Full Text
RESOLUTION NO. 91-19 A RESOLUTION OF THE CITY OF MOSCOW, A MUNICIPAL CORPORATION OF IDAHO, ADOPTING A SCHEDULE OF REVISED FEES FOR SERVICES PROVIDED AND REGULATORY CHARGES AS SPECIFIED BY CITY CODE; PROVIDING FOR THE EFFECTIVE DATE OF ALL FEES. WHEREAS, the City Council deems it advisable to adopt existing fees set by earlier ordinances and resolutions in one general fee resolution; NOW THEREFOR, BE IT RESOLVED by the Mayor and City Council of the City of Moscow as follows: 1. That the fees set forth in Exhibit attached hereto and made a part hereof, be in force and effect in all matters relating to fees from and after the 1st day of October, 1991. 2. That any resolution or provision thereof which is inconsistent with this resolution is hereby repealed. ADOPTED by the Council and APPROVED by the Mayor this 6day of September, 1991. ATTEST: Elaine Russe , city Clerk ---PAGE BREAK--- CITY OF MOSCOW FEE SCHEDULE RESOLUTION NO. 91-19 EFFECTIVE 10-1-91 CODE SECTION 3-1-5 EXHIBIT SUBJECT Conditional Use (10-84) ($82. 50 of the above amount to be refunded if hearing is denied. A maximum of $82. 50 to be refunded less actual costs of advertis ing public hearing notice mailing, and admin istrative costs if request is withdrawn) . Name and address contract fee (10-84) Variance (10-84) Name and address contract fee (10-84) Appeals (For an appeal of any decision of city board and commissions. The fee shall be refunded in the event the appeal is ap proved) . 3-2-7A-D Annexation, Deannexation, Zoning & Rezoning ($100. 00 of fee shall be refunded if public hearing is denied by Council) . (10-84) 3-9-4 4-5-4: A Name and address contract fee (10-84) Board of Appeals (To determine suitability of alternate materials and methods of construction and to prove reasonable interpretation of various codes adopted by the City) . Planned Unit Developments a. Informal review plus names and addresses Preliminary Plan review Final Plan review (Plus $5.50 per dwelling unit (10-84) (10-84) (10-84) (10-84) plus FEE SCHEDULE; Page 1 FEE $100. 00 30. 00 90. 00 20. 00 27. 50 200. 00 30. 00 30. 00 100. 00 30.00 110.00 264.00 ---PAGE BREAK--- 5-1-11 5-2-1 5-3-13 actual cost of all necessary traffic control, pedestrian and street identi fication signs to be placed in subdivision. The City shall locate and install all signs at cost to developer) . Engineering inspection - 1% of total costs. *Note - not required if there is a simultaneous review of a subdivision plat, in which case subdivision review fees shall apply. Subdivision Development 1. Preliminary plat review 110. 00 2. Final plat (prior to 1982) 264. 00 (Plus 00 per lot, plus actual cost of all necessary traffic control, pedes trian and street identification signs to be placed in the subdivision. City shall locate and install all signs at cost to developer) . 3. Engineering inspection of total construction costs) . Vacation Request (Costs shall be prorated owners receiving vacated (10-84) among property land) • Name and address contract fee sewer Permit Fee A. Excavation permit B. sewer tapping fee (10-91) iesLee---- The customer will provide the needed excavation to expose the main, pump out ground water. shore or slope hole as needed, provide traffic control as needed, fill\compact, and make temporary street patch as needed. c. General facilities charge (connection) User classification Gen. Facilities Charge Single family $500 + $5/PFU over 20* Apartment unit $375 + $5/PFU over 15* Trailer $500 + $5/PFU over 20* Commercial $500 + $5/PFU over 15* D. Side sewer inspections (10-89) E. Construction inspection for public sewer pipe inspection (10-89) *Equivalent fixture units as established by the adopte d Uniform Plumbing Code. 275. 00 25. 00 25. 00 15. 00 120,00 30. 00 30. 00 FEE SCHEDULE; Page 2 ---PAGE BREAK--- 5-3-29 Sewer Rates I. RESIDENTIAL SERVICE A. Single family (including duplex) B. Trailer homes 3-:-85 3-:-85 5. 