 SCRUBBER 22,000 3 70 644A STORAGE 25,000 2 50 U/12 CREDIT UNION 13,200 10 110 PLANT 10 PROJECTED KILOWATT DEMAND GROWTH - SUMMARY KW ADDITION EXISTING DEVELOPMENT PLAN Using August 1990 Peak of 10,352 Assuming 0.8 Power Factor TOTAL ADD 3,491 6,350 PLANT 10 ill 4,837 21,000 71 PLANT 10 MVA 35,783 52,639 17.3 26.4 ---PAGE BREAK--- ~ 0 0 0 334 000 SPEC-I li!-22-'2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 iii ru II I ru N ru N OUTDOOR STD~ME 6<4'3 ~ lib lJL 1 ~ 1 l.S . . " . . 0~ _r · . I ' ' ' ' ?C ~ ; I ( _ 1111 11111111 - ¥ LEGt..NU ¥ EXISTING l2KV DUCf PROPOSED 12KV DUCT EXISTING 66KV OVERHEAD D - EXISTING BUILDINGS DE VELOPMENT PLAN BUILDINGS ~ L. A. D. C. PLANT 10 -==rr ] _J SPECIFIC PALMDAL[ PL AN CALIFORNIA PD\./ER @ O' 200' 400' 600' . - w ---PAGE BREAK--- 3.2.18 EXISTING COMMUNICATIONS SYSTEMS Telephone service to the site is provided by Pacific Bell via underground conduit from manhole #11 near 10th Street East and Lockheed Way to manhole #5 at Tristar W~y then west along Tristar Way to various points of service to the facility. The north/south branch at manhole #3 contains one 1800 pair cable and serves all existing structures north of Building 601. Building 601 and those south of 601 are served by similar capacity branches from manholes #1 and The branch from manhole #4 is servicing Building #636 and a new branch is servicing new Building #637. Basic communication system runs east/west on the south side of the utility spline on Tristar Way. Underground communication ducts are 3-1 conduits and there is a limited number of spare ducts available paralleling Tristar Way. Main north/south duct bank from manhole #3 at 8th Street East and Tristar Way has no spares. Current data transmission by fibre optics is only within Buildings #601 and #608. 3.2.19 DEVELOPMENT PLAN COMMUNICATIONS SYSTEMS Telephone service will continue to be provided by Pacific Bell. As new buildings are added, the telephone requirements of each building will be provided by Pacific Bell to saturation of the capacity available on the two existing 1 800 pair cables. Current Utilization exceeds 50%. An additional cable will have to be added at some point during the expansion of Plant 1 O. A new data transmission system using fiber optics could interconnect Buildings 601, 602, 608, 611, 636, and 646. New main communications duck bank will handle telephone service and transmission of data. However, the data ducts must not terminate in the same manhole as the telephone ducts. Two types of ducts, 4" rigid galvanized street and 4" PVC, will be used. New system will provide for all communications requirements for Plant 10 expansion scheduled through the year 1995. Telephone service will continue to be provided by Pacific Bell. As new building are added, the telephone requirements of each building will be provided by Pacific Bell to saturation of the capacity available on the two existing 1 800 pair cables. An additional cable will have to be added at some point during the development and expansion of Plant 10. The communications distribution is shown. A new data transmission system using fiber optics could interconnect the following Buildings: 601, 602, 608, 611, 636, 646 637B and 638/639. New main communications duct bank will handle telephone service and transmission of unclassified data and classified data. However, the data ducts must not terminate in the same manhole as the telephone ducts. Two types of ducts, 4" rigid galvanized steel and 4" PVC ducts will be used. New duct system will provide for all the communications requirements of the Plant 10 expansion scheduled through the year 2000. 