Full Text
COUNTY OF NYE, STATE OF NEVADA TOWN OF PAHRUMP BID NO. 2019-01 Contractor will be responsible for clearing, grubbing, removing, and disposing of vegetation within the limits of construction. Perform grading, site preparation, excavation, filling, trenching, backfilling, and compaction necessary to construct finished areas indicated for site improvements roadways, utilities, and ancillary work. The Contractor shall provide all services, labor, materials, staking services, and equipment required for all earthwork and related operations necessary or convenient to the Contractor for furnishing a complete work as shown on the drawings or specified in these Contract Documents. BID PACKAGE Including: GENERAL INSTRUCTIONS TO CONTRACTORS SPECIAL PROVISIONS/SPECIFICATIONS BID NO: 2019-01 LABOR COMMISSION NO. PWP—NY—2018-14 MANDATORY PRE — BID MEETING: February 20, 2019 at 10:00 am. BIDS OPEN: March 6,2019 at 1:30 p.m. CONTRACT TERM: Sixty (60) calendar days from Notice to Proceed Approved: Jf KoeIigjflAIRMAN NYE COUNIY BOARD OF COMMISSIONERS Date: oJI /f 7 ---PAGE BREAK--- BID PACKAGE 3 2. GENERAL INSTRUCTIONS TO BIDDERS 3 A. RECEIPT AND OPENING OF BIDS B. PREPARATION OF BID 3 C. METHOD OF BIDDING 3 D. OBLIGATION OF BIDDER 4 E. SUBCONTRACT 4 F. QUALIFICATION OF BIDDER 4 G. ACCEPTANCE 4 3. SPECIAL PROVISIONS 4 A. STANDARD SPECIFICATIONS 4 B. TERMS 4 C. AWARD AND EXECUTION OF CONTRACT 4 D. BEGINNING OF WORK, “TIME OF COMPLETION/LIQUIDATED DAMAGES 4 E. TERMINATION 5 F. PAYMENT 5 G. BONDS 5 H. SUBCONTRACTING 5 I. DESCRIPTION OF WORK 6 J. PROPOSAL REQUIREMENTS AND CONDITIONS 9 K. MATERIAL SPECIFICATIONS 9 4. PROPOSALTOTHECOUNTYOFNYE 9 5. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE 12 6. PUBLIC CONTRACT SECTION 10232 STATEMENT 12 7. TITLE 23, UNITED STATES CODE, SECTION 112 NON-COLLUSION AFFIDAVIT 13 8. CONTRACTOR QUALIFICATION 14 9. BIDDER’S BOND 17 10. PROPOSED AGREEMENT 18 A. SCOPE OF WORK B. NOTICE TO PROCEED, TIME OF COMPLETION, LIQUIDATED DAMAGES, TERMINATION AND MODIFICATION C. THE CONTRACT SUM D. PROGRESS PAYMENTS E. ACCEPTANCE AND FINAL PAYMENT F. STATUS AS INDEPENDENT CONTRACTOR G. FAIR EMPLOYMENT PRACTICES H. PREVAILING WAGE 1. Labor Law Requirements. 2. Prevailing Rate of Wages. 3. Hours of Work. INSURANCE 1. Compensation Insurance. 2. Contractor’s Public Liability and Property Damage Insurance and Vehicle Liability Insurance. 3. Subcontractor’s Public Liability and Property Damage Insurance and Vehicle Liability Insurance. 4. Scope of Insurance and Special Hazards. 5. Builder’s Risk Insurance (Fire and Extended Coverage). 6. Proof of Carriage of Insurance. J. THE CONTRACT DOCUMENTS K. SELECTED ALTERNATES AND OPTIONS L. NO THIRD-PARTY BENEFICIARY M. ASSIGNMENT AND SUBCONTRACTING 1. Assignment. 2. Subcontracting. N. WAIVER 0. ATTORNEYS’ FEES P. ENTIRE AGREEMENT Q. NOTICES 2 ---PAGE BREAK--- 1. BID PACKAGE 2. GENERAL INSTRUCTIONS TO BIDDERS A. RECEIPT AND OPENING OF BIDS The Nye County Board of Commissioners, on behalf of the County of Nye, State of Nevada (herein called the OWNER) invites bids for: Kellogg Park Phase I: Clearing-Grubbing and Grading. A MANDATORY pre-bid meeting will be held on February 20, 2019 at 10:00 am at Kellogg Park, located along the east side of Squaw Valley Road between Bridger Street and Kings Way in the Town of Pahrump, Nevada. Bids will be received by the OWNER at the Town of Pahrump Office, 2101 E. Calvada Blvd. Ste 300, Pahrump, Nevada 89048, until 1:30 p.m. March 6,2019 Bids received after the deadline will not be honored, regardless of when postmarked or sent. Bid opening will commence at 1:30 p.m. March 6, 2019, in the Town of Pahrump Office, 2101 E. Calvada Blvd, Ste 200, Pahrump, Nevada. Award may be made at the regularly scheduled meeting of the Nye County Board of County Commissioners on March 19, 2019 in Pahrump, Nevada. Envelopes containing the bids must be sealed and addressed to the Town of Pahrump Office, 2101 E. Calvada BIvd, Ste 300, Parhump, Nevada, 89048, and labeled: BID NO. 2019-O1/PWP-NY-2018-14 Kellogg Park Phase I — Clearing-Grubbing and Grading The OWNER may, but need not, consider any bid not prepared and submitted in accordance with the provisions hereof and may, but need not, waive any informalities or errors in form. The OWNER reserves the right to reject any and all bids. Any bid may be withdrawn prior to the above-scheduled time for the opening of the bids or any authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bidder may withdraw a bid within 30 calendar days after the actual date of the opening thereof. B. PREPARATION OF BID All bid prices must be submitted in writing, in ink, or be typewritten, in both words and figures and completed according to the Schedule of Items and Prices. The bidder must submit a Contractor Qualification (a copy of which is included in this Bid Package) for the bidder and any subcontractor the bidder intends to use for the job. All required certifications must be fully executed when submitted. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If the bid is forwarded by mail, the sealed envelope must be addressed and labeled as noted above. No bids transmitted by facsimile will be considered. One original and three copies of the bid must be included. C. METHOD OF BIDDING The OWNER requests bid includes the price per unit in accordance with the Schedule of Items and Prices. The bidder’s bid shall be totaled on the last page of the bidder’s Proposal. The OWNER reserves the right to make modifications in specifications and/or conditions prior to bid opening, if deemed necessary, in which event, all bidders will be timely notified, and/or the time for bids extended. Each bidder will submit with its bid the following: 1. The information requested on the forms entitled “Contractor Qualification”, included in this bid package. 2. Data relating to the duration of time it has engaged in the performance of the type of Clearing- Grubbing and Grading improvements for which this Invitation to Bid is made. 3. References, with names, addresses and telephone numbers of entities to which the bidder previously has performed similar Clearing-Grubbing and Grading improvement work to that sought by this Invitation to Bid. Any other terms, costs, conditions or options that would affect the bidder’s bid and which have not been requested or specified in the bid package, must be noted and included in the submitted bid. 3 ---PAGE BREAK--- D. OBLIGATION OF BIDDER At the time of the opening of the bids, each bidder will be presumed to have read and thoroughly familiarized him/herself with all of the bid package documents. Each bidder will be presumed to have visited and visually examined the condition and environment of the location of the project. The failure or omission of any bidder to examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect to his/her bid. E. SUBCONTRACT The bidder must include in his or her Proposal a separately completed Contractor Qualification” for each person or company to whom the bidder proposes to award a subcontract for performance of the required duties. No proposal shall be considered if the bidder fails to submit this form. F. QUALIFICATION OF BIDDER The OWNER may make such investigations as it deems necessary to determine the ability of the bidder (and any designated subcontractors) to supply the materials and perform the work required. The bidder shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. G. ACCEPTANCE Upon acceptance of any bid, a final contract between OWNER and the successful bidder will be executed, the same to embody by reference the provisions of this Bid Package, except as otherwise negotiated. 