← Back to Murray

Document Murray_doc_c1277ab37f

Full Text

1 UDOT Region 2 Construction Update – Thursday, May 14, 2009 Salt Lake, Summit and Tooele Counties UDOT makes it easy to Know Where Know Why UDOT has more than 280 work zones throughout the state representing one of the biggest construction years ever. UDOT’s Know Where Know Why campaign works to proactively communicate with the driving public through: • A website with an interactive map of 30 construction sites • UDOT’s 2009 Road Construction Guide – available at 200 SUBWAY restaurants statewide • New this year: weekly text message updates. Subscribe by texting the word “UDOT” to 83043 The following information outlines UDOT Region 2 road construction and maintenance activities that may result in traffic delays or road closures. For your convenience, new information and upcoming traffic impacts appear in red text on the hard copy. Short term, continuing impacts are listed in green. To get additional information on these and other Region 2 projects in Salt Lake, Tooele and Summit County, visit www.udot.utah.gov and click on “Projects and Studies.” *All work schedules are subject to changes due to weather, emergency or equipment issues. **HIGHLIGHTS IN THIS ISSUE** • Work begins on SR 201between Bangerter and 5600 West • Work on I-15 at 11400 South closes ramp meters at 12300 South (see I-15 at 11400 South) • Work on I-215 East at Knudsen Corners complete ahead of schedule • Work scheduled on I-80 at 1800 East and in Parleys Canyon Salt Lake County FREEWAY PROJECTS Interstate 15 I-15, 500 NORTH TO THE NORTHERN I-215 CONNECTION; EXPRESSLink EXPRESSLink will add an Express Lane in each direction. General impacts include over-night and non-peak daytime lane closures throughout the project area. Big changes coming June 4: Traffic shift, ramp closures and reversible lanes All traffic will switch to the northbound lanes (east side) of the freeway The 2300 North and 900 West southbound on- and off-ramps will be closed until Fall 2009. Reversible lanes will provide • Three lanes southbound, two lanes northbound for the morning commute • Three lanes northbound and two lanes southbound for the evening commute Reversible lanes REDUCE: ---PAGE BREAK--- 2 • Construction drive-through delay for commuters (Motorists should expect some delay) • Project duration • Your costs as a road user Nighttime ramp closures: WHERE: 600 North northbound on-ramp WHEN: Saturday, May 16 at 9 p.m. to Sunday May 17at Noon WHAT: Full closure WHY: Utility work WHERE: 600 North northbound on-ramp WHEN: Wednesday May 20 at 8:00 pm until Thursday May 21 at 5 am WHAT: Full closure WHY: Barrier placement WHERE: northbound 2300 North on- and off-ramps to I-15 WHEN: Thursday May 21 at 8 pm until Friday May 22 at 5 a.m. WHAT: Full closure WHY: Barrier placement Motorists are advised to use 400 South or Beck Street to access northbound I-15 during this closure. Nighttime lane closures: WHEN: Wednesday May 27 10 p.m. to Thursday May 28 at 5:00 a.m. WHAT: One northbound lane open WHEN: Tuesday June 2 at 10 p.m. to Wednesday June 3 at 5 a.m. WHAT: One southbound lane open WHY: Preparation for the traffic switch and restriping ONGOING WHERE: I-15 at the U.S. 89 Bridge WHEN: All hours through November 2009 WHAT: Northbound single lane closure WHY: Construction of the new U.S. 89 Bridge Motorists should expect some delay and are advised to use alternate routes such as Legacy Parkway, I-215, and I-80, or vary commute times. MORE INFORMATION: [EMAIL REDACTED] or Toll free hotline: 1-[PHONE REDACTED] Website: www.udot.utah.gov/expresslink Highway Advisory Radio 1530 AM in the project corridor 11400 SOUTH INTERCHANGE ON I-15, NEW INTERCHANGE CONSTRUCTION UPCOMING WHERE: I-15 northbound near 11400 South WHEN: Thursday & Friday nights, May 14-15 from 10 p.m. to 5 a.m. WHAT: I-15 restricted to 3 travel lanes and HOV WHY: Crews are switching northbound lanes to the west to prepare for bridge demolition and replacement, and widening the freeway NOTE: Prepare for multiple short-term lane closures during this operation. ---PAGE BREAK--- 3 WHERE: I-15 northbound from 12300 South to 10600 South WHEN: Saturday, May 16 at 10 p.m. to Sunday, May 17 at 10 