73 ---PAGE BREAK--- 0 0 0 ~ 334 000 SPEC·I 1l-a2-9l 0 0 0 0 0 0 0 C> 0 0 0 0 0 0 0 0 0 0 If) in II I M If) If) If) ru OUTDOOR ST0~/\1$E 649 ~ 1~ . ' ' ' ' l ! ' ' n ' ' iJ\'~ I M H' [ 4 j I JI, 1 ~ I ~ ri IJAY ( n- LEGEND EXISTING 0 PROPOSED 0 PULL BOX MANHOLE D • EXISTING BUILDINGS DEVELOPMENT PLAN BUILDINGS L. A. D. C. PLANT 10 SPECIFIC PALMDALE, PLAN CALIFORNIA _J COMMUNICATIONS @ O' 200' 400' 600' - WWW ---PAGE BREAK--- 3.2.20 EXISTING SEWER SYSTEM LA County Sew er District # 20 is servicing Plant 1 0 by an existing 1 2" trunk line on Lockheed Way from Sierra Highway to 10th St. East increasing to a 21" VCP trunk sewer line from 10th St. East to 15th St. East located 25' north of the center line of Lockheed Way. Trunk line increases to 24" at 15th St. East and continues south on 15th St. East to Avenue P. An 18" trunk sewer coming from the south on 15th St. East joins the 24" trunk at the intersection of Avenue P then continues east on Avenue P, then south on 25th St. East and East on Avenue P-8 to the Sewer Disposal Plant/Palmdale Water Reclamation Plant (WRP) located between 30th and 35th Streets East on Avenue P-8. On-site sewage distribution is via a system of pipe from a 4" VCP branch to the 15" VCP main connecting with the 21" main in Lockheed Way. Due to generally flat terrain it has been necessary to provide three lift stations in the system, one near flight line Bldg. 622, one at the southeast corner of Bldg. 610 and one on the east side of Bldg. 602. Existing sewer system is adequate to handle imposed loads, however, the Palmdale WRP, located at 39300 30th Street East, is currently near treatment capacity. Districts are planning an expansion which will meet the future demand on the District No. 20 sewerage system. 3.2.21 DEVELOPMENT PILAN SEWER SYSTEM LA County Sewer District No. 20 provides and maintains existing 21" VCP main serving Plant 10 site. A 15" on-site main connects with the 21" line at the intersection of 10th St. East and Avenue P. Existing system is adequately sized to handle effluent loads generated by proposed bldg. expansion program. Existing on-site collection system could be extended and sized as required to accommodate all buildings as they are constructed. Existing gradients throughout the area may make it necessary to continue the system of providing sewer lift stations at certain locations to prevent excessive sewer excavation depths. These lift station locations are shown. Existing and future demand load estimates for the sewer effluent for the site are shown. BUILDINGS EXISTING DEVELOPMENT PLAN TOTALS PLANT 10 - SEWER MAXIMUM DEMAND SERVICE REQUIREMENTS SO. FT. ~~:111111 ~t'i!Zi4!~ TOTAL GPO 81 , 130 156,080 227,210 Source: Sewer, Steam, Gas Compressed Air Study for Lockheed David A. Lowe and Assoc., Aug. 1992 Based on a 20 hour/day flow and a 2.5 peak load factor, the peak load demand is 1.00 CF/SEC. At this flow, the system is operating at approximately 36% capacity. Existing 15" VCP main outfall sewer line for the site is capable of carrying the total project sewer demand including the existing and projected future buildings as shown on the master plan Sewer discharge system is an extension of the existing system with north/south mains as collectors for service connections to each new building. 75 ---PAGE BREAK--- 0 0 0 334 000 l \ 11 S:P£C-1 12-22-92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 " If) II I If) If) If) If) ru ru OUTDOOR STD!i!ME ~ T23 ·tr LEGEND ·116 I 10 2 EXISTING D LIFT STATION L. A. D. c. PLANT PROPOSED 0 MANHOLE SPECIFIC PLAN @ _J PALMDALE, CALIFORNIA D EXISTING BUILDINGS 111 O' 200' 400' 6 00' • DE VELOPMENT PLAN 111 BUILDINGS I SE \JER ---PAGE BREAK--- 3.2.22 EXISTING NATURAL GAS Southern California Gas Company (SCG) supplies fuel gas to Plant 1 0 from a 4" 30 Psig service line from the SCG 1 O" 400 Psig main located in Lockheed Way. This 1 O" main runs east/west along Lockheed Way from Sierra Highway to 10th Street East then turns south along 10th Street East to Avenue P. This 1 O" main also turns north at the west property line and exterior to a point of service to Building 604. A 4 " high pressure branch extends east along Lockheed Way to 15th Street East where it turns north into USAF Plant 42. Building 604 is currently served by a separate 2-1 line from the 1 O" main along Sierra Highway. Existing gas service is limited to a few buildings. The present 30 Psig service to the buildings is reduced in pressure as required at each building. Each building is also metered separately by SCE. Existing gas service to Plant 10 is adequate. Aviation and vehicle fuel (gas) is stored underground in five - 50,000 gal. tanks, three - 10,000 gal. tanks and one - 2,000 gal. tank in the tank farm located in the north east corner of 10th Street East and Tristar Way. Aviation fuel is currently piped to Building 61 7 where flight line gas trucks are refilled as needed or it is trucked directly from the tank farm to the flight line requiring ingress and egress through security control. 