Full Text
RESOLUTION NO. 2000-20 A RESOLUTION OF THE CITY OF MOSCOW, A MUNICIPAL CORPORATION OF IDAHO, ADOPTING A SCHEDULE OF REVISED FEES FOR SERVICES PROVIDED AN'D REGULATORY CHARGES AS SPECIFIED BY CITY CODE; AND PROVIDING FOR THE EFFECTIVE DATE OF ALL FEES WHEREAS, City Council deems it advisable to adopt fees set by earlier ordinances and resolutions in one general fee resolution; and WHEREAS, Council has determined that the fees included in this Resolution are appropriate and are reasonably related to the purpose for which such fees are charged NOW THEREFORE, BE IT RESOLVED by the Mayor and City Council of the City of Moscow as follows 1. That the fees set forth in Exhibit attached hereto and made a part hereof, be in force and effect in all matters relating to fees from and after the I st day of October, 2000 2. That any resolution or provision thereof which is inconsistent with this Resolution is hereby repealed. ADOPTED by the Council and APPROVED by the Mayor this s{ay of Se)lber, 2000. A G j;M Ctty Clerk f Fee Resolution 5, 2000 Page I of I ---PAGE BREAK--- RESOLUTION NO. 2000- CITY OF MOSCOW FEE SCHEDULE EXHIBIT SUB.!FCT Conditional and Special Use (MCC 4-8-4 and 4-8-5) Variance (MCC 4-8-3) Name and address contact fcc Appeals (For an appeal of any decision of city board and connnissions. The fee shall be refunded in the event the appeal is approved.) Annexation, Deannexation, Zoning, Rezoning and Comprehensive Plan amendment. Zoning Ordinance Amendment Building Board of Appeals MCC 3-9-7 (To determine suitability of alternate materials and methods of and to prove reasonable interpretation of various codes adopted by the City.) Planned Unit Developments MCC 4-7-l Informal review MCC 4-7-4 Preliminary Plan review* MCC 4-7-5 Final Plan review* MCC 4-7-6 Engineering inspection *Note- not required f(there is a simultaneous review ofa subdivision plat, in which case subdivision reviewfees shall apply. Floodplain!Floodwav Development Permit (applicable onlv when there is no related building permit) Parking Lot Review Approval (applicable only when there is no related building permit) Subdivision Development A. Preliminary plat review B. Final plat (Plus $5.00 per lot. plus actual cost of all necessary traffic controL pedestrian and street identification signs to be placed in subdivision. The City shall locate and install all signs at cost to developer.) c Engineering inspection F.:c Sch9duk EFFECTIVE 10-1-2000 N:'H 150.00 120.00 20.00 50.00 300.00 150.00 50.00 100 00 150.00 150.00 . 75% of total as estimated bv Engineer 15.00 15.00 150.00 264.00 .75% of total construction cost as estimated by the Engineer Pagclof17 ---PAGE BREAK--- D. Lot divisions 50.00 Vacation Request (Costs shall be prorated among property 275 00 owners receiving vacated land ) Name and address contract fee 25.00 Sewer Permits A Permit Fcc 25.00 B. Excavation permit 15.00 c Sewer tapping fee (The customer will provide the needed 120 00 excavation to expose the main, pump out ground water. shore or slope hole as needed, provide traffic control as needed, fill/compact, and make temporary street patch as needed ) D. General facilities charge (connection) l. Single family $500 + $5/PFU over 20* 2. Apartment unit $375 + $5/PFU over 15* 3. Trailer $500 + $5/PFU over 20* 4. Commercial $500 + $5/PFU over 15 * *Equivalentjixture unirs as established by the adopted Umform Plumbing Code E. Side sewer inspections 30.00 F. Construction inspection for public sewer pipe inspection 30.00 Sewer Rates A Residential Service l. Single family (including duplex) 19.50 2. Trailer homes 15.79 3. Hotels & motels (per rental unit) 5.84 4 Apartruents (per apartment) 15.79 5. Rooming & fraternal housing (per occupant) 3.31 B. Public Use Building l. Churches (for first 1500 cubic feet of water metered 18.86 plus $.88 per each 100 cubic feet metered thereafter.) 2. Schools (per each I 00 students or fraction thereof 35.87 c Commercial Users Fee S9:hedu!e Page 2 of 17 ---PAGE BREAK--- l. Bars and taverns (for first 1500 cubic feet of water 26.32 metered plus $1.23 for each I 00 cubic feet metered thereafter*) 2. Restaurants (for first 1500 cubic feet of water metered . 33.34 plus $1.58 for each 100 cubic feet thereafter*) 3. Other commercial (for first 1500 cubic feet of water I 23 78 metered plus $1.05 for each 100 cubic feet metered thereafter*) * For the purpose oldetemuntng the sewer rates based on the volume r{metered water, metered water will be averaged periodically using meter readings ((normal "voter u.ve period, D. Mixed Usc Service·Ŗ Whenever any user or group of users is served by a single water meter, the City Treasurer shall calculate a sewer rate based on the above rates taking into account each class of user, the number of users being serviced and the probable discharge into the sewer system. E. Annual Sewer Rates, Public Usc Buildings University of Idaho 163,769.00 Water Rates A. Installation costs of service and meters l. 5/W' meter 2. 1" meter 3. I 1/2" meter 4. 