a.m. WHAT: Watch for multiple closures as crews switch lanes to prepare to construct the new interchange WHERE: 12300 South northbound on-ramp to I-15 WHEN: Saturday, May 16 (this will last for several months) WHAT: The ramp meters will be turned off WHY: To accommodate lane shifts at 11400 South NOTE: Watch for traffic congestion between 12300 South and 10600 South WHERE: I-15 at 11400 South WHEN: Late May / early June WHAT: HOV lane closure northbound / southbound on I-15 WHY: High mast lighting installation ONGOING WHERE: I-15 at 11400 South WHEN: --Mondays through Saturdays from 7 a.m. to 6 p.m. with schedules subject to change and occasional night & weekend work. --Completion is anticipated in fall 2010. WHAT: Watch for ongoing shoulder work and occasional short term lane closures on I-15 between 12300 South and 11400 South for the duration of the project. WHY: Crews will construct a new I-15 interchange at 11400 South with new auxiliary lanes northbound and southbound between 11400 South and 10600 South. The work is a part of the 11400 South, State Street to Bangerter Highway Project. (For information on that portion of the project please see listing under “11400 South”.) CONTACT: Wendy or Alyson at the Project Hotline, [PHONE REDACTED], or by email, [EMAIL REDACTED] M. Farah 2590 10600 SOUTH INTERCHANGE ON I-15, LANDSCAPING WHERE: 10600 South Interchange WHEN: Weekdays during daylight hours WHAT: --Work is taking place in the shoulders and gores at the interchange --Watch for trucks entering and exiting the work zone WHY: This local government project will landscape the interchange to create a gateway to Sandy City CONTACT: Jayson Christensen, (801) 879-5571 P. Tang 2003 Interstate 80 UPCOMING PROJECTS WHERE: I-80 at 2300 East WHEN: Start-up, mid / late May Placement, September WHAT: Bridge replacement I-80 WESTBOUND AT 1800 EAST, EMERGENCY REPAIR WHERE: I-80 westbound at 1800 East WHEN: Friday, May 15 at 9 p.m. through Monday, May 18 at 6 a.m. WHAT: --Fri., May 15 at 9 p.m., I-80 restricted to 1 lane in the work area --Sat., May 16 at 9 a.m., I-80 restricted to 2 lanes in the work area --Mon., May 18 at 6 a.m., all lanes open in the work area ---PAGE BREAK--- 4 WHY: Emergency pavement repair R. Franz, 2434 I-80 IN PARLEYS CANYON, RESTRIPING WHERE: I-80 eastbound / westbound in Parleys Canyon WHEN: Sunday night, May 17 from 9 p.m. to 5 a.m. WHAT: I-80 restricted to 2 lanes eastbound & westbound in a moving operation WHY: Crews will restripe the roadway to improve visibility D. Betts—2430 I-80 AT LAMBS CANYON AND MT. DELL IN PARLEYS CANYON, MAINTENANCE WHERE: I-80 at Lambs Canyon and Mt. Dell WHEN: --Monday through Thursday, May 18-21 from 9 p.m. to 6 a.m. --Tuesday through Friday, May 26-29 from 9 p.m. to 6 a.m. WHAT: --M-Th, May 18-21, I-80 eastbound restricted to 2 lanes at 9 p.m. and 1 lane at 10 p.m., beginning west of Mt. Dell bridge and moving east as work is completed in each area. May 26-29, I-80 westbound restricted to 2 lanes at 9 p.m. and 1 lane at 10 p.m., beginning east of Lambs Canyon structure and moving west as work is completed in each area. WHY: Maintenance D. Mayhew—2580 I-80, STATE STREET TO 1300 EAST & CROSS STREETS NEAR I-80; LANE ADDITIONS & BRIDGE REPLACEMENTS UPCOMING WHERE: State Street under the I-80 Bridge WHEN: --Beginning Sunday, May 17 --Sunday through Thursday nights from 9 p.m. to 6 a.m., through June WHAT: State Street restricted to 1 lane beneath the I-80 Bridge WHY: Bridge girder painting WHERE: Morris Avenue at State Street WHEN: Monday May 18 through Friday, May 22 at all hours WHAT: Morris Avenue will be closed at State Street NOTE: Businesses and City Offices can be accessed at 300 East CONTINUING WHERE: Robert Avenue (immediately north of I-80), from 400 East to 500 East WHEN: Monday through Friday from 7 a.m. to 6 p.m. through mid May WHAT: Full closure during the hours listed WHY: Waterline work NOTE: Watch for flaggers directing traffic at cross streets WHERE & WHEN: State Street eastbound on-ramp to I-80—closed through late summer ‘09 State Street westbound on-ramp to I-80—closed through summer ‘09 700 East eastbound on-ramp to I-80—closed through early fall ‘09 700 East eastbound off ramp from I-80—closed