Full Text
Pahrump Off-Highway Vehicle Park Advisory Committee Meeting 1/9/2025 - Agenda Item #9 Pahrump Off-Highway Vehicle Park - Youth Offroad Track Soft Opening This plan consists of 4 phases that will ultimately allow the public to engage with the Pahrump Off-Highway Vehicle Park, generate interest and raise awareness. Phase 1: Secure the perimeter of the youth track area (Approximately 300'x500') utilizing the following materials and volunteer labor from the Advisory Committee and members of the public via a workshop day. Fencing Estimated 850ft of fencing 330ft Roll of 4ft field fence - Qty 4 @ $269.99 EA - $1079.96 T-Posts @ 12ft 75 T-posts 5ft T-posts - Qty 75 @ $4.99 EA - $374.25 T-post ties 200 Pack - Qty 2 @ $24.99 EA - $49.98 Steel wire 100ft roll - Qty 1 @ $6.49 Access Gate 16ft utility gate - Qty 1 @ $199.99 Gate wheel - Qty 1 @ $21.99 8ft steel fence posts - Qty 2 @ $36.77 EA - $73.54 90lb Quickcrete - Qty 2 @ $6.72 EA - $13.44 Signage No Trespassing Signs 10”x14” signs - Qty 8 @ $4.79 EA - $38.32 Total: $1857.96* *Total may change based on needs and material availability. Phase 2: Track Construction - Details to be discussed during February meeting Phase 3: Operational Plan / Promoting - Details to be discussed during March meeting Phase 4: Soft Opening - Details to be discussed during April meeting for April opening