3. SPECIAL PROVISIONS A. STANDARD SPECIFICATIONS The work embraced herein shall be done in accordance with the Standard Specifications for Public Works Construction, as distributed by Washoe County dated 2007, unless specifically indicated otherwise. In case of conflict between the Standard Specifications and these special provisions, the special provisions shall take precedence over and be used in lieu of such conflicting portions. B. TERMS Wherever in the Standard Specifications, Special Provisions, Notice to Contractors, Proposal Contract, or other contract documents the following terms are used, the intent and meaning shall be interpreted as follows: 1. Town of Pahrump Building and Grounds Department; 2. The Board of Commissioners for the Unincorporated Town of Pahrump; 3. The County of Nye for the State where reference is made to the agency administering the Contract; 4. Nye County Auditor for the State Treasurer where reference is made to Contract payments; and 5. Town of Pahrump Buildings and Grounds Manager or his assign for Director, where reference to Director and/or Engineer is made. C. AWARD AND EXECUTION OF CONTRACT The award of contract will be to the bidder who submits the lowest most responsive and responsible bidder pursuant to NRS 338.1385 Following award of the contract, a contract will be prepared, incorporating the Invitation to Bid and the Bid Package, and will be executed by the parties thereto. D. BEGINNING OF WORK, “TIME OF COMPLETION”, LIQUIDATED DAMAGES Contractor shall begin work within from one to ten (10) working days after receiving “Notice to Proceed” for work described in the bid package awarded to the contractor, and work shall be completed within 60 calendar days. Contractor shall complete all work described within 60 calendar days, unless an extension is provided in writing by County. Should the work not be complete within the specified time for completion, the Contractor will be liable for liquidated damages, payable to County in the amount of Five Hundred Dollars ($500.00) for each working day beyond the deadline taken for completion, as provided herein. All rights and remedies of the County are cumulative and not exclusive of any other rights or remedies that may be available to County, whether provided by law, equity, statute, or otherwise. However, the liquidated damages provision set forth herein is County’s exclusive 4 ---PAGE BREAK--- remedy for Contractor’s breach as specifically defined in Section D. County may elect to withhold the liquidated damages from any payment to Contractor. Attention is directed to the provisions in Section E “TERMINATION”. E. TERMINATION CAUSE. The contract may be terminated for cause by the Board of Commissioners, upon the recommendation of the Director. Cause shall include, but is not limited to, the following; testing requirements not met, or failure to comply with any contract requirement. Upon determination of cause by the Director, written notice shall be given the Contractor of the specific cause. Upon receipt of written notice, and if the notice so directs, the Contractor shall cease work and meet with the Director or his representative to determine corrective action. Corrective action will be agreed to in writing, and signed by both parties. In the event that no agreement is reached within ten (10) working days of notice, the Director may recommend the termination to the Board of Commissioners. The Board of Commissions’ decision shall be final. WITHOUT CAUSE. County shall have the right, at any time to terminate the Contract, without cause, with thirty (30) calendar days written notice. Upon termination of this Contract, other than for Cause, County shall pay Contractor for that part of the product supplied and services performed satisfactorily to the date of such termination at the rates set forth in this Contract and all applicable documents which, by reference, are made a part hereto. F. PAYMENT Payment for Clearing-Grubbing and Grading will be at the accepted unit bid price and per as installed measurements only. Include in the Unit Price overhead and profit. Include in equipment rate for force account the mobilization and demobilization, operator, fuel and maintenance. G. BONDS 1. A bid bond in an amount equal to ten percent (10%) of the total bid price must accompany the bid. 2. The bond shall be on the form provided, or on a like form. 3. A performance bond in an amount equal to one-hundred percent (100%) of the total contract amount must be provided by the Contractor. a. The bond must be furnished to the OWNER within eight days, not including Sundays and legal holidays, after the successful bidder has received notice from the OWNER that the contract has been awarded. b. The performance bond must guarantee the faithful performance by the Contractor of all the terms of the contract. 4. A materials and payment bond in an amount equal to one-hundred percent (100%) of the total contract amount must be provided by the Contractor. a. The bond must be furnished to the OWNER within eight days, not including Sundays and legal holidays, after the bidder has received notice from the OWNER that the contract has been awarded. b. The payment bond shall guarantee Contractor’s payment of all subcontractors and/or vendors for all labor, materials, provisions, supplies or items expended in fulfilling the contract. H. SUBCONTRACTING No subcontracting by Contractor shall be approved unless requested in writing to the Director and approved in writing by the Director. In no case shall said subcontract reflect a change in bid price. 