through summer ‘09 1300 East loop ramp to westbound I-80—closed through summer ‘09 WHY: To facilitate freeway reconstruction and bridge deck placement NOTE: Ramp dates are subject to change due to weather and construction issues. The dates listed are estimated and may change as construction progresses OVERVIEW WHERE: I-80 from State Street to 1300 East WHEN: Daytime and nighttime hours through fall 2009 (nighttime work will take place only when necessary) ---PAGE BREAK--- 5 WHAT: Traffic has switched to the north side of the freeway westbound lanes open at all times eastbound lanes open daily during peak hours --Eastbound I-80 restricted to 2 lanes Monday through Thursday during off-peak hours WHY: This project adds one general purpose lane in each direction throughout the corridor and auxiliary lanes, from interchange to interchange, on I-80 between State Street and 1300 East. Full bridge replacements are underway for the 300 East, 500 East, 600 East, 900 East and Highland Drive structures, along with a bridge deck replacement at State Street. NOTE: --Please use caution and pay attention to your surroundings when traveling through the work zone. Traffic flows can slow abruptly. --Oversized loads are restricted through the area. Due to narrowed lanes, large truck traffic is encouraged to use alternate routes --Watch for construction vehicles entering and exiting the construction zone. --Slow down! The speed limit is 55 mph through the construction zone. From mid March, 2008 through March 21, 2009, UHP has issued more than more than 2,918 traffic citations for speeding in the I-80 work zone, with 593 tickets issues in April, alone. Increased patrolling by UHP has decreased accidents significantly, with 29 crashes reported in the work zone through March ’08 and only 9 minor crashes reported through March ’09. Fines for speeding in this area have been enhanced. WARNING: The loop ramp at 1300 East is closed through summer, 2009, to maintain safety for drivers and workers on the project. Drivers who use the loop ramp during that time will be ticketed (with fines reaching $600). CONTACT: Carlye at the project hotline, (888) 718-1069, by email, [EMAIL REDACTED], or visit the project Website, www.udot.utah.gov/i-80 J. Montoya -2215 Interstate 215 I-215 EAST, NORTH OF KNUDSEN CORNERS TO 2000 EAST This project is now complete--nearly one month ahead of schedule! Thank you for your patience and cooperation during construction. CONTACT: Melissa at the project hotline, (801) 706-2583, or email, [EMAIL REDACTED] J. Montoya I-215 WEST AT 3800 SOUTH BRIDGE DECK RESURFACING ONGOING: Off peak lane restrictions on I-215 for work on the 3800 South Bridge. Ramp closure: WHERE: 3500 South southbound on-ramp to I-215 WHEN: Friday May 15 at 9pm to Monday May 18 at 6 a.m. WHAT: Full closure WHY: Safety for motorists and workers – motorists advised to follow detour signs For information call [PHONE REDACTED] or email [EMAIL REDACTED] ---PAGE BREAK--- 6 S.R. 201 SR 201, Bangerter Highway to 5600 West UPCOMING: WHERE: Westbound SR 201 between 3800 W and 5600 W WHEN: Sunday, May 17 WHAT: Traffic control change WHY: Crews will switch traffic to the north side of the freeway Following the traffic switch, reversible lanes will provide • Two eastbound lanes and one westbound lane during the morning commute • Two westbound lanes and one eastbound lane during the evening commute SR 201, SR 202 to I-80 UPCOMING: Beginning this spring, UDOT will add one lane in each direction. For additional information, please call [PHONE REDACTED] or email [EMAIL REDACTED] SURFACE STREET PROJECTS State Street STATE STREET TRAX BRIDGE, 7800 SOUTH TO 8000 SOUTH, BRIDGE REPLACEMENT ONGOING WHERE: State Street in the construction zone WHEN: Wednesday, May 4 through end of May during daylight hours Traffic restrictions begin on Monday, May 11 WHAT: State Street restricted to 1 lane in each direction with short-term access closures as crews move along the roadway WHY: Crews will place a seal coat on the roadway surface, restripe lanes, paint and perform landscaping activities to complete the project OVERVIEW WHERE: State Street from 7800 South to 8000 South WHEN: Daylight hours through Spring 2009 WHAT: Limited ongoing traffic restrictions WHY: Reconstruction of the TRAX Bridge includes roadway reconstruction and widening, and drainage improvements. CONTACT: Suzanne or Leah, 673-0774, by email [EMAIL REDACTED] , or visit the project Website at udot.utah.gov/TRAXBridge M. Farah -2590 Redwood Road SR 68, BANGERTER TO SARATOGA SPRINGS, WIDENING AND RECONSTRUCTION UPCOMING WHERE: Near Camp Williams WHEN: Week of May 18 WHAT: Traffic switches back to Redwood Road from the temporary detour road WHY: Switching traffic to the detour road cut build time in half in this area CONTINUING WHERE: Intersection of SR 68 & SR 73 WHEN: Currently ---PAGE BREAK--- 7 WHAT: --Traffic switches begin on both roads with traffic restricted to 1 through lane and 1 left turn lane in each direction WHY: Intersection reconfiguration WHERE: Redwood Road from Bangerter to 400 South in Saratoga Springs WHEN: Currently WHAT: --Watch for intermittent lane restrictions with flaggers directing traffic WHY: Crews are working at various locations along the roadway OVERVIEW WHERE: Redwood Road from Bangerter Highway to 400 South in Saratoga Springs WHEN: Weekdays during daylight hours with anticipated completion in fall 2009 WHAT: --Watch for shoulder closures on northbound and southbound Redwood Road --Be prepared to stop for flagging operations as trucks and heavy equipment enter and leave the roadway through October WHY: This project will widen Redwood Road to 2 lanes in each direction with a center median, shoulders, bike lanes throughout and wildlife crossings in high-impact areas NOTE: --Speed limits have been reduced to 55 mph in the project limits with fines doubled for violations --Watch for multiple lane shifts along the length of the project --Watch for trucks and heavy equipment entering and exiting the roadway. Be prepared to stop for flaggers. wide load restriction is in effect. If you must travel through the area with a wide load please call ahead at [PHONE REDACTED]. Motorists are advised to avoid blocking the intersections during intermittent closures and flagging operations. CONTACT: The SR-68 Public Information Team, [PHONE REDACTED], by email at, [EMAIL REDACTED] , or visit the project Website at, www.udot.utah.gov/sr-68south J. Van Jura – 2560 UPCOMING: WEST TEMPLE, 500 SOUTH AND 600 SOUTH, RESURFACING Mid May: West Temple will be resurfaced from 400 S to 900 S; 500 S and 600 S will be resurfaced from 200 West to State Street. Expect weekend one-block full closures. Business properties will be accessible during this work. For more information: 1 [PHONE REDACTED] 700 East 700 EAST, CARNATION TO 11400 SOUTH & 12300 SOUTH INTERSECTIONS, RECONSTRUCTION WHERE: 700 East, Carnation to 11400 South & 2300 East Intersection WHAT: Road widening and Intersection reconstruction WHEN: Start-up, late fall 2009 and runs through late 2010 WHY: To improve safety and traffic flow in the area J. Van Jura, 2560 1300 East 1300 EAST, CREEK ROAD TO 10500 SOUTH, RECONSTRUCTION UPCOMING: WHERE: 1300 East, Creek Road to 8600 South ---PAGE BREAK--- 8 WHEN: --Beginning Monday, May 18, weekdays during daylight hours --Completion of the entire project is projected for fall 2010 WHAT: --Work begins on the north end of the project and moves south as each of three successive segments is completed --Watch for intermittent shoulder and lane restrictions WHY: Corridor reconstruction CONTACT: Aubry, [PHONE REDACTED], by email, [EMAIL REDACTED] , or visit the project Website, www.udot.utah.gov/1300east 3500 South 3500 SOUTH; BANGERTER TO 2700 WEST, ROADWAY WIDENING MORE LANES, MORE OPTIONS: This project adds a westbound and eastbound general purpose lane and two center-running dedicated Bus Rapid Transit lanes. Ramp closure: WHERE: 3500 South southbound on-ramp to I-215 WHEN: Friday May 15 at 9pm to Monday May 18 at 6 a.m. WHAT: Full closure WHY: Safety for motorists and workers – motorists advised to follow detour signs This ramp closure is associated with bridge work on I-215 at 3800 South. For information call [PHONE REDACTED] or email [EMAIL REDACTED] ONGOING: Roadway reconstruction has started. Watch for variable lane shifts during non-peak hours. Reversible travel lanes have been implemented: WHERE: Bangerter