00 4. 05 1. 50 4. 05 . 85 c. Hotels & motels D. Apartments E. Rooming & fraternal housing -:-88 perjren. un. per aprt. per occup. II. A. PUBLIC USE BUILDING Churches B. Schools III. COMMERCIAL USERS A. Bars and taverns B. Restaurants c. Other commercial IV. MIXED USE SERVICE 4-:-58 4. 75 for first 1500 cubic ft. of water metered plus 25 per each 100 cubic ft. metered thereafter. 8-:-i'5 9. 20 per each 100 students or fraction thereof. 6-:-45 6. 75 for first 1500 cubic ft. of water metered plus 35 for each 100 cubic ft. metered thereafter. * 8. 55 for first 1500 cubic ft. of water metered plus 45 for each 100 cubic ft. thereafter. * 5-:-88 6. 10 for first 1500 cubic ft. of water metered plus 30 for each 100 cubic ft. metered thereafter. * Whenever any user or group of users are served by a single water meter, the City Treasurer shall calculate a sewer rate based on the above rates taking into account each class of user, the number of users being serviced and the probable discharge into the sewer system. *For the purpose of determining the sewer rates based on the volume of metered water, metered water will be averaged periodically using meter readings of normal water use periods. Annual Sewer Rates PUBLIC USE BUILDINGS - University of Idaho (9-90) $42, 000. 00 FEE SCHEDULE; Page 3 ---PAGE BREAK--- 5-4-10 Water Rates A. Installation costs of service & meters (10-90) 485-:-88 51o. oo (10-90) 558-:-88 69o. oo (10-90) 855-:-88 1o7o. oo (10-90) 935-:-88 1170. 00 B. c. 1. 5/8" meter 2. 1" meter 3. 1 1/2" meter 4. 2" meter 5. Other meters Installation cost of meters (service stub out existing) Negotiable rate 1. 5/8" meter 2. 1" meter 3. 1 1/2" meter 4. 2" meter Other fees 1. a -a-£i e-±±ner-e e e!e ev±aee- he-exeava ±en- e-ex eee he-!a±n,- m -e e fta-wa e , a££±e-een e±-afta- he- e! e a y e ee - a eh-:- 2. 3. 4. 5. a. Tap for a fire line and b. up) ; customer provides the excavation to expose the main, pump out water, traffic control, backfill and temporary (cold mixl street patch, tapping sleeve, gate valve and valve box. Tap for fire line or smaller); Water Department will provide a corporation elbow and curb stop rather than sleeve and gate valve provided by customer in above and bill customer at current cost. Customer is to provide all other work as outlined in above. Relocation of meters (5/8" to a. No new tap of main b. New tap of main 1) No street cut 2) Street cut Relocation of meters (1 1/2 to a. No new tap of main b. New tap at main 1) No street cut 2) Street cut Turn on - turn off after regular working hours InsQect on and test of backflow assembl es 190. 00 255. 00 400.00 515. 00 360.00 360. 00 360. 00 125. 00 315. 00 670. 00 150. 00 520. 00 870. 00 25.00 35.00 FEE SCHEDULE; Page 4 ---PAGE BREAK--- D. Minimum service charge for maintenance of water system - $3795 4.25 per month for each meter service connection. E. Water rate charge furnished within boundaries of the city - Rate Structure single Family Residential Duplex Multi-Family/ Commercial High Fire* Demand Fixed charge commodity/Cap. charge 3:2!795 12.95 (9-91) Winter (8 mo) Summer ( 4 mo) -:-95/CCF -:-95/CCF :!:73:5/CCF 1.00 795/CCF 1.25 F. Water rate charge for water furnished outside the boundaries of the city. 200% of the minimum service charge and water rate charge defined in paragraphs B and c above. G. Water rate charge for Moscow cemetery Maintenance District - $.15 per hundred cubic feet. H. Water rate charge for the University of Idaho water system - $.15 per hundred cubic feet. I. Ee#e a$-efia "e Demand (connection fee) Water System Meter Size 5/811 X 3/411 1" Gal./Min. 20 50 Meter Equivalency 1.0 2.5 General Facilities Charge $ 545 1, 365 2, 725 4, 360 1 1/211 2" 100 160 5.0 8.0 Larger than 2" by special contract with the city. J. K. Late water charges Notice of delinquency on 16th of month. Accounts not paid by 25th of month following date of billing. Deposits To be required of residential renters and may be required for other applicants. FEE SCHEDULE; Page 5 5.0 0 40. 