Full Text
AUT t10RIZA TION FOR ADDITIONAL SERVICES CLIENT: City of Moscow PROJECT NAME: Rayburn to Main Street Bicycle - Pedestrian Pathway J-U-8 Project Number: City Project Number: CM-2900(1 00) - Key No. 5522 The following additional items of work on the project referenced above have been or will be provided by J-U-8 ENGINEERS, Inc. These additional services are a supplement to the scope of services contained in J-U-S's existing Agreement for Engineering Services for the project. Additional Services: Prepare erosion and sediment control plan for the Bicycle - Pedestrian Trail. Plan is to be developed and inserted in project plans and special provision documents. J-U-8 ENGINEERS, Inc. was verbally authorized to provide these services by: Name Date Unless otherwise noted below, J-U-8 ENGINEERS, Inc. will provide these additional services on a time and materials basis, using the firm's standard billing rates or, if applicable, the billing rates established in the Agreement for Engineering Services. Other Basis for Payment: On A lump sum basis of $ 2,689.47. Dated this 5 _t _h _ _ day of September City of Moscow Print or Type Client Name By ys:? Client or Representattv tgnature Paul C. Agidius, Mayor Print or Type Name and Title 5/91 J 19 22,. J-U-8 ENGINEERS, Inc. By: Project Representative Signature Dale R. Baune. P.E. Project Manager Print or Type Name and Title 95-69 ---PAGE BREAK--- . . Preliminary Engint g Estimate - Moscow Bicycle -Pedestrian Path lTD Form 2561 Estimate for Preliminary Engineering Rayburn to Main Street Bicycle - Pedestrian Pathway I. Sediment and Erosion control 1 2 3 4 5 6 Soil investigation Site condition review Preliminary design Prepare Details Final design - ay Total MD I 0 I I 0 I I 1.25 I 1.2 I 1 ' ;?Je2i!L L ? j - ays Principal MD 0 0 0.25 0.2 0.25 0.25 0.1 Engr. MD - ays 0 0.5 0.5 0.5 0.5 0.25 - ays Design MD 0 0 0 0 0 0 Drafting Field - ays - MD MD 0 0 0.5 0.5 0.25 0.25 ays 0 0 0 0 0 0 0 II- A TOTAL PRELIMINARY DESIGN 5.81 1.o5l 2.251 ol 1.51 ol SUMMARY I. Sediment and Erosion control SALARY COSTS A. Summary of Man-Day Costs Total M-Da I 5.8 1 2 Designer 1 0 4 Draftsman ' 1.5 5 P.L.S. ! 0 6 Clerical I I 1 7 Survey Crew I I 0 B. Payroll Burden & Fringe Benefit Costs 1 Employee Payroll 2 Direct Payroll Burden & Overhead 3 Net Fee Man-Days= Man-Days= Man-Days= Man-Days= Man-Days= Man-Days= Crew-Day= $924.38 $924.38 $2 338.67 $0.00 J9.:9_Q_ $0.00 8.40 -Hours X $31.99 -Hours X $20.59 0.00 -Hours X $18.96 12.00 -Hours X $16.00 0.00 -Hours X $23.64 8.00 -Hours X $11.63 0.00 -Hours X $25.23 TOTAL SALARY COST X X X X X X 1.00 1.53 0.15 1.00 1.00 0.00 TOTAL PAYROLL BURDEN & FRINGE BENEFIT COSTS TOTAL ESTIMATED COST Prepared by: J- U-B ENGINEERS, Inc. Ju I i /99.7' Date hour= hour= hour= hour = hour= hour= hour = Cler. P.L.S. MD - ays MD - ays 0 01 0 Ol 0 o: 0 ol 0 ol 0.5 0.5 I o! Cler. P.L.S. $268.72 $370.62 $0.00 $192.00 $0.00 $93.04 $0.00 $924.38 $1,414.30 $350.80 $0.00 $0.00 $0.00 $2,689.47 1 Page 1 - 6/14/95 -4:38PM STORMEST.XLS