5 ---PAGE BREAK--- DESCRIPTION OF WORK Sum mary: Contractor will be responsible for clearing, grubbing, removing, and disposing of vegetation within the limits of construction, Perform grading, site preparation, excavation, filling, trenching, backfilling, and compaction necessary to construct finished areas indicated for site improvements roadways, utilities, and ancillary work. The Contractor shall provide all services, labor, materials, staking services, and equipment required for all earthwork and related operations necessary or convenient to the Contractor for furnishing a complete work as shown on the drawings or specified in these Contract Documents. CLEARING AND GRUBBING Preparation: (Grubbing) - Contact “CALL BEFORE YOU DIG” before performing work. Request underground utilities to be located and marked within and surrounding construction areas. - Notify affected utility companies before starting work and comply with utilities’ requirements. - Do not close or obstruct roadways, sidewalks, and hydrants without permits. - Protect streets, roads, adjacent property, and other works to remain throughout the work. - Prevent movement or settlement of adjacent structures. - Protect existing utilities, structures, trees, plants, and other features which are to remain. - Repair or replace damaged item(s) during and due to work on the job. Clearing: - Limits of clearing and grubbing shall be all areas within contract limit lines. - Remove trees, saplings, bushes, vines and undergrowth within the limits of clearing except where noted on drawings to remain. - Remove all stumps, roots, and matted roots within the limits of grubbing to the depths below: o Roads 18 inches o Parking 12 inches] o Lawn areas 8 inches o Fills 12 inches Disposal: - Perform demolition work in accordance with the section; demolish in an orderly and careful manner. - Remove demolished materials from site except where specifically noted otherwise. Do not burn or bury materials on-site. - Remove materials as work progresses. Upon completion of work, leave areas in clean condition. - Properly dispose of materials outside the project limits and pay all costs involved. o Obtain permit from property owner on whose property the disposal is to be made. o File the permit (or certified copy of the permit) in writing with OWNER, with a release from the property owner absolving OWNER of any and all responsibility in connection with the disposal of material on the owner’s property. - Use of explosives is not permitted. - Conduct demolition to minimize interference with adjacent structures. - Cease operations immediately when adjacent structures appear to be in danger. Notify owner. Do not resume operations until directed by owner. - Conduct operations with minimum interference to public or private accesses to occupied adjacent structures. Maintain egress from and access to adjacent structures at all times. - Obtain written permission from adjacent property owners when demolition equipment will traverse infringe upon, or limit access to their property. - Comply with dust control requirements. - Do not sell demolished materials on-site. GRADING 6 ---PAGE BREAK--- Preparation: - Furnish, place, and maintain supports and shoring that may be required for sides of excavations. Actual soils encountered during construction may necessitate that slopes of temporary excavations and trenches be flatter than those indicated in drawings. o Flatten slopes of temporary excavations and trenches as required for slope stability and safe execution of work at no additional cost to owner. o Prepare and maintain slopes on sides of excavations to ensure safe execution of work. o Perform excavations in accordance with Standard Specifications, Nevada OSHA requirements, and rules, orders, and regulations. - Contractor assumes full responsibility for constructing facilities required for diversion of storm water drainage around or through construction area. Use pumping, ditching, or other measures for removal or exclusion of water, including taking care of storm water and wastewater reaching site of work from any source to prevent damage to work and adjoin property. Contractor is responsible for damage to persons and property due to interruption or diversion of storm water or wastewater caused by construction operations. - Utilities: Contact CALL BEFORE YOU DIG” not less than 48 hours prior to starting excavation. - Protect newly graded areas from traffic, erosion, and settlement. Repair and reestablish damaged or eroded slopes, elevations or grades and restore surface construction prior to acceptance. - Disturbance of lands outside the limits of the construction is prohibited, except as may be found necessary and approves in writing by the owner. Quality Assurance: Perform proctor density rests for backfilled material. - Provide proctor density tests for backfilled material, fills, and embankments for approval by the Engineer. - Conduct trenching and shoring operations in accordance with state of Nevada Occupational Safety and Health Standards for the construction Industry. Materials: - Type II Aggregate base material conforming to requirements of Section 704 of Standard Specifications for 1 inch maximum size material. - Backfill for unauthorized over exaction: Selected, well-graded material not larger than 2 inches in maximum dimension, as approved by engineer. - Selected, excavated materials used for backfill shall be free from broken concrete, lumber, grass, roots, brush, and other vegetation. Except as otherwise specified, do not use rocks or boulders in backfill which do not break down during compaction operations to less than 6 inches in size. Site Fills and Embankments: o On-site excavated materials or imported material, meeting approval of engineer. o If excavated materials are not available from immediately adjacent area of project, transport materials as required at no additional cost to owner. o On-site fill material may be allowed; use only soil or soil-rock mixture that is free from debris, organic matter, and other deleterious substance. • Fill material shall contain no rocks or lumps over 3 inches in greatest dimension with a minimum of 90 percent passing the 1 inch sieve. • Materials shall be compacted as specified in the drawings. - Imported fill and backfill material: o All imported material shall meet the requirements described above and shall, in addition be of granular nature with sufficient binder to form a firm and stable unyielding subgrade. The material shall be compacted as specified on the drawings. o Clay soils will not be acceptable. o All imported fill soil shall be non-expansive with a maximum of 8 Percent passing the 200 sieve. o Backfill around concrete structures shall be on-site excavated material not larger than 2 inches in maximum dimension or imported Type II aggregate. 