3.2.23 DEVELOPMENT PLAN NATURAL GAS Southern California Gas Company will continue to provide natural gas to Plant 10. Gas is currently supplied from a 1 O" 400 Psig high pressure main located in 10th Street East and Lockheed Way west of 10th Street. This 1 O" line turns north along the LADC West property line and provides a 2-1 existing connection to Building 604. There is also 4" on site main service line which connects with the off-site system at 10th Street East and Lockheed Way. A new 4" service main will extend east along Tristar Way through north along the new North/South internal road to service Buildings 637A & 613 and a 4" stub-out ·will be provided for service to Buildings 645, 646 and 647 as required. Existing service is adequate and gas distribution at 30 Psig as will be via 4" mains along new road patterns with stub-outs sized as required to service building functions. Each building will be metered separately. Additional gas service to three buildings is projected in the Phase II development program. Existing service is adequate and gas distribution will be via 4" mains along new road patterns with stub-outs sized as required to service each Building function. Each building will be metered separately. Existing service and pressure is adequate to service the Development Plan. 77 ---PAGE BREAK--- CD 0 0 0 0 g CV 334 000 SPCC-l 12-l~,2 0 0 0 4-JI 602 ll ~ II D • g 0 P= If) T20 01 620 6 T21 c:J I c:J - 622 63 T23 = c:J 623 631 0 0 0 If) 0 0 C) 649 OUTDOOR STD!Rl\1$E C) C) C) 4 c=J ' ·r~~1r 7 ii I LEGEND .c EXJSTING 0 , I L. A. D. c. PLANT 10 PROPOSED II ::Jf SPECIFIC PLAN _J PALMDALE, CALIFORNIA EXJST!NG I DEVELOPMENT PLAN 10 fl I GAS BUILDINGS ® O' 200' 400' 600' ---PAGE BREAK--- 3.2.24 EXISTING COMPRESSED AIR SYSTEM Compressed Air is distributed throughout the site as part of the underground concrete duct bank with access vaults located at the duct system intersections. Compressed air is supplied from the Central Energy Services Plant, Building # 603, at 110 psig to 120 psig. Compressed air terminates and is available at the various buildings indicated. Pressure is reduced within each building as required by the user. Compressed air is purchased from the Central Energy Plant by LADC on a metered basis. 3.2.25 DEVELOPMENT PLAN COMPRESSED AIR SYSTEM Existing compressed air demand load of 45,600 CFM could be increased by 38,300 CFM. Existing 12" service main and existing distribution piping is adequate to service the existing as well as future. Existing compressed air system could be extended in the typical on-site Duct Bank configuration to service buildings as required. It will be necessary during buildout to expand the Central Plant's compressed air capacity from its present 16,000 CFM to 32,000 CFM by the addition of four new 4000 CFM air compressors. These compressors can be accommodated in the present Central Plant configuration. Existing duct bank system will be extended eastward on the north side of Avenue 0-5 from its present termination point south of Building 637 then will turn north on the east side of the new north/south internal road. This 6" compressed air (CA) main terminates just north of Building 613 providing for 2" and 4" service connections to future buildings as required. Existing compressed air system will be extended in the typical on-site duct bank configuration to service new buildings as required. It will be necessary during buildout to again expand the Central Plant's compressed air capacity from its proposed 32,000 CFM by the addition of new 4000 CFM air compressors and dryers as required to accommodate the