211 meter 5. Other meters B. Installation cost of service and meters in subdivisions approved after 8/01/96. I. 5/8" meter 2. 1" meter 3. I 112" meter 4 2" meter 5. Other meters c Installation cost of meters (service stub out existing and meter previously at site) I. 5/8" meter 2. 111 meter 3. I 1/2" meter 4. 2" meter Fee Schedule 690.00 770.00 1.070.00 !.340.00 Negotiated 323.00 405.00 721.00 I ,004.00 Negotiated 230.00 320.00 at cost not to exceed A.3 above at cost not to exceed AA above Page8 of 17 ---PAGE BREAK--- D Other fees Tap a. Fire line or other and up): customer provides 360.00 the excavation to expose the main, pump out water, traffic control, backfill and temporary (cold mix) street patch, tapping sleeve, gate valve and valve box * b. Fire line or other or smaller): Water 360.00 Department will provide a corporation elbow and curb stop rather than sleeve and gate valve provided by customer in above and bill customer at current cost. Customer is to provide all other work as outlined in 1a' above_ * *If there is no street cut, subtract $225 00. 2. Relocation of meters (5/8" to a. No new tap of main !25.00 b. New tap of main I. No street cut 3!5.00 II. Street cut 670.00 3. Relocatio11 of meters ( I l/2 to a. No new tap of mai11 150.00 b New tap at main I. No street cut 520.00 II. Street cut 870.00 4. Tum on - turn off after regular working hours 35.00 5. l11itial inspection and test of back flow assemblies 35.00 6. Labor and materials to repair damage to water at cost distribution system. 7. Labor and materials to repair meter boxes damaged by at cost neglect or careless operation of motor vehicles. 8. Water metered thro11gh fire hydrants: a. Less than 2,500 cubic feet 50.00 b. 2,500 cubic feet or more current rate plus $25.00 9. Tum off and tum on for non-payment first occurrence. 25.00 10. Tum off and turn on for non-payment second 50.00 occurrence in 12 months F..:e Schedule Page4ofl7 ---PAGE BREAK--- 11. Turn off and turn on for non-pa)mcnt third occurrence 75.00 in 12 months E. Minimum service charge for maintenance of water system 4.25 for each meter service connection. Per month. F. Water rate charge furnished within boundaries of the city rate structure) l . Fixed charge a. Single family residential/Duplex 5.25 b. Multi-familv/Commercial 9.50 c. High fire demand* 13.95 2. Commodity/Cap. Charge-Winter (8 months) a. Single family residential/Duplex 1.10/CCF b. Multi-family/Commercial 1.10/CCF C. High fire demand* 1.10/CCF 3. Commodity/Cap. Charge-Summer (4 months) a. Single family residential/Duplex 1.40/CCF b. 1.40/CCF c. High fire demand* 1.40/CCF G. Water rate charge for water furnished outside the 200% of the minimum boundaries of the city service charge and water rate charge H. Water rate charge for the University of Idaho water $.15 per hundred c f system I. Demand (connection fee) l. 5/8 x 3/4" meter (20 gal/min; meter cquiv-1 0) $545.00 2. I" meter (50 gal/min; meter equiv-2.5) $1,365.00 3. I 1/2" meter (100 gal/min; meter equiv-5.0 $2,725.00 4. 2" meter ( I 60 gal/min; meter cquiv-8. 0 $4,360.00 5. Larger than 2" by special contract with city J. Late water charges l. Notice of delinquency on 16th of month 5.00 2. Notice of discontinuance of service 45 days past due 25.00 (discontinue service at 60 days) Tum off and turn on for non-payment per each occurrence K. Deposits (Required of residential renters; may be required 40.00 for other applicants) Fcc Scheduk Page 5 of I7 ---PAGE BREAK--- Public lighting costs - per month - per metered water service A Residential Units 1.90 B. Commercial Units 4.90 Mobile Home Park Fees A Construction Permits (to be issued by the Administrative 375.00 Authority upon approval of all final plans by the City plus per lot fee of 5 00 Council to start construction) B. Park Operator's Permit (to be issued by the Administrative 17.50 Authority upon completion of development and satisfactory final inspection) c Space Occupancy Permit (to be issued to mobile horne 7.50 park owners to allow occupancy upon completion of development and satisfactory final inspection) Mobile Home Parks in Existence prior to 8125/72. A Permit for installation and tic down and occupancy 17.50 inspection B. Plumbing as set forth in 7-2-11 c Electrical as set forth in 7-3-6 Recreational Vehicle Parks A Preliminary Plan Review Fee 150.00 B. Final Plan Review Fee 35.00 Building Permit Fees A Plan Review Fees 65% of building permit B. Building Permit Fees Total Valuation Fee $1 00 to $500 00 $23 50 $5(ll.OO to $2,000 $23.50 tor first $500.00 plus $ 3.05 for each additional $100 or fraction thereof to and including $2,000. $2,001 to $25,000 $69.25 for the first $2,000 plus $14 00 for each additional $1,000 or fraction thereof, to and including $25,000. $25.000 to $50,000 $391.25 for first $25,000 plus $10 10 for each additional $1,000 or fraction thereof, to and including $50,000. $50,001 to $100,000 $643.75 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof to and including $100,000. Fe