7 ---PAGE BREAK--- Examination: - Verify that survey benchmark and intended elevations for work are as indicated; contact the Engineer prior to beginning work if there is discrepancy between the CONTRACTOR’s field information and the design. - Provide pumping, ditching, or other approved measures for removal or exclusion of water, including storm water and wastewater reaching site of work from any source, to prevent damage to work or adjoin property. - Dispose of storm drainage water to prevent flooding, erosion, or other damage to any portion of site, adjoin areas, or storm water conveyance structure. Dust Control: - Execute work by methods to minimize raising dust from construction operations. - Provide positive means to prevent airborne dust dispersing into atmosphere. - Comply with Nye County Dust Control Regulations. Site Excavation: - Confine sire exaction and excavation slopes for construction within limits indicated by lines and grades shown on drawings. Over-excavate any highly porous soils to depth of at least 18 inches below subgrade level if directed be the engineer. Remove materials outside limits of proposed improvements which constitute threat to maintenance or protection of improvements, as determined by engineer, at no additional cost to owner. - Compacting of Existing Ground Surface: Following scarification, compact loosened material to not less than 95 percent of maximum density, or as directed by the engineer, before any fill material id deposited thereon. - Any uncontrolled fill, deleterious material, loose or disturbed native soils shall be excavated for the work area to expose native soils, any uncontrolled fills, deleterious materials, looses or disturbed native soils shall be excavated and removed from the sire or processed for base meeting the recommendations herein. This excavation shall extend a minimum of 2 feet beyond pavement edge. - It is expected that some excavation will require removal of various types of material, including cemented soils and rock. The cost for the exaction of cemented soils and rock encountered shall be considered as included in the price bid and no additional compensation will be allowed. - Compacted subgrade shall be maintained at optimum moisture content until placement of an aggregate base course. - Ponding and jetting shall not be permitted. - After the required excavation is complete, the subgrade soil shall be scarified to a depth of at least 12 inches and moisture conditioned to the optimum moisture content and compacted to 90 percent. - Excavated native soils may be used as a structural fill after processing provided the swell potential is no greater than 5 percent, has a solubility less than 2 percent and all material greater than 3 inches is removed. Site Fill.’ - Scarification of existing Ground Surface: o First clear areas upon which fill material is to be placed, of materials required to be removed, then loosen by appropriate means to minimum depth of 12 inches. o At locations where less than 6 inches of fill is to be placed thereon, loosen existing ground to such depth that total compacted depth below underside of base course is not less than 6 inches. o Remove rocks larger than 3 inches in maximum dimension from loosened material and dispose of at no additional cost to owner. o Alternately scarify and disk and moisten loosened material as required until material is uniformly mixed and moistened throughout - Compacting of existing ground surface: Following scarification, compacted loosened material to not less than 95 percent of maximum density, or as directed by engineer, before fill material is deposited thereon. - Build up fills and embankments to full width from bottom in successive layers not exceeding 8 inches in thickness before compaction. 8 ---PAGE BREAK--- - Hand-compact by mechanical means, places inaccessible to mobile power compacting equipment to above specified densities. - Upon completion, subgrade shall be firm, hard, and unyielding with true and uniform surface conforming to grade and cross section as shown or ordered. Water Control: - Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment. - Control surface water and prevent damage to the Project, the site, and adjoining properties. - Furnish, place, and maintain supports and shoring required for sides of excavations. Erosion and Sediment Control: - Plan and execute construction by methods to control surface drainage from cuts, fills, and borrow and waste disposal areas. Prevent erosion and sedimentation. - Minimize surface area of bare soil exposed at one time. - Provide temporary measures including berms, dikes, drains, and other devices to prevent water flow. - Construct fill and waste areas by selective placement to avoid erosive surface silts or clays. - Periodically inspect earthwork to detect evidence of erosion and sedimentation: apply corrective measures. J. PROPOSAL REQUIREMENTS AND CONDITIONS The Department will furnish the prospective bidder with a proposal form. The form of the bidder’s bond, which must be provided by the Contractor, is attached hereto, following the signature page of the proposal annexed hereto. K. MATERIAL SPECIFICATIONS As outlined in the Description of Work. 4. PROPOSAL TO THE TOWN OF PAHRUMP (Because some colored inks will not reproduce in copy machines, please use black ink to complete this proposal) NAME OF BIDDER: BUSINESS ADDRESS: CITY, STATE, ZIP: TELEPHONE NO: AREA CODE The Work for which this proposal is submitted is for construction in accordance with the provisions of the Invitation to Bid and the Bid Package (including the special provisions and specifications), and also in accordance with the Standard Specifications for Public Works Construction 2007, sponsored and distributed by the Regional Transportation Commission of Washoe County, Nevada. The bidder shall set forth the “Unit Price” for each “Unit”, in clearly legible figures in the respective spaces provided in the “Schedule of Items and Prices” for this purpose. The amount set forth as the “Total Cost” shall be the extension of the “Unit Price” times the “Quantity” for the particular “Item No.”, the sum of the “Total Cost” of all Items will be the “Total Price” for the complete Project or Work. 9 ---PAGE BREAK--- In case of discrepancy between the “Unit Price” (cost per unit of measure) and the total set forth for the ‘Total Cost”, the “Unit Price” shall prevail, provided however, if the amount set forth as a “Unit Price” is ambiguous, unintelligible or uncertain for any cause and a contrary intention is not evident from the proposal and other contract documents upon which the bid is based, or if the bidder made no entry in the “Unit Price” column, or entered the same amount in the “Unit Price” and “Total Cost”, then the amount set forth as the “Total Cost” for the number of square feet in the project shall prevail. When the amount set forth as the “Total Cost” prevails, it shall be divided by the “Quantity” in corresponding “Item No.”, and the price thus obtained shall be the “Unit Price”. If this proposal shall be accepted and the undersigned shall fail to enter into the contract and furnish the bonds in the sums required by this Invitation to Bid and Bid Package, with surety satisfactory to the OWNER, within eight days, not including Sundays and legal holidays, after the bidder has received notice from the OWNER that the contract has been awarded, the OWNER