March 23, 1998 CHANGE ORDER NO. 1 Project: Indian Hills Booster Pump Station 1. Relocate phone and electrical lines not shown on the original engineering plans; handwork required because these particular lines were not in conduit: Add . . . . . . . . . . . . . . . . $915.00 2. Furnish & install additional fittings & thrust blocks to account for vertical offset between the existing main & the new station; the plans hadn't shown this work because the depth of the existing main was not known until excavation during the project: Add . . . . . . . . . . . . . . . . . $780.00 3. Remove & replace more sidewalk and curb than had been shown on the original plans; this eliminated a tripping hazard in some sidewalk adjoining that which had to be replaced because of the project: Add . . . . . . . . . . . . . . . . . . . . . . . $128.00 4. Electrical work schematic alteration by contractor; a field modification required to make the new control system functional: Add . . . . . . . . . . . . . . . . . $25 0.00 5. Machine the new pump's impeller to decrease it's pressure 'boost' ; as furnished the system's operating pressure was too high: Add . . . . . . . . . . $736.00 6. Eliminate painting the new station's concrete floor; the paint was determined not to be necessary: Deduct . . . . . . . . . . . . . $280.00 Existing contract amount . . . $85,646.00 Amount of increase due to this change order . . . . . . . . . . . . . . . 2.529.00 REVISED CONTRACT AMOUNT $88,175.00 9il-nc;