Highway to 2700 West WHEN: Peak commute hours WHAT: Two lanes open west bound, variable lane shifts eastbound WHY: Utility work in preparation for road reconstruction NOTE: The speed limit has been reduced to 35 miles per hour in the work zone and will be enforced by local law enforcement. All business accesses will be maintained and motorists can also access businesses via 3100 South or Lancer Way (3650 South). More Information: www.udot.utah.gov/3500south . For specific questions or concerns, contact the Public Information Team at [EMAIL REDACTED] or [PHONE REDACTED]. UTA TRAX Construction – For information about construction taking place between West Valley City Hall and the Public Safety Building and on Market Street, see http://rideuta.com/projects/westValleyLightRail/construction.aspx or call 1(800) 888-8854 7800 South 7800 South/NEW BINGHAM HIGHWAY, 4800 WEST TO 2700 WEST, UTILITY WORK AND RESURFACING UPCOMING: Beginning this spring, UDOT will partner with West Jordan City and Jordan Valley Water Conservancy district provide drainage and utility improvements, a new road surface, curb, ---PAGE BREAK--- 9 gutter and sidewalks and new lanes at Bangerter Highway. For project information, call 1 888 424- 6442 or 888-4 Bingham. 10400 SOUTH 10400 SOUTH, BANGERTER HIGHWAY to REDWOOD ROAD; WIDENING Traffic is restricted to one lane in each direction where construction is occurring. The speed limit has been reduced to 25 mph. Flaggers may occasionally stop traffic to accommodate construction activities. Be aware of trucks and heavy equipment entering the roadway. WHERE: 3200 West intersection WHEN: Now through Monday May 11 WHAT: Southbound leg of the intersection is closed WHY: Concrete paving Weather has slowed concrete paving. A number of construction activities are happening at 2700 West – proceed with caution. CONTACT: Project hotline: [PHONE REDACTED], Email: [EMAIL REDACTED], Website: www.udot.utah.gov/10400south 11400 South 11400 SOUTH, STATE STREET TO BANGERTER HIGHWAY CONTINUING WHERE: 1400 South from 445 West to 7000 West & 3200 West to 2700 West WHEN: Mondays through Saturdays from 7 a.m. to 6 p.m. WHAT: Watch for intermittent one-way flagging operations in these locations WHY: Crews are hauling materials and installing water lines ONGOING: WHERE: 11400 South from State Street to 3600 West WHEN: --Mondays through Saturdays from 7 a.m. to 6 p.m. with schedules subject to change and occasional night work. --Completion is anticipated in fall 2010. WHAT: Watch for flagging operations and intermittent closures along the project route WHY: UDOT will complete the 11400 South Corridor between 700 West and 1300 West and widen the roadway from State Street to Bangerter Highway. The project also includes the construction of a new freeway interchange on I-15 at 11400 South (For information on that portion of the project please see listing under CONTACT: Wendy or Alyson at the Project Hotline, [PHONE REDACTED], or by email, [EMAIL REDACTED] 12300 South UPCOMING PROJECTS WHERE: 12300 South & 700 East Intersection WHEN: Start-up, fall 2009 WHAT: The intersection will be reconstruction and turn lane added WHY: To improve safety and traffic flow J. Van Jura – 2560 ---PAGE BREAK--- 10 Canyons GUARDSMAN’S PASS FROM PARK CITY BRIGHTON, CLOSED WHERE: Guardsman’s Pass from Park City to Brighton WHEN: Currently through spring 2009 WHAT: Reopening of the entire length of Guardsman’s Pass is projected for mid June WHY: Snow and icy conditions have made the road impassable. The road will reopen again this spring as warmer temperatures make it passable once again. G. Priskos, 2330 MIRROR LAKE HIGHWAY (SR 150), CLOSED WHERE: Mirror Lake Highway (SR 150) WHEN: Full reopening of Mirror Lake Highway is currently projected for Mid June WHAT: Mirror Lake Hwy is closed for the season WHY: Snow and icy conditions have made the road impassable. The road will reopen again this spring as warmer temperatures make it passable once again. T. Page, 2370 EAST CANYON (SR 65), OPEN WHERE: East Canyon Road, SR 65 WHEN: Open for the season WHAT: East Canyon Road has reopened for the season. WHY Warmer weather has melted the snow to once again make the road passable. The road will close