demand load of 26,500 CFM. These compressors can be accommodated in the present Central Plant expansion. Existing and future demand load estimates for the site compressed air system are shown. COMPRESSED AIR DEMAND LOADS BUILDINGS SERVICED EXISTING DEVELOPMENT PLAN TOTAL FULL LOADING 45,600 CFM 38,300 CFM 83,900 CFM NOTE: Assume 50% diversity • 41 ,950 CfM DEMAND LOAD 5 FACTOR 22,800 CFM 19, 150 CFM 41,950 CFM Existing duct bank system will be extended north from its present termination point north of Building 613 to service new buildings in the northwest section. The 1 O" north/south main in the way of Building 636B expansion will be relocated to parallel the extension of 10th Street East and reconnect with the existing 10" line north of this building. Six inch main will extend east past north of Building 637 B to provide service to this building and Buildings 644A and 648. 79 ---PAGE BREAK--- Q§ 0 0 0 0 334 000 \ \ \l SPEC-1 12-22-92 0 0 0 0 0 0 in II If) C\J I D m 0 0 0 0 0 0 I C"l If) If) C\J V> LEGEND 0 EXISTING -11111 I PROPOSED Ill J EXISTING BUILDINGS 111 DEV ELOPMENT PLAN Ill BUILDINGS I 0 0 0 0 0 0 If) If) C\J OUTDOOR STDIRME 649 L. A. D. c. PLANT 10 SPECIFIC PLAN ® PALMDALE) CALIFORNIA O' 200' 400' 600' AIR ---PAGE BREAK--- 3.2.26 EXISTING STEAM SYSTEM Steam supply and condensate system is distributed throughout the site in the same underground duct bank as the compressed air and chilled water. Present steam demand is 90% comfort and 10% process load. High pressure steam is served at 110 psig to 120 psig from the Central Energy Services Plant, Building 603, and terminates at the various buildings. Steam pressure is reduced at the buildings as required for comfort heating and process requirements. Steam is purchased from the Central Energy Plant by LADC on a metered basis. 3 .2.27 DEVELOPMENT PLAN STEAM SYSTEM High pressure steam and condensate return system is distributed on site through the typical duct bank system. Existing demand load of 60,365 LBS/HR is increased by 32,900 LBS/HR in the development program. Existing Central Plant capacity is 150,000 LBS/HR with both boilers operating and is adequate to service future expansion. Existing and future demand load estimates for the site steam system are shown. BUILDINGS EXISTING DEVELOPMENT PLAN TOTAL STEAM DEMAND LOAD PERSONS 7;.~g TOTAL-LBS/HR 53, 115 41, 150 94,265 Based on a central plant building diversity load factor of 75%, the site demand load will be approximately 70,000 LBS/HR at 120 Psig. Existing central energy plant high pressure steam boiler capability is 150,000 LBS/HR with both boilers operating. With an estimated demand diversity load of 70,000' LBS/HR, the present plant can supply adequate steam to service the existing and future demand loads. High pressure steam and condensate return system will be distributed in the same duct bank as the compressed air system with the 12" distribution main running north from a point in front of Building 613 to Building 649. Stub-outs will be sized and provided to all new buildings requiring service. A new 8" service will be provided to Building 638/639 from the 12" main in Tristar Way. New service will be provided to Building 648 and 644A and 6378 off the 12" the east/west main north of Building 6378. New 3" service will be provided to Building 639. Chilled Water Chilled water supply and return system is also supplied and distributed from the Central Energy Services Plant in the same under ground duct bank as the compressed air and steam. 81 ---PAGE BREAK--- ~ N 0 0 0 0 0 0 0 0 0 iii ru ru ru 334 000 I I 11 SPEC-I 12-Z:t·'~ II tol I .c a> D - 0 0 0 0 0 0 I ru ru I- LEGEND V> ~ 8 0 0 0 0 334 000 \ \ SPEC-I 1~·2~·92 0 0 0 LEGEND EXISTING 11111111111111 1 PROPOSED CJ) II 1 I T21 =o 621 63 0 GATE 0 0 0 M lfl ~ AIRCRAFT ACCESS D EXISTING BUILDINGS 0 0 0 lfl ~ 0 P/ - DEVELOPMENT PLAN 11 BUILDINGS I 8 0 0 0 0 lfl lfl OUTDOOR STORl\1$E 649 -If~ ~ L. A. D. c. PLANT 10 SPECIFIC PLAN @ PALMDALE, CALIFORNIA O' 200' 4 00' 600' SECURITY FENCE ---PAGE BREAK--- LAND USE & DEVELOPMENT REGULATIONS IV 85 ---PAGE BREAK--- 4.1 LAND USE The 674.1 acre LADC Plant 10 development area, contiguous to USAF Plant 42 and its airfield operations, is assigned two basic land uses described below. Diagonal lines defining the restricted manufacturing industrial zone through LADC property are the boundaries of Plant 42 R 22 Imaginary Surface Zone, which could have an impact on building heights. ,i ~ 3: . I . e> I . a: . a: ~ CJ) . 