Full Text
Application Application Property Owner's Authorization Form - Notarized Application Fee 10 copies of the Final Plat Title opinion certifying clear title to streets, well lots, rights of ways, etc dedicated to OC 4 copies Deeds and easement agreements, if applicable, dedicated to OC Conservation or natural resource easments, if required for the plat [928-930] 4 copies Articles of incorportation for homeowners association [508] Provisions for transferring common property to the Association Provisions for maintaining the common property by said Association Provide funding for one year for Homeowner's Association to maintain common property 4 Copies Special Tax District Petition Street Lights 2 copies Other Special Tax Districts 2 copies Maintenance Surety and Performance Surety Documents are included 4 copies Approval of Health Department for Septic 2 copies Not more than 12 months since Prelim Plat approved or 24 months w/ extension If property abuts a US or State Highway or a state project, must have GDOT review As Built Data A copy of inspection/observation reports performed by the Design Professional or designee 4 copies Copy of material testing/inspection reports performed by Design Professional or designee 4 copies A summary of all design and field changes made to approved construction plans 4 copies Plans showing the "as-built" condition of all improvements and easements 4 copies As built/planned location of water, sewer, gas, electric, telephone, cable w/ appurtenances 4 copies A summary of actual (or estimated if performance bonded) construction costs by item 4 copies Certification by surveyor that all lot corner pins have been set, marked, and verified 4 copies Certification w/ supporting data that stormwater/drainage management conform with the plan 4 copies Signed and sealed "Design Construction " certification by design professional of record 4 copies Planning Department Oconee County, Georgia 1229.02.b.1i Yes No Yes No 1229.02.b.1h Yes No Yes No 1229.02.b.1g Yes No Yes No 1229.02.b.1f Yes No Yes No 1229.02.b.1e Yes No Yes No 1229.02.b.1d Yes No Yes No 1229.02.b.1c Yes No Yes No 1229.02.b.1b Yes No Yes No 1229.02.b 1229.02.b.1a Yes No Yes No 1229.04.a Yes No 1229.04.d N/A Yes No 1229.01.b N/A Yes No N/A Yes No 1229.02.a.8 Yes No Yes No 1235.05 N/A Yes No N/A Yes No 1235.07.a.1 N/A Yes No N/A Yes No Yes No 1232.06.b Yes No 508.01.a.5 Yes No 1229.02.a.6 Yes No 1232.06.b Yes No 1229.02.a.5 N/A Yes No N/A Yes No Yes No 1203.03.e Yes No 1229.02.a.3 Yes No 1229.02.a.4 Yes No 1229.02.a.1 Yes No 1229.02.a.2 Yes No Final Plat & Document Review List Regulation Compliance 1229.02.a 1229.02.a.1 Yes No Project Name: Current Zoning: Tax Parcel Development Type: Acreage: Design Professional: Final Plat Compliance Review Checklist Page 1 of 3 ---PAGE BREAK--- Final Plat & Document Review List Regulation Compliance Performance/Maintenance Surety Documents Roads Built OR Performance Surety For Performance Surety Only Letter of Credit Institution operates in Georgia 110% of estimated costs Not issued by insurance agency Contract calls for completion within 24 months after Final Plat approval Maintenance Surety Letter of Credit Institution operates in Georgia Not issued by insurance agency For full estimated cost For two years Water Built OR Performance Surety For Performance Surety Only Letter of Credit Institution operates in Georgia 110% of estimated costs Not issued by insurance agency Contract calls for completion within 24 months after Final Plat approval Maintenance Surety Letter of Credit Institution operates in Georgia Not issued by insurance agency For full estimated cost For one year Landscaping Built OR Performance Surety For Performance Surety Only Letter of Credit Institution operates in Georgia 110% of estimated costs Not issued by insurance agency Contract calls for completion within 24 months after Final Plat approval Maintenance Surety Letter of Credit Institution operates in Georgia Not issued by insurance agency For 25% of the cost For two years Stormwater (Not required if a stormwater inspection agreement