0 0 ---PAGE BREAK--- 5-10-2 6-2-8 6-3-14 6-4-9 D. Public Lighting Costs per month - per metered water service Residential Units (9-89) Commercial Units Mobile Home Park Fees 1. 90 4. 90 A. Construction Permits 375. 00 To be issued by the Administrative Authority upon approval of all final plans by the City Council to start construction - plus per lot fee of: 5. 00 B. Park Operator's Permit (prior to 1982) To be issued by the Administrative Authority upon completion of develop ment and satisfactory final inspection. 17.50 c. Space Occupancy Permit To be issued to mobile home park owners to allow occupancy upon completion of development and satisfactory final inspection. 17. 50 Mobile Home Parks in Existence prior to August 25, 1972. A. Permit for installation and tie down and occupancy inspection. 17. 50 B. Plumbing as set forth in 7-2-11 c. Electrical as set forth in 7-3-6 Recreational Vehicle Parks A. Construction Permits (prior to 1982) To be issued by the Administrative Authority upon approval of all final plans by the City Council to start construction. B. Parks Operator's Permit To be issued by the Administrative Authority to allow occupancy upon completion of development and satisfactory final inspection. c. Renewal of Recreational Park Operator's Permit For recreational vehicle parks, 375. 00 17. 50 35. 00 FEE SCHEDULE; Page 6 ---PAGE BREAK--- 7-1-2 304 an annual permit will be granted, except in cases of violations. Building Permit Total Valuation $250.00 to $500.00 $501.00 to $2,000 $2,001 to $25,000 $25,001 to $50,000 $501001 to $100,000 $100,000 and up Other inspections and fees: Plan Review Fee 50% of building permit - Residential (up to 4 units) 65% of building permit - Commercial (public, industrial buildings) (9-85) $15.00 $15.00 for first $500.00 plus $2.00 for each additional $100 or fraction thereof to and in cluding $2,000.00. $45.00 for the first $2,000 plus $9.00 for each additional $1,000 or fraction thereof, to and including $25,000. $252.00 for first $25,000 plus $6.50 for each additional $1,000 or fraction thereof, to and including $50,000. $414.50 for the first $50,000 plus $4.50 for each additional $1,000 or fraction thereof to and including $100,000. $639.50 for first $100,000 plus $3.50 for each additional $1,000 or fraction thereof. 1. Inspections outside normal business (prior to 1986) hours (minimum charge - 2 hrs.) 30.00 p/hr. 2. Reinspection fee assessed under provision of Section 305(g) 30.00 each 3. Inspections for which no fee is specifically indicated (Minimum charge - one-half hour) 30.00 p/hr. 4. Additional plan review required by changes, additions or revisions to approved plans (minimum charge - one-half hour) 30.00 pjhr. 5. One story detached accessory building used as tool and storage sheds with a projected area from 121 sq. ft. to FEE SCHEDULE; Page 7 ---PAGE BREAK--- 7-2-11 250 sq. ft. 15.00 6. Fence installation;replacement or repair. 15.00 7. Re-roofing permits for residential structures up to four units require a minimum inspection fee. 15.00 8. Moving permit. 15.00 9. Inspection of building to be moved. (Same fee as Cert. of Compliance inspection fees) . 10. Certificate of Compliance Inspection Building Ins. (structural & zoning) Electrical Plumbing Heating (Mechanical) 11. Lot division request and staff processing (as per 504(a) 8) . 