202 6 ACRES AVENUE P e . ' 0 MANUFACTURING/INDUSTRIAL RESTRICTED MANUFACTURING/ INDUSTRIAL MANUFACTURING/INDUSTRIAL RESTRICTEO MANUFACTUP.ING/INDUSTRIAL 86 ---PAGE BREAK--- Allowable land use designations, purpose and permitted uses are described below: 4.1.1 MANUFACTURING/INDUSTRIAL USES 4 . 1 .1 . 1 Purpose Primary use of the industrial area within the LADC Plant 10 Specific Plan is the research, design, fabrication, test, manufacture and warehousing of aircraft, aeronautical and military systems and related components. 4.1.1.2 Permitted Uses - Industrial 1 . All uses relevant to the operation and management of a facility engaged in the design, development and production of aircraft, aeronautical and military systems. 2 . All principal land uses and uses by Conditional Use Permit described in the M-2 and M-A Zones, sections 62.02, 65.02 and 65.05 of the City of Palmdale Zoning Ordinance. 4.1.2 RESTRICTED MANUFACTURING/INDUSTRIAL USES 4.1.2.1 Purpose Same as Manufacturing/Industrial uses 4 .1.2.2 Permitted Uses Same as Manufacturing/Industrial with restricted employee concentration due to hazard of potential aircraft accidents. Uses are compatible· if they do not result in a concentration of area that would exceed the limits specified in Palmdale City Council Resolution 91-37. 87 persons in an ---PAGE BREAK--- 4.2 GENERAL DEVELOPMENT STANDARDS Following general criteria establishes development standards for land use within Plant 10. LADC Plant 1 0 construction will comply with Uniform Building Code, Uniform Fire Code, and other ordinances adopted by the City pertaining to construction safety. 4.2.1 INFRASTRUCTURE On-site utilities will be underground, except tor equipment and structures that must be located above ground. large above ground utility equipment, connections, etc., visible from the immediate public right-of-way, will be appropriately screened. On-site private roads will be a minimum of two lanes crowned or sloped to one side, paved to approved asphalt or concrete standards. Slopes of roads will accommodate overall drainage patterns with surface water directed to related catch basins and underground pipe systems or open channels, located on either or both sides of the road. Underground utilities shall be grouped when possible as shown on the diagram below. Typical duct banks are to be utilized where possible. b b I I 2 x - I 28'- H'-0- 2 x NOTE: ROADWAY UA Y SloPC 2:1' ON[ DIR£CnON b The applicant shall design standard street improvements for the north half of Lockheed Way across the project frontage. The design shall be based on an acceptable centerline profile extending a minimum 300 feet beyond the project where applicable. These improvements shall consist of: a. Curb and gutter. Sidewalk may be required on case by case basis, b. Roadway grading and paving, overlay and or match-up, as directed by City Engineer, c. Traffic control signs and devices as required by the city Traffic Engineer, d. Pavement transition from the project boundaries to the satisfaction of the City Engineer, e. Wheelchair ramp(s) at all w alk returns, f. Roadway drainage device(s), g. Forty (40) foot minimum improvements are required. 88 ---PAGE BREAK--- 4.2 GENERAL DEVELOPMENT STANDARDS (Cont'd) L I b - Ao L =3'2. 1 ' ' I N ( t. ) S LOCKHEED WAY SECONDARY HIGHWAY e) - Infrastructural and public utilities are installed and adequate to service the existing Plant 10 operation. These elements have been analyzed for capacity to continue service in keeping with the LADC expansion program. ON-site utilities will be placed underground except for equipment and structures that will bve located above ground. Above ground utility equipment, connections, etc., visible from the public right-of-way will be screened from view using solid block walls or landscape and painted an approved color. 