December 2, 1997 CHANGE ORDER NO. TWO Project: Project No: PALOUSE TRAIL- 1997 llS-97 1. Furnish and install 1, 750 tons of crushed basalt aggregate. This was added because the existing railroad ballast could not be adequately consolidated to accept paving. Add . $1 8,90 0.0 0 2. Repair two soft spots immediately prior to paving. Soft spot repairs were not included in the original scope of work. Add . $1,636.8 0 3. Furnish and install one 12-inch diameter by 4 0 foot long culvert across the path at Station 8+6 0. This culvert (not included in the original design) is an extension of a highway culvert and prevents ponding on the path's north side. Add . $1,432.64 4. Eliminate (in total) from the Contract Base Bid Item numbers 1 0, 1 1, 19, 2 1b and Alternate Bid Items 1 1 and 19. Subtract . . . . . . . . $26,3 0 7.0 0 