CITY OF O\OS COW CONTRACT CHANGE ORDER DATE: CHANGE ORDER NO. September 10, 1990 PROJECT NAME: - Ponderosa Booster Station CONTRACTOR: Germer Construction Company One PROJECT NO. 117-89 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES 1. Furnish and install a complete, new electrical service for the booster station, including new meter, 200 amp fused disconnect conduit, and conductors. (Subcontractor: BCL Electric) 2. Increase the 7.5 horsepower pump to 10.0 horsepower. (Subcontractor: Pa 1 ou se Empire Plumbing & Heating) 3. Furnish and install a larger combination mag starter for the smaller booster pump to accommodate an increase in horsepower. (Subcontractor: BCL Electric) TOTALS NET CHANGE IN CONTRACT PRICE JUSTIFICATION: DECREASE IN INCREASE IN CONTRACT PRICE CONTRACT PRICJ: $1,925.41 119.94 685.76 $2 '731.11 The sum of $2,731.11 the total contract price. is hereby Added to (;'\ODED TO) (BEOUGTED rR8N) The adjusted contract price to date is thereby $60,731.11 The time provided for completion is calendar days. Unchanged ( ltKREASEB) (mE"M"ffif(NOT CHAtJGED)by This document wi 1 1 become a supplement to the contract And all provisions of the coBtract wil 1 apply ACCEPTED (DATE) Germer Con (DATE) . ACCEPTED (OWNER) City of Moscow, Mayor ---PAGE BREAK--- JUSTIFICATION CHANGE ORDER NO. 1 PONDEROSA BOOSTER STATION 1. The plans and specifications for the new Ponderosa Booster Station required the contractor to utilize the same electrical conduit, meter socket, and disconnect that had served the existing station. A determination was made following contract award that the existing electrical service was undersized and that a complete, new service would be required. 2. A 7.5 horsepower motor was specified for the smaller, residential booster. The motor size was increased to 10.0 horsepower, following contract award, to provide for greater built-in capacity for the future growth in the area served by the booster station. The pump capacity may now be increased by simply installing a larger impeller. 3. A larger combination magnetic starter was required for the increase in motor size described above.