← Back to Otsegocountymi Gov

Document otsegocountymi_gov_doc_5b7e13ab33

Full Text

OTSEGO COUNTY BUILDING DEPARTMENT 225 West Main Street, Gaylord, MI 49735 Telephone: (989) 731-7400 Email: [EMAIL REDACTED] REQUIRED INSPECTIONS FOR OTSEGO COUNTY  Grounding (Electrical): **May be Completed by Building Inspector with Footing Inspection** When ½" or larger reinforcing bars in footings are in place and have been tied together, prior to pouring concrete. All rebar placed in the footing, whether required for structural purposes by the MRC 2015 or not, must be secured in the proper location by means of wire ties or other support system (R403.1.3.5.3) All rebar placed in the footing must be bonded together to form the grounding electrode system and properly inspected and approved prior to the pouring of concrete. (E3608.1) In order for approval of rebar as a grounding electrode, rods must be a minimum of ½” in diameter, installed in one continuous 20-foot length, or if in multiple pieces, connected together by the usual steel tie wires or other effective means to create a 20-foot or greater length. (E3608.1.2)  Footing Inspection (Building): Call (24) hours before concrete is planned to be poured. The Inspector will check for the following items:  Straight Sides  Depth  Flat Bottoms  Code Minimums  Service (Electrical): When meter base and panel is set and service is grounded.  Underground (Plumbing): After all trenches or ditches are excavated and piping installed and prior to any backfill.  Underground (Mechanical): When underground duct work, radiant tubing, or process piping is installed prior to pouring concrete.  Foundation Reinforcement (Building): Inspections need to be when all rebar is in place and prior to pouring concrete.  Foundation Inspection/Backfill (Building): Required for Crawlspace and Basement Foundations Inspection needs to be completed when foundation walls are complete, reinforcing and anchors are installed, damp proofing or waterproofing and drainage system installed and prior to backfill.  Rough-In/Framing (Electrical, Plumbing & Mechanical): When all sub-trades have been roughed-in and prior to the installation of insulation and interior finish materials. Mechanical: Duct tightness leak test required on the rough-in or post construction when the ducts and air handlers are located outside the building thermal envelope.  Rough-In/Framing (Building): Need Truss Specs (if applicable) After the Electrical, Mechanical and Plumbing is installed and inspected. Structural members need to be seen and checked for any cutting or notching.  Rough-In/Framing Garage (Building): Need Truss Specs (if applicable) Inspection needed only if garage is going to be finished and after any sub-trades are installed and inspected.  Insulation Inspection (Building): Energy Efficiency Compliance Sticker to be on Panel Inspection needs to be completed when all sub-trades (electrical, mechanical and plumbing) have been inspected and insulation is installed. Prior to the installation of the interior finish materials.  Final – Occupancy Inspection: A Final Inspection can be conducted when the construction project is 100% completed:  Blower door test results  ALL construction is finished  ALL electrical is installed and approved  ALL plumbing is installed and approved  ALL mechanical (heating/cooling) is installed and approved. Whole-house mechanical ventilation required.