← Back to Ogden

Document Ogden_doc_e67f37c75d

Full Text

Condominium Application Ogden City Development Services 2549 Washington Blvd. Suite 240 Ogden, Utah 84401 (801) 629-8930 Condominium name: Address: Please print legibly and complete all areas: Is this a □ Condominium Conversion □ New Condominium or □ Amendment (please check one) Owner’s Name: E-mail: Phone: Engineer/Surveyor: Phone: E-mail: Checklist of items needed for Condominium Application □ Current copy of ownership plat, available at Weber County, 2380 Washington Boulevard, or by entering the address online at: http://www.co.weber.ut.us/psearch/ □ Recent copy of preliminary title report which identifies ownership, easements, liens or other encumbrances and verifies payment of taxes and assessments. □ Two copies of the original proposed condominium declarations and bylaws, with signatures. □ Tenant notification by certified mail is required if the property undergoing condominium conversion has been occupied by residential or commercial tenants. See Municipal Ordinance 14-6-5:B for letter’s content. □ Two copies of the building report that includes the following: □ The age of the building(s) □ The general condition, useful lift and capacity of the building, structural elements including the roof, foundations, mechanical system, electrical system, plumbing system, boiler and other structural elements. □ All known conditions needing repair to comply with existing building code. □ All known conditions needing repair or replacement within the next five years. □ The report shall certify that the structure(s) conforms to the minimum standards for sanitary, electrical, plumbing and heating services. OR the owner shall present plans to bring the structure(s) into compliance with said standards prior to issuance of certificates of occupancy. □ Proposed condominium plan including: □ Name of the proposed Condominium (not used previously in Weber County) □ Diagram of the floor plans identifying boundaries of the project units, convertible and expandable areas or spaces, and common areas. □ Label common areas. Are these areas open to the public, assigned to specific units or semi-private and available only to unit owners? □ North arrow, scale, and date of preparation. □ Names of the subdivider, engineer and/or surveyor of the condominium project. FEES: New: Standard $750 base fee + $150 per lot or unit = $ Conversion $200 + $150 per unit = $ If the project falls within the Sensitive Area Overlay Zone, additional $1,500 base fee + 150 per unit + cost for third-party geologic report review $ TOTAL FEES DUE: $ Cashier: see reverse for fee breakdown I have read the application and hereby certify that the information contained herein is correct to the best of my knowledge. Owner’s signature (date) ---PAGE BREAK--- Internal use only: Cashier account breakdown Engineering Account: 1000-1-03-855311-12102 $ _ ($45 per lot) Subdivision Account: 1000-1-42110 $ (remainder) Internal use only Project Coordinator Date: P/C Date: _ Zone: App. #