4.2.2 BUILDING HEIGHT Maximum building height within the LADC industrial portions is 1 50' or as permitted under FAR 14 PART 77 and Plant 42 height obstruction clearance zones. 4.2.3 BUILDING SETBACKS o Front Yard : buildings in the industrial area are a minimum front yard setback of 30' from property lines adjacent to public streets. o Rear/Side Yards: Setbacks are a minimum of 10 from property lines. o Building Separation: Minimum separation on site will conform to U.B.C. requirements. 4.2.4 EXTERIOR BUILDING MATERIALS Building improvements, with the exception of trim and architectural features, will be constructed of masonry, concrete block, glass or metal. Exterior walls will be apinted or suitably treated to LADC standard colors, similiar to existing buildings. 4.2.5 ROOF ACCESS LADDERS Ladders will be provided (as required) by LADC on the exteriors of buildings, unless an interior ladder serves the purpose and it is not visible from public screen. 89 ---PAGE BREAK--- 4.2.6 PARKING RATIOS Designing and building aircraft prototypes requires a variety of building sizes, uses, and personnel densities. Some structures are large with few assigned personnel, others provide laboratory space with no personnel, and a few have typical industrial and office densities. These special conditions make it appropriate for LADC to apply parking criteria as follows: USE OFFICE LABORATORY MFG/ASSY (0-100,000 SF) MFG/ASSY (100,000 SF-UP) SPECIAL SUPPORT WAREHOUSE # PARKING SPACES 1 Space/250 Square Feet 1 Space/300 Square Feet 1 Space/1 000 Square Feet 1 Space/2500 Square Feet 1 Space/5000 Square Feet 1 Space/first 10,000 Square Feet 1 Space/ each 20,000 SF+ Parking ratio based on gross SF, except office and laboratory based on net SF. 4.2. 7 PARKING LOTS Parking lots will contain no parking bumpers. Exceptions would be adjacent to fence. Walk ways will only be lighted from parking lots to buildings inside site perimeter fencing, unless specified by LADC. Lighting will be required in public parking lots outside of security fencing with a pole height of 29' and will maintain a minimum light intensity of 1 foot candle. 4.2.8 PARKING SET BACKS Minimum of 20' from property lines abutting public streets. 90 ---PAGE BREAK--- 4.2.9 FENCING Security fencing will be 6'-0" in height and constructed to LADC/Government Security Standards with pedestrian, automobile and aircraft gates where needed. Where fencing crosses open drainage channels, steel "man bars", six inches on center, will extend to surface level in the configuration of the channel. l..A.C. St0£ . ·1j1:: STANDARD - CHAIN LINK 91 ---PAGE BREAK--- 4.3 LOADING ZONES Some structures will have off-street loading and unloading areas. No required loading space will be located in any required setback. Loading spaces will be located and designed so truck will not back into a public street, Off-site loading facilities will have the number of spaces required per building based on the following standards:. LOADING SPACE SCHEDULE USE FLOOR AREA SPACES REO'D Administrative less than 10,000 0 Office & Lab Space 10,000 - 100,000 1 100,000 + 2 Industrial less than 5,000 0 Manufacturing 5,000 - 50,000 1 Warehouse & 50,000 - 200,000 2 Storage 200,000 + 3 Eating Places 5,000 - 20,000 1 20,000 + 2 Special Support 5,000 - 40,000 1 40,000 + 2 Off-street loading spaces will comply with the following directions LOADING SPACE SIZE SCHEDULE USE SPACE SPACE SPACE TURNING WIDTH LENGTH HEIGHT RADIUS Admin,Office, Lab, 12' 30' 14' 32' Eating & Recreation Industrial, Mfg, 12' 50' 14' 45' Storage & Warehouse Special Support 12' 50' 14' 45' 4.4 SIGNAGE The area of a sign for any building placed on or adjacent to such building shall be limited to one square foor for each lineal foot of building frontage. 92 ---PAGE BREAK--- APPROVAL & AMENDMENT PROCESS v 93 ---PAGE BREAK--- 5. 