is made.) Built OR Performance Surety For Performance Surety Only Letter of Credit Institution operates in Georgia 110% of estimated costs Not issued by insurance agency Contract calls for completion within 24 months after Final Plat approval Maintenance Surety Letter of Credit Institution operates in Georgia Not issued by insurance agency For full estimated cost For two years Sewer Built OR Performance Surety For Performance Surety Only Letter of Credit Institution operates in Georgia 110% of estimated costs Not issued by insurance agency Contract calls for completion within 24 months after Final Plat approval Maintenance Surety Letter of Credit Institution operates in Georgia Not issued by insurance agency For full estimated cost For one year Sidewalk Built OR Performance Surety For Performance Surety Only Letter of Credit Institution operates in Georgia 110% of estimated costs Not issued by insurance agency Contract calls for completion within 24 months after Final Plat approval Maintenance Surety Letter of Credit Institution operates in Georgia Not issued by insurance agency For full estimated cost For two years 1229.03.b N/A Yes No 1004.04.a N/A Yes No 1229.03.a N/A Yes No 1229.03.b 1229.03.a 1229.03.a 1229.03.a N/A Yes No 1229.03.b N/A Yes No 1004.04.a N/A Yes No 1229.03.a N/A Yes No 1229.03.b 1229.03.a 1229.03.a 1229.03.a N/A Yes No 1229.03.b N/A Yes No 1004.04.a N/A Yes No 1229.03.a N/A Yes No 1229.03.b 1229.03.a 1229.03.a 1229.03.a N/A Yes No 813.01.c.2 N/A Yes No 1004.04.a N/A Yes No 1229.03.a N/A Yes No 1229.03.b 1229.03.a 1229.03.a 1229.03.a N/A Yes No 1229.03.b N/A Yes No 1004.04.a N/A Yes No 1229.03.a N/A Yes No 1229.03.b 1229.03.a 1229.03.a 1229.03.a N/A Yes No 1229.03.b N/A Yes No 1004.04.a N/A Yes No 1229.03.a N/A Yes No 1229.03.b 1229.03 1229.03.a N/A Yes No Page 2 of 3 ---PAGE BREAK--- Final Plat & Document Review List Regulation Compliance Final Plat Contents Sheet size no larger than 17X22 inches Index sheet if more than one sheet is included Copy of agreement for storm water inspection Bearings and distances to nearest street line or monuments County, City, and Land lot lines tied to subdivision lines Exact boundary lines as determined by a field survey Name of subdivision, exact locations, widths, names of all inside and adjacent streets and alleys GPS/GIS Monuments Lot lines w/ dimensions to the nearest 1/10 foot and bearing to the nearest minute Lots numbered in numerical order and blocks lettered alphabetically Location, dimensions, and purposes of any easements/public use areas Accurate location, material, and description of monuments and markers A statement of any private covenants on the plat or a separate document Georgia Militia District (GMD) Lines are marked, Plat is labeled in approriate GMD Conforms to Approved Preliminary Plat Meets zoning requirements/stipulations Digitial Submissions - Must Provide Before Plat is signed, but after corrections made Includes digital submission Complies with section 1231. OR Pays conversion fee: Residential is $15 per lot, Commercial is $15 dollars per acre Final Plat Certifications and Statements and Notices Surveryor Certificate - Fig 12.5 Owner's Certificate - Fig 12.5 Design and Construction Certification - Fig 12.6 Appropriate Stamp for Health Department Certification - Fig. 12.7 Appropriate Stamp for Water Certification - Fig. 12.8 Appropriate Stamp for Sewer Certification - Fig. 12.8 Appropriate Stamp for Final Plat Approval - Fig.12.9 Notification of Private Driveway Status Notification of Private Street Status Notice of Agricultural activity in the area - mandatory for residential areas 1232.08 N/A Yes No 1232.07.a.2 N/A Yes No 1232.07.b N/A Yes No 1232.04 N/A Yes No 1232.05 Yes No 1232.03 N/A Yes No 1232.04 Yes No 1232.01 Yes No 1232.02 Yes No 1231 Yes No 1232 1232.01 Yes No 1231 1231 Yes No 1231 Yes No 1229.01.a Yes No 1229.01.a Yes No 1230.j Yes No 1230.m Yes No 1230.h Yes No 1230.i Yes No 1230.f Yes No 1230.g Yes No 1230.d Yes No 1230.e Yes No 1230.b Yes No 1230.c Yes No 1116.13.c.1 Yes No 1230.a Yes No 1230 1230 Yes No 1230 N/A Yes No Page 3 of 3