12. Demolition Permit (private garages & sheds - no fee) Commercial - public building 13. Fuel Storage Tanks 14. Residing Permit Residential up to four units Plumbing Permit Permit Fee - (10-89) Residential: (per dwelling unit) (includes apartments, duplex, etc. ) Permit fee, plus inspection fee per 50.00 50.00 25.00 25.00 50.00 15.00 25.00 25.00 15.00 20.00 fixture of: (10-89) 5.50 Commercial & Industrial: (includes schools, hospitals, churches, hotels, motels, etc. ) Permit fee, plus inspection fee based on selling price of completed in stallation; to be: of first $20, 000 plus of balance. Additional fees: (in addition to afore mentioned permit fee and residential or commercial/industrial fees, the following charges will be made: Rain water system, per drain For each private disposal system Each industrial waste Installation, alteration, water system Installation, alteration, drainage/vent pipe 4.00 20.00 4.00 4.00 4.00 Each lawn sprinkler system Vacuum breakers or (10-89) 20.00 device (10-89) 5.00 Other fees: (in addition to permit fee): FEE SCHEDULE; Page 8 (10-89) (10-89) (10-85) (10-85) (10-85) ---PAGE BREAK--- 7-2-17 7-3-6 Trailer parks and mobile homes: (10-89) Each building sewer connection Each trailer sewer connection Each reconnection Special Inspection (per inspection) Reinspect ion Sewer and water fees for excavator - (residential and commercial) - Request inspection (1 hr.) or less plus $12.50 each 1/2 hr. or portion thereof Prefabricated homes, Boise Cascade, etc. 20.00 20.00 20.00 30.00 30.00 30.00 30.00 Plan Review Fees: See Electrical Fee 7-3-6-M Plumbing Contractors & Journeyman Fees A. Plumbing contractors (10-89) 45.00 Non-registered current license may be renewed by pro-rating @$5.00 per month for remainder of the year when contractor pays in advance the renewal fee for new license year. B. Journeyman Plumber's Certificate 15.00 c. Plumbing Apprentice 10.00 Electrical Permit Fees A. Temporary service B. Residential (per dwelling unit; includes apartments, duplex, etc.) (10-89) 100 Amp (10-89) Plus 50 each room (10-89) 200 Amp + (10-89) Plus $3.50 each room (10-89) Over 200 Amp (10-89) Plus $3.50 each room (10-89) Extension or addition (10-89) Installation new circuit (10-89) More than 1 circuit (10-89) C. Resident Electric Heat 20.00 30.00 4.50 35.00 4. 50 40.00 4.50 20.00 20.00 30.00 D. E. 1 to 5 KW + Plus $1.25 for each 1 KW Domestic Water Pumps Mobile Home (10-82) 37.50 over 5 KW " 1.25 (10-89) 15.00 100 Amp or less + Plus $12.50 each feeder Over 100 Amp Plus $12.50 each feeder Hookup Service Pedestal FK Other installation including industrial and commercial (10-83) (10-82) (10-83) Mobile home parks - distribution 40. 00 12.50 40.00 12.50 31.25 40.00 25.00 FEE SCHEDULE; Page 9 ---PAGE BREAK--- wiring including pedestal or service is under this section. NOTE: This does not include or permit the connection of the mobile home. See section Recreational vehicle parks, service conductors, distribution and lot supply to individual units come under this schedule plus $6.25 per lot. Wiring cost not exceeding $100.00 (10-82) 25.00 Wiring cost over $100.00 not ex- ceeding $2,000+ (10-82) 25.00 Plus 2 1/2% of total wiring cost. Wiring cost over $2,000 not ex- ceeding $10, 000+ (10-82) 87.50 Plus 1% of that portion of wiring costs, exceeding $2,000.00. Wiring cost over $10,000+ (10-82) 225.00 Plus 1/2 of 1% of that portion of wiring costs exceeding $10,000 G. water pumps, each motor (industrial use) 0 to 400 HP (10-89) 40.00 Plus $40.00 per 100 HP over 400 H. Electrically driven irrigation machines (10-82) 31.25 I. Electric signs and outline lighting Electric signs + (10-82) 31.25 Plus $.25 per sq. ft. measured on one side. (10-82) .25 Outline lighting + (10-82) 31.25 Plus $.06 per ft. of tubing (10-82) .06 J. Requested Inspection of Existing Wiring (10-89) 30.00 K. Reinspection When corrections have not been made in prescribed time and an extension has not been requested and granted.