← Back to Ogden

Document Ogden_doc_3fc3d0ac1f

Full Text

Condominium name: Address: Is this a □ Condominium Conversion □ New Condominium or □ Amendment (please check one) Owner’s Name: E-mail: Phone: Engineer/Surveyor: Phone: E-mail: Checklist of items needed for Condominium Application □ Current copy of ownership plat, available at Weber County, 2380 Washington Boulevard, or by entering the address online at: http://www.co.weber.ut.us/psearch/ □ Recent copy of preliminary title report which identifies ownership, easements, liens or other encumbrances and verifies payment of taxes and assessments. □ Two copies of the original proposed condominium declarations and bylaws, with signatures. □ Tenant notification by certified mail is required if the property undergoing condominium conversion has been occupied by residential or commercial tenants. See Municipal Ordinance 14-6-5:B for letter’s content. □ Two copies of the building report that includes the following: □ The age of the building(s) □ The general condition, useful lift and capacity of the building, structural elements including the roof, foundations, mechanical system, electrical system, plumbing system, boiler and other structural elements. □ All known conditions needing repair to comply with existing building code. □ All known conditions needing repair or replacement within the next five years. □ The report shall certify that the structure(s) conforms to the minimum standards for sanitary, electrical, plumbing and heating ser- vices. OR the owner shall present plans to bring the structure(s) into compliance with said standards prior to issuance of certificates of occupancy. □ 15 copies of the proposed condominium plan including: □ Name of the proposed Condominium (not used previously in Weber County) □ Diagram of the floor plans identifying boundaries of the project units, convertible and expandable areas or spaces, and common areas. □ Label common areas. Are these areas open to the public, assigned to specific units or semi-private and available only to unit owners? □ North arrow, scale, and date of preparation. □ Names of the subdivider, engineer and/or surveyor of the condominium project. FEES: New: Standard $600 base fee + $150 per lot = Conversion $100 + $55 per lot Amendment: $400 base fee only= If the project falls within the Sensitive Area Overlay Zone, additional $400 base fee + 10 per lot= TOTAL FEES DUE: Cashier: see reverse for fee breakdown Ogden City Development Services 2549 Washington Blvd. Suite 240 Ogden, Utah 84401 (801) 629-8930 Condominium Application Please print legibly and complete all areas: I have read the application and hereby certify that the information contained herein is correct to the best of my knowledge. Owner’s signature (date) ---PAGE BREAK--- Internal use only: Cashier account breakdown Engineering Account: 1000-1-03-855311-12102 ($45 per lot) Subdivision Account: 1000-1-42110 (remainder) Internal use only Project Coordinator Date: P/C Zone: App. #