may, at its option, determine that the bidder has abandoned the contract, and thereupon this proposal and the acceptance thereof shall be null and void and the forfeiture of such security accompanying the proposal shall operate and the same shall be the property of the OWNER. The undersigned, as bidder, declares that the only persons or parties interested in this proposal as principals are those named herein; that this proposal is made without collusion with any other person, firm, or corporation; that he has carefully examined the Invitation to Bid and the Bid Package; that he fully understands that the OWNER shall have the sole right and discretion to accept the Proposal; and the undersigned proposes, if this Proposal is accepted by the OWNER; that he will contract with the OWNER to provide all necessary machinery, tools, apparatus and other means of production, and to do all the work and furnish all the materials specified in the contract that will be awarded, in the manner, the time and cost therein prescribed, and according to the requirements of the Director as therein set forth, and that he will take, in full payment therefore, the following Schedule of Items and Prices, to-wit: 10 ---PAGE BREAK--- FORM OF TENDER SCHEDULE OF ITEMS AND PRICES Partl— Estimated Unit Item No. Description of Work Quantity Unit Total Cost Price 1 Clearing and Grubbing $ $ 2 Excavation $ $ 3 Over-Excavation and Backfill $ $ 4 Subgrade Prep $ $ 5 Mobilization and Demobilization $ $ 6 $ $ 7 $ $ Subtotal: $ Addendums 8 Addendum # ( ) to ( ) $ TOTAL PRICE (Sum of Items 1 to inclusive) BIDDER: BY: PRINT NAME: TITLE: E MAIL: (Signature) 11 ---PAGE BREAK--- THE BIDDER’S EXECUTION ON THE SIGNATURE PORTION OF THIS PROPOSAL SHALL ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH ARE A PART OF THIS PROPOSAL The bidder proposed subcontractor hereby certifies that he has has not participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President’s Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements. NOTE: The above certification is required by the Equal Employment Opportunity Relations of the Secretary of Labor (41 CFR 60-1.7(b)(1)) and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts that are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1 (Generally only contracts or subcontracts of $10,000 or under are exempt.) Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations. Proposed prime Contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should know that 41 CFR 60-1 prevents the award of contracts and subcontracts unless such Contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor. 12 ---PAGE BREAK--- 5. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No If the answer is yes, explain the circumstances in the following space. 6. PUBLIC CONTRACT SECTION 10232 STATEMENT PUBLIC CONTRACT SECTION 10232 STATEMENT In accordance with Public Contract Code Section 10232, the Contractor hereby states, under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractors failure to comply with an order of a federal court which ordered the Contractor to comply with an order of the National Labor Relations Board. 7. TITLE 23, UNITED STATES CODE, SECTION 112 NON-COLLUSION AFFIDAVIT TITLE 23, UNITED STATES CODE, SECTION 112 NON-COLLUSION AFFIDAVIT In accordance with Title 23, United States Code, Section 112, the bidder hereby states, under penalty of perjury, that he has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this contract. NOTE: The above Statement, Questionnaire, and Non-Collusion Affidavit are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement, Questionnaire, and Non-Collusion Affidavit. Bidders are cautioned that making a false certification may subject the certified to criminal prosecution. 13 ---PAGE BREAK--- 8. CONTRACTOR QUALIFICATION CONTRACTOR QUALIFICATION Part I Submitted by: Date: CONTRACTOR INFORMATION Company Name: Address: City: State: Zip Code: Telephone: FAX: Vendor Terms: Federal Tax ID#: Business License Time Period How Long in Business: (if applicable) LIABILITY Nevada State Contractors License Contracting Limits: Insurance Carrier: Policy No: (Attach Proof of Insurance) Have you ever filed for Chapter 11 or Chapter 13 in the last 5 years? If yes, give details. Have you had any liens or judgments, pending or complete, in the last 2 years? If yes, explain. REFERENCES Name: Phone: Name: Phone: Name: Phone: 14 ---PAGE BREAK--- CONTRACTOR QUALIFICATION Part II Date: CONTRACTOR INFORMATION Company Name: PERFORMANCE Liquidation Damages and/or Disputes List all projects in the last 2 years where liquidation damages were or may be assessed, where the substantial disputes or protests occurred, or are currently occurring. Explain in detail. Have you ever failed to complete any work awarded to you? If yes, explain where and why. Have you ever defaulted or been terminated on a contract? If yes, explain where and why. EXPERIENCE If you anticipate subcontracting work, under what conditions would subcontractors be used? List subcontractors normally used. 15 ---PAGE BREAK--- Background and experience of the principal members of your organization who would be involved in contract work for Nye County. Name Title Experience (years) 16 ---PAGE BREAK--- 9. BIDDER’S BOND COUNTY OF NYE KNOW ALL MEN BY THESE PRESENTS: That we, as PRINCIPAL, and SURETY, are held and firmly bound unto the County of Nye, hereinafter called the County, in the penal sum of TEN PERCENT (10%) OF THE TOTAL AMOUNT OF THE BID of the Principal above named, submitted by said Principal to the County of Nye for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. In no case shall the liability of the surety hereunder exceed the sum Tonopah, Nevada on 20_ for (Copy here the exact description of work, including location, as it appears on the proposal.) NOW, THEREFORE, if the aforesaid Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him for signature, enters into a written contract, in the prescribed form, in accordance with the bid, and files the two bonds with the Department, one to guarantee faithful performance and the other to guarantee payment for labor and materials, as required by law, then this obligation shall be null and void; otherwise, it shall be and remain in full force and virtue. In the event suit is brought upon this bond by the Obligee and judgment is recovered, the Surety shall pay all costs incurred by the Obligee in such suit, including a reasonable attorney’s fee to be fixed by the court. IN WITNESS WHEREOF, we have hereunto set our hands and seals on this day of 20 (SEAL) (SEAL) (SEAL) Principal (SEAL) (SEAL) (SEAL) Surety NOTE: Signatures of those executing for the Surety must be properly acknowledged. 17 ---PAGE BREAK--- 10. PROPOSED AGREEMENT (For reference only, Do Not complete this Agreement) BID #2019-01 LABOR COMMISSION PWP # NY-2018-14 CONTRACT B ETWEEN THE COUNTY OF NYE AND Nevada Contractor’s License # Address City, State, Zip Telephone Number This Contract, entered into this _day of 20_, by and between THE COUNTY OF NYE, hereinafter referred to as “County”, and of XXX, County of State of Nevada, hereinafter referred to as “Contractor.” WITNESSETH: That the County and the Contractor, for the consideration hereinafter set forth, agree as follows: Contractor shall furnish all material and perform all work in a professional manner as set forth in the Contract Documents for Bid No. 2019-01 Labor Commission PWP# NY-2018-14. Contractor further agrees to perform all extra work necessary in connection therewith and under the terms as stated in said Contract Documents; and at his (its or their) own proper cost and expense, to furnish all the bonds, materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the project in accordance with the terms and conditions and prices stated in said Contract Documents. A. SCOPEOFWORK Contractor shall furnish all material and perform all work in a professional manner as set forth in the Contract Documents for Bid No. 2019-01 Labor Commission PWP# NY-2018-14. Contractor further agrees to perform all extra work necessary in connection therewith and under the terms as stated in said Contract Documents; and at his (its or their) own proper cost and expense, to furnish all the bonds, materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories 18 ---PAGE BREAK--- and services necessary to complete the project in accordance with the terms and conditions and prices stated in said Contract Documents. B. NOTICE TO PROCEED, TIME OF COMPLETION, TERMINATION AND MODIFICATION, LIQUIDATED DAMAGES The Contractor shall not commence work, nor incur any expense therewith, before it is notified to proceed with the work. The work to be performed under this Contract shall commence within ten (10) working days of the commencement date set forth in the Notice to Proceed unless otherwise extended by written authorization by the Buildings and Grounds Manager. The following performance periods shall apply: 1. All work, including any or all options and alternatives identified in Article K, shall be substantially completed not later than Time is of the essence. In determining substantial completion and/or final acceptance, the parties agree that the County’s Director of Public Works shall be guided by principles of fairness and the efforts of the Contractor to comply with designated performance periods. 2. TERMINATION CAUSE. The contract may be terminated for cause by the Board of Commissioners, upon the recommendation of the Director. Cause shall include, but is not limited to, the following: testing requirements not met, or failure to comply with any contract requirement. Upon determination of cause by the Director, written notice shall be given the Contractor of the specific cause. Upon receipt of written notice, and if the notice so directs, the Contractor shall cease work and meet with the Director or his representative to determine corrective action. Corrective action will be agreed to in writing, and signed by both parties. In the event that no agreement is reached within ten (10) working days of notice, the Director may recommend the termination to the Board of Commissioners. The Board of Commissions’ decision shall be final. WITHOUT CAUSE. County shall have the right, at any time to terminate the Contract, without cause, with thirty (30) calendar days written notice. Upon termination of this Contract, other than for Cause, County shall pay Contractor for that part of the product supplied and services performed satisfactorily to the date of such termination at the rates set forth in this Contract and all applicable documents which, by reference, are made a part hereto. 3. LIQUIDATED DAMAGES Should the work not be complete within the specified time for completion, the Contractor will be liable for liquidated damages, payable to County in the amount of Five Hundred Dollars ($500.00) for each working day beyond the deadline taken for completion, as provided herein. All rights and remedies of the County are cumulative and not exclusive of any other rights or remedies that may be available to County, whether provided by law, equity, statute, or otherwise. However, the liquidated damages provision set forth herein is County’s exclusive remedy for Contractor’s breach as specifically defined in Section B.1. County may elect to withhold the liquidated damages from any payment to Contractor. 4. MODIFICATION/CHANGE ORDER. This Contract may not be modified, amended, supplemented, or extended except by written document executed by the Contractor and Nye County Board of Commissioners. C. THECONTRACTSUM The County shall pay Contractor, as full compensation for furnishing all materials and labor and doing all the work in strict accordance with relevant plans and specifications and to the satisfaction of the County, amounts as set forth in this Contract. The Contract sum total is to be paid based upon actual accepted quantities multiplied by the unit prices as specified in the Bid, unless otherwise stated in the drawings or specifications. D. PROGRESS PAYMENTS The County shall make progress payments as follows: Partial payments will be made once each month, based upon progress estimates made by the Contractor and satisfactory to the County. The progress estimates 19 ---PAGE BREAK--- shall be based upon materials on the job site and invoiced, or upon material in place and all labor expended thereon. The County shall make said progress payment upon receipt, review and recommendation of the Director of Public Works. Ten percent (10%) of the amount ascertained will be deducted and retained by the County until after the completion of the entire Contract in an acceptable manner. After fifty percent (50%) of the work has been completed in an acceptable manner, the County may, at its discretion, reduce the amount retained to no less than five percent of the value of the completed work. No monies payable under this Contract may be assigned by Contractor except upon prior written consent of the County. E. ACCEPTANCE AND FINAL PAYMENT As soon as practical following completion of the work, the Contractor shall make a written request to the County for final inspection and acceptance of the work. If, in the County’s sole discretion, all provisions of the specifications and Contract have been satisfied, the County will cause a Notice of Completion to be filed with the County Recorder. After forty (40) calendar days, immediately following the filing of the Notice of Completion, the remaining balance shall be paid, providing that: 1. Contractor has submitted evidence satisfactory to the County that all payrolls, bills for material, interest or retention and all other indebtedness connected with the work have been paid; 2. Contractor has submitted