(10-89)35.00 L. No Permit Failure to send a permit and fee in prescribed time - double fee. M. Plan checking fee Minimum for 1 hour or less (10-89) 30.00 over 1 hour Plan review fees shall be prevailing rate, as determined by the Admin istrative Authority. N. Expiration of Permits Every permit issued by the City of Moscow shall expire by limitation and become null and void, if the work authorized by such permit is not commenced within ninety (90) days from the day of issuance of such permit or if the work authorized by such permit is suspended or abandoned at any time after work is comōenced FEE SCHEDULE; Page 10 ---PAGE BREAK--- 7-3-7 7-4-10 7-4-13 for a period of one hundred eighty (180) days or unless a request for extension has been made to the department and granted. Before such work can be recommenced, a new permit shall be obtained and the fee shall be one-half (1/2) of the amount required for a new permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work; and provided further, that such suspension or abandonment has not exceeded one year. Electrical Contractor's & Speciality(10-89) 45.00 Renewal of electrical contractors (10-89) 45.00 Non-registered current license may be renewed by pro-rating @$5.00 per month for remainder of the year when the contractor pays in advance the renewal fee for the new license year. Journeyman Electrician's Certificate (10-89) 7.50 Renewal of Journeyman Electrician's Certificate (10-90) 7.50 Apprentice registration 10.00 Gas Installer (10-85) Non-registered current license may be renewed by pro-rating @$3.00 per month, for the remainder of the year when the contractor pays in advance the renewal fee for the new license year. Gas Fitter's Gas Permits: (10-89) Permit Gas stove Gas refrigerator Gas space heater - 70, 000 BUT input Each additional Gas hot water tank to 60 gallon Gas space heaters over 70, 000 BTU input Each additional heater Each commercial hot water heater over 60 gallons Gas furnace to 180,000 BTU input Gas furnace 180, 000 to 400, 000 BTU input Gas furnace 400, 000 to 1, 000, 000 BTU Gas furnace over 1, 000, 000 BTU Conversion units same as above All small appliances Pipe inspection First 50 feet or less Each additional 50 feet Plan review fees (see Electrical Fees) 7-3-6M 30.00 7.00 20.00 5.00 5.00 5.00 4.00 5.00 5.50 5.00 5.50 6.50 7.50 10.00 14.00 5.00 5.00 4.00 FEE SCHEDULE; Page 11 ---PAGE BREAK--- 7-5-3 7-7-6(B) 8-3-31 9-1-6 9-2-2 9-3-4 9-4-2 9-5-3 9-6-6 Television & Radio Receiving Antennas Sign Permits 1. Electric signs: Refer to 7-3-6(I) Electrical Fees No fee 2. All other signs: The obtaining of 10.00 the foregoing permit does not (10-83) relieve the applicant from the necessity of obtaining an electrical permit in addition hereto if such sign to be installed is an electrical sign. 3. Permits Not Required: No permit will be required for posting, repairing or painting of an existing sign. Gas Transmission - Engineer's Inspection and Fee The expense of the City Engineer making inspections throughout the progress of the work and after the area affected has been restored to its original condition shall be charged to the permittee on a time and materials basis. General Licenses A. Circus, First Class - (10-85) 250.00 B. Circus, Second Class - (10-85) 175.00 C. Tent Shows, class as circus, same as A & B D. Merry go-rounds or mechanical rides - per ride (10-85) 10.00 E. Amusement and other concessions - per exhibition (10-85) 5.00 Advertising and Bill Posting 25.00 Peddlers, Solicitors & Canvassers(10-89) 25.00 Each additional employee (10-89) 5.00 Second Hand Dealers 25.00 Taxicabs (prior to 1982) For one vehicle For two vehicles (owned and operated by same party) For three vehicles (owned and operated by same party) Beer License Fees A. Annual fee 1. Consumption on premise 2. Bottled and canned beer with no consumption on premise B. Transfer fee c. Inspection fee (to cover cost 16.50 27.50 33.00 200.00 50.00 25.00 FEE SCHEDULE; Page 12 ---PAGE BREAK--- 9-7-6 9-8-5 9-12-8 10-5-2 10-5-4 