again late next fall as weather conditions make the road unsafe to travel. LOCAL GOVERNMENT / PERMIT PROJECTS The following projects are under the direction local governments with UDOT oversight or private projects that have received permits for work in UDOT right-of-way. UTAH TRANSIT AUTHORITY (UTA) PROJECTS UTA is under construction on several new TRAX extensions that will connect the existing light-rail lines to new Salt Lake International Airport, Mid-Jordan (Murray, Midvale, West Jordan and South Jordan), and West Valley lines. Commuter Rail South, which will extend from Salt Lake to Provo is also under construction. See www.rideuta.com for more information. Summit County MIRROR LAKE HIGHWAY (SR 150), CLOSED WHERE: Mirror Lake Highway (SR 150) WHEN: Full reopening of Mirror Lake Highway is currently projected for Mid June WHAT: Mirror Lake Hwy is closed for the season WHY: Snow and icy conditions have made the road impassable. The road will reopen again this spring as warmer temperatures make it passable once again. T. Page, 2370 UPCOMING PROJECTS WHERE: I-80, Echo to Emory WHEN: Start-up, late May / early June WHAT: Resurfacing D. Mayhew, 2580 WHERE: Echo Bridge WHEN: Start-up, late May Bridge placement, September WHAT: Bridge replacement ---PAGE BREAK--- 11 D. Mayhew, 2580 WHERE: US 40, I-80 to Quinn’s Junction WHEN: Start-up, Mid May WHAT: Roadway surface grinding D. Mayhew, 2580 I-84, MORGAN COUNTY LINE TO HENEFER, RESURFACING AND RAMP REPAIR WHERE: I-84, Morgan County Line to Henefer WHEN: --Roadway impacts begin Tuesday, May 26 --Regular working hours are Monday through Friday from 7 a.m. to 5 p.m. WHAT: --Watch for intermittent shoulder closures as the project gets underway --Impacts will include I-84 restricted to 1 lane in each direction and brief closure of the Henefer Ramp WHY: Crews are patching potholes and repairing the parapets at the Henefer Ramp D. Mayhew -2580 Park City Area SR 224 & LANDMARK DRIVE NEAR KIMBALL JUNCTION, SUMMIT COUNTY PROJECT UPCOMING WHERE: Ute Blvd., and the Intersection of Ute & SR 224 WHEN: Beginning the week of May 4 during daylight hours WHAT: Friday, May 15 through Thursday, May 21 WHY: Crews will remove asphalt, restripe, pour stamped concrete and install medians NOTE: Watch for lane shifts at Ute Blvd. and SR 224 on Sunday, May 17 OVERVIEW WHERE: SR 224 near Kimball Junction WHEN: Mondays through Saturdays, 7 a.m. to 6 p.m. with anticipated completion this spring. WHAT: Watch for restrictions and backing east of SR 224 on Ute Blvd. and Landmark Drive and impacts at the intersection of Ute Blvd and SR 224. WHY: Crews are completing roadway reconstruction, intersection alignment, traffic signal on Landmark Drive and surrounding roadways along with roundabout installation at Landmark Drive NOTE: To avoid traffic congestion, use the JEREMY RANCH EXIT as and alternate route to and from the Tanger Mall and other businesses in the Landmark Drive area CONTACT: For more information contact the project team at 1-[PHONE REDACTED], or email [EMAIL REDACTED] D. Mayhew -2580 GUARDSMAN’S PASS FROM PARK CITY BRIGHTON, CLOSED WHERE: Guardsman’s Pass from Park City to Brighton WHEN: Currently through spring 2009 WHAT: Reopening of the entire length of Guardsman’s Pass is projected for mid June WHY: Snow and icy conditions have made the road impassable. The road will reopen again this spring as warmer temperatures make it passable once again. G. Priskos, 2330 Tooele County UPCOMING: SR 36, ARMY DEPOT TO 1000 NORTH; MICROSURFACE ---PAGE BREAK--- 12 Work will start spring/summer and be completed by October. SR-112, SR138 TO RAILROAD TRACKS; WIDENING AND OVERLAY Work will start spring/summer. Completion is scheduled for Oct. 15 2009 SR138, I-80 to SR-36 RUMBLE STRIP SAFETY IMPROVEMENT WHERE: SR-138 between I-80 and SR-36 WHEN: Daylight hours (7AM - 6PM). Work will begin Tuesday (May 19th) near the SR- 36/SR-138 junction and will move south/west completing work at I-80/SR-138 junction Friday (May 22nd) – Schedule subject to change WHAT: Moving operation with intermittent shoulder closures and flagging operations. WHY: Centerline/shoulder rumble strip installation to improve safety and reduce potential for run off road crashes.