1 APPROVAL PROCESS FOR DEVELOPMENT PLAN 5.1 .1 REVIEW & APPROVAL PROCESS Proposed site plans for the construction of any improvement within Plant 1 0 Specific Plan area will be reviewed and approved for conformance with Specific Plan regulations by the LADC Facilities Director prior to submittal to the City of Palmdale. Site development plans and/or construction documents for LADC improvements in conformance with the approved Specific Plan and approved by the LADC Facilities Director will be subject for review and approval by the City of Palmdale Director of Planning along with applicable review fees. Except for Hazardous Waste Materials Storage facilities conforming submittals and submittals incorporating minor modifications will be subject to Administrative approval by the City Director of Planning. Non-conforming site plans and site plans incorpora~ing major revisions will be subject to review and approval by the City of Palmdale Planning Commission and the City of Palmdale City Council. 5.1.2 CONTENTS OF SUBMITTALS When required by these regulations, Site Plans will be submitted to and approved by the Director of Planning along with applicable review fees prior to the issuance of grading or building permits. A site plan conforming with Specific Plan regulations may be combined with and processed concurrently with a building permit. Unless waived by the Planning Director, Site Plans will contain, but are not limited to the following information: o Six copies of plot, elevation and grading plans. o Plot plans, drawn to scale and fully dimensioned containing, but not limited to the following: a. Title block b. Scale and North arrow c. Property lines of building site dimensioned d. Existing and proposed uses e. Buildings, existing and proposed, with location and size f. Streets to include designation, location, width and name g. Easements to include location, purpose and width h. Access, existing and proposed i. Parking areas j. Signs: location, height, dimensions and copy (if available) k. Fencing (walls): type, location and height I. Landscape and screening areas m. Topography, existing and proposed o Exterior elevations, all structures o Grading plan 5.1.3 MINOR MODIFICATIONS TO APPROVED SITE PLAN Minor modifications to the approved Master Plan and/or existing structures as outlined in Section 5 Minor Modifications will be submitted to the City of Palmdale, Director of Planning for his approval. No further approval will be required. 94 ---PAGE BREAK--- 5.2 AMENDMENT PROCESS FOR SPECIFIC PLAN This Amendment Process is for the Specific Plan and describes forecasted development to the year 2000. However, as LADC's line of business and projects change, the elements will change, for example, delaying development of certain buildings, and expediting certain buildings. These changes would be considered minor modifications as defined below: 5.2.1 MINOR MODIFICATIONS Minor modifications to the Plan will be reviewed and approved by the City of Palmdale, Director of Planning to include: a. On-site relocation of proposed structures. b. Interchange of permitted uses within proposed structures providing the total approved square footage for each use does not change. c. Modification in size of proposed structures up to 20%. d. On-site relocation of parking and loading areas. e. On-site relocation of site circulation system. f. Rearrangement, transfer or exchange of allowable land use within the Specific Plan, providing that the rearrangement is consistent with the Certified Environment Impact report prepared for this Specific Plan. 5.2.2 MAJOR MODIFICATIONS Major modifications to the Plan will be reviewed and approved by the City of Palmdale which may require Planning Commission review and final approval by the Palmdale City Council, including: a. Modification of permitted use. b. Increase by more than 20% in proposed gross building area. c. Changes in uses which increase by more than 20% the gross number of proposed employees. d. Modifications that can not be found to be consistent with the Certified Environmental Impact Report for this Specific Plan. Such modifications shall be accompanied by impact analysis and mitigation measures. 95