10-5-8 of required inspection that needs to be done by Building Inspector, Fire Inspector, and Health Inspector. This fee must be paid before any inspections will be started. If license application is withdrawn the fee will be forfeited to the city). D. Restaurant Certification (Required to 50.00 serve anyone under age of 21). .00 Liquor License Fees: A. Annual fee B. Transfer fee (prior to 1982) 562.50 562.50 Wine License Fees A. Annual fee 1. Wine on premise consumption 2. Wine off premise consumption 3. Wine on premise consumption separate from liquor license for Sunday, holidays, etc. B. Transfer fee All licenses issued for a portion of a year shall be prorated as of the month of actual issue; provided that no fee shall be less than one half of the total fee herein set forth. Child care License (10-89) (Includes Administration, Police back ground check, taking fingerprints, inspections by Code Enforcement and Fire Department.) 75.00 75.00 14.00 25.00 30.00 Fingerprint processing (10-91) (One time charge for each operator andjor employee) rate charged by state Health Inspection - first time (10-89) - renewal (10-89) Dog Registration Fee: Lifetime registration (1-84) Tag and Collar A. Duplicate tag (1-84) B. Other Fees: Adoption (out) Adoption (placing own animal in) (10-83) part thereof " Euthanasia Boarding - per day or 35.00 30.00 8.00 1. 00 5.00 10.00 30.00 3.00 FEE SCHEDULE; Page 13 ---PAGE BREAK--- 10-9-2 11-5-10 11-5-19 11-5-26 11-6-2 11-7-8 Impound - first time Impound - second time Impound - third time Impound - fourth and each sequent time (10-83) (10-83) (10-83) sub-(10-84) c. The City will accept a $10.00 fee 7.00 14.00 21.00 28.00 in lieu of a citation for having an unlicensed dog within the city limits. The bonds set by the court shall re main in effect for matters referred to the District court. Burglary and Robbery Alarms - False Alarms False alarm fee for each occurrence. (After two false alarms during any three month period) . 25.00 Permit Parking Green Permit (per month) (per quarter) (annual) Yellow Permit (per month) (per quarter) (annual) (10-84) (10-84) (10-84) 17.00 45.00 180.00 6.00 16.00 64.00 Reserved On-Street Parking for Doctors 240.00 (10-82) Towing and Storage Fees on Illegally Parked Vehicles A. Actual cost of towing charged by the commercial towing service. B. Two dollars ($2.00) per day for storage of three-quarter (3/4) ton size pickups and smaller vehicles. c. Three dollars ($3.00) per day for storage of vehicles larger than three-quarter (3/4) ton pickups. Bicycle License - Lifetime Ownership Tag MISCELLANEOUS FEES Building Permit SurrŌary (10-82) Plus self-addressed and stamped envelopes. City Code Annual charge for updating code Notary fees Escort Services - traffic direction (10-82) escort services, and any special event 1. 00 5.00 120.00 25.00 1. 00 FEE SCHEDULE; Page 14 ---PAGE BREAK--- police services including, but not limited to, parades, house moving and other events where advance police assistance or supervision is requested or required. 22.00 This fee is per each officer per hour (2 hour minimum) (10-90) Fingerprinting - Any fingerprinting requested by a person or a company, but excluding fingerprinting related to criminal or other city matters. (10-82) 5.50 Accident Reports - A charge of $1.00 for first page and 15 for each (9-86) additional page shall be made for a copy of any accident report unless such report is issued pursuant to legal process. One dollar 00) per page will be charged for copies of official records or documents from police files. 5.00 (10-84) Criminal History Letters - letters typed on letterhead stationery indicating the absence of a criminal history in this department. Exclude police records checks requested by federal, state or local government agencies. University of Idaho Fire FEE SCHEDULE; Page 15 34,000 (9-90)