evidence satisfactory to the County that all subcontractors, if any, have been paid; and 3. No claims, liens or outstanding debts have been filed against the work. In the event that claims, liens or outstanding debts are filed against the work, the County shall continue to hold the retainage until such time as the claims, liens or outstanding debts are resolved. F. STATUS AS INDEPENDENT CONTRACTOR Contractor is an independent contractor and not an employee, servant, agent or representative of County. Contractor shall provide product in accordance with this Contract and all applicable documents, and any subsequent written agreements defining the nature and scope of the Services. As an independent contractor, Contractor shall not participate in the employee benefits available to County’s employees. Neither compliance or non-compliance by Contractor and Contractor’s employees, agents, and representatives with the terms and provisions of this Contract shall affect Contractor’s status as an independent contractor or relieve Contractor of any of Contractor’s duties, liabilities, or obligations under this Contract. G. FAIR EMPLOYMENT PRACTICES In connection with the performance of work under this Contract, Contractor agrees not to discriminate against any employee or applicant for employment because of race, creed, color, national origin, sex or age. Such agreement shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor further agrees to insert this provision in all subcontracts hereunder, except subcontracts for standard commercial supplies or raw materials. Any violation of such provision by Contractor shall constitute a material breach of Contract. H. PREVAILING WAGE 1. Labor Law Requirements. The Contractor must strictly comply with all applicable provisions of the Nevada State Labor Laws, including, but not limited to, Title 28, Chapter 338 of Nevada Revised Statutes, as amended, and with applicable labor laws and regulations of the Federal Government. 2. Prevailing Rate of Wages. The wages to be paid for a legal day’s work to laborers, workmen or mechanics employed upon the work specified in this Contract or upon any materials to be used therein shall not be less than the hourly minimum rate of wage as fixed by the Nevada State Labor 20 ---PAGE BREAK--- Commissioner, which schedule of wage rates is annexed hereto and hereby made a part of this Contract. Pursuant to NRS 338.060, the Contractor shall forfeit, as a penalty to the County of Nye, the sum of $50.00 for each workman employed for each calendar day or portion thereof that such workman is paid less than the designated rate for any work done under the Contract, by the Contractor or any subcontractor under the Contractor. Contractor shall submit a copy of Certified Payroll Reports to Nevada State Labor Commissioner and Nye County Public Works no later than one week after the end of each month. 3. Hours of Work. No laborer, workman or mechanic in the employ of the Contractor, subcontractor or other person doing or contracting to do the whole or a part of the work contemplated by this Contract shall be permitted or required to work more than eight hours in any one calendar day, and not more than fifty-six (56) hours in any one week, except in cases of emergency where life or property is in imminent danger. In such emergency cases, the person required to work over eight hours per day or fifty-six hours per week shall be paid at least regular wages for all overtime. This Contract may be terminated at the election of the County for any failure or refusal on the part of the Contractor or any subcontractor faithfully to perform the Contract according to the terms as to wages and hours as herein provided. NOTE: NRS 338.080(3) exempts any contract for a public work whose total cost is less than $250,000 from prevailing wage requirements. INSURANCE The Contractor shall not commence work under this Contract until he has obtained all the insurance required under this paragraph and such insurance has been approved by the County, nor shall the Contractor allow any subcontractor to commence work on his subcontract until the insurance required of the subcontractor has been obtained and approved. 1. Compensation Insurance. The Contractor shall procure and maintain, during the life of the Contract, Industrial Insurance as required by the Nevada Industrial Insurance Act, for all of his employees to be engaged in work at the site of the project under this Contract and in case of any such work sublet, the Contractor shall require the subcontractor similarly to provide such Industrial Insurance for all of the latter’s employees to be engaged in such work unless such employees are covered by the protection afforded by the Contractor’s Industrial Insurance. In case any class of employees engaged in work on the project under this Contract is not protected under the Nevada Industrial Insurance Act, the Contractor shall provide and shall cause each subcontractor to provide adequate employer’s liability insurance for the protection of such of his employees as are not otherwise protected. 2. Contractor’s Public Liability and Property Damage Insurance and Vehicle Liability Insurance. The Contractor shall procure and shall maintain during the life of this Contract Contractor’s Public Liability Insurance, Contractor’s Property Damage Insurance and Vehicle Liability Insurance in the following amounts: Minimum limits for: Personal injury or death one person $1,000,000 one occurrence $3,000,000 Property damage one accident $1,000,000 aggregate liability for loss $3,000,000 Vehicle liability single person/accident $150,000/$300,000 3. Subcontractor’s Public Liability and Property Damage Insurance and Vehicle Liability Insurance. The Contractor shall either require each of his subcontractors to procure and to maintain during the life of his subcontract, Subcontractor’s Public Liability and Property Damage Insurance and 21 ---PAGE BREAK--- Vehicle Liability Insurance of the type and in the amounts specified in subparagraph hereof, or insure the activities of each subcontractor in the amounts specified in subparagraph hereof. 4. Scope of Insurance and Special Hazards. The insurance required under subparagraphs and hereof shall name the County and its officers, agents, Director of Public Works and employees as a co-insured and provide adequate protection for the County and its officers, agents, Director of Public Works and employees, and the Contractor and his subcontractors, respectively, against damage claims which may arise from Operations under this Contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the special hazards which may be encountered in the performance of this Contract as enumerated in the Special Conditions. 5. Builder’s Risk Insurance (Fire and Extended Coverage). Until the project is completed and accepted by the County, the Contractor is required to maintain Builder’s Risk Insurance (Fire and Extended Coverage) on a 100 percent completed value basis on the insurable portion of the project for the benefit of the County, the Contractor, and subcontractors, as their interests may appear. This provision shall not release the Contractor from his obligation to complete, according to Contract documents, the project covered by the Contract, and the Contractor and his surety shall be obligated to full performance of the Contractor’s undertaking. 6. Proof of Carriage of Insurance. The Contractor shall furnish the County with certificates showing the type, amount, class of operations covered, effective dates and date of expiration of policies. Such certificates shall also contain substantially the following statements: The insurance covered by this certificate will not be canceled or materially altered, except after ten (10) days’ written notice has been received by the County.” 7. If the Contractor or any subcontractor fails to maintain the insurance required by this Contract, the County may obtain such insurance for the protection of the County, its officers, agents, Director of Public Works, and other employees, and deduct and retain the amount of the premiums for such insurance from any sums payable to the Contractor under this Contract. 8. Contractor shall defend, indemnify and hold harmless the County, its agents and employees from any and all liability, damages, judgments, claims, causes of action, liability, loss, costs, reasonable attorney’s fees, or other expenses arising from the performance of this Contract by Contractor or Contractor’s agents, employees or any of its subcontractors whether caused by the negligence or willful misconduct of Contractor, his agents, employees or affiliates. Contractor hereby indemnifies and shall defend and hold harmless the County, its officials, employees and authorized representatives and their employees from and against any and all suits, actions, legal or administrative proceedings, arbitration, claims, demands, damages, liabilities, interest, attorney’s fees, costs and expenses of whatsoever kind or nature, including those arising out of injury, death or property damage, whether arising before or after completion of the work under this Contract and in any manner directly or indirectly caused, occasioned, or contributed to in whole or in part by reason of any negligent act, omission, or fault or willful misconduct, whether active or passive, of Contractor or of anyone acting under its direction or control or on its behalf in connection with or incidental to the performance of this Contract. Contractor’s indemnity, defense, and hold harmless obligations, or portions or applications thereof, shall apply even in the event of the fault or negligence, whether active of passive, of the County, its agents and employees to the fullest extent permitted by law. J. THE CONTRACT DOCUMENTS The Contract Documents shall include the following: 1. The advertised Notice of Invitation to Bid No.2019-01, Labor Commission PWP# NY-2018-14. 2. The Bid by the Contractor (The Bidder’s Proposal); 3. This Contract; 4. The General Instructions to Bidders; 5. The Special Provisions; 22 ---PAGE BREAK--- 6. The specifications as set forth in the Special Provisions; 7. Any and all contract drawings, plans, maps, plat, blueprints and other drawings and printed or written explanatory or supplementary matter thereof, as may be set forth in said Contract Documents; 8. The Bid Bond, Performance Bond and Payment Bond; 9. All addenda issued by the Purchasing Department; 10. Contractor Qualification; 11. The Notice of Award; 12. Any amendments or addenda to all of the aforementioned documents; and 13. All provisions required by law to be incorporated in this Contract, whether actually incorporated or not. K. SELECTED ALTERNATES AND OPTIONS The following options and alternates have been selected by the County and are herewith made part of the scope of work to be performed under this Contract; Options: Alternates: L. NO THIRD-PARTY BENEFICIARY This Contract and the rights and obligations arising therefrom are strictly for the benefit of the parties to this Contract. The parties agree that any benefit or detriment asserted by the third party and/or found to exist by any court or arbitrator is merely an incidental, collateral, or consequential benefit or detriment arising from the performance or non-performance of this Contract and is not intended to create a right of action in any person not a signatory to this Contract. M. ASSIGNMENT AND SUBCONTRACTING 1. Assignment. Contractor shall not assign its rights nor delegate its duties hereunder without prior written consent of County. The County may condition such consent. 2. Subcontracting. Except as specifically detailed in the Contractor’s Bid, Contractor shall not subcontract any part of the work hereunder without the prior written approval of County. The County may condition such consent. N. WAIVER Failure by County or Contractor, at any time, to enforce or to require strict observance of any of the terms, conditions or provisions of this Contract shall not constitute a waiver of, nor limit or impair, such terms, conditions or provisions. In addition, any such failure shall not affect the right of either party to avail itself at any time of such remedies as it may have for any default hereunder by the other party hereto. 0. ATTORNEYS’ FEES This Contract shall be governed, construed and interpreted by, through and under the laws of the State of Nevada. The parties hereby agree that venue for any and all disputes related to this Contract shall be in the Fifth Judicial District Court of the State of Nevada, in and for the County of Nye. The parties further agree that, should it become necessary for either party hereto to take legal action to enforce any rights and/or obligations outlined herein, that the prevailing party shall be entitled to recover their costs to the extent provided for by law, with each party to bear their own attorneys’ fees unless otherwise provided for by law. P. ENTIRE AGREEMENT The terms and provisions of this Contract constitute the entire agreement between the parties and supersede all previous communications, representations, undertakings or agreements between the parties hereto with respect to the subject matter hereof, whether oral or written. Q. NOTICES Any notice, proposal or objection relating to this Contract shall be in writing addressed to the parties as follows: 23 ---PAGE BREAK--- OWNER: CONTRACTOR: IN WITNESS WHEREOF, the parties hereto have executed this Contract the day and year first above written. THETOWNOFPAHRUMP By: John Koenig, Chairman BOARD OF COUNTY COMMISSIONERS Contractor By: COMPANY NAME CONTRACTOR Printed Name ATTEST: Sandra “Sam” Merlino, Nye CourLty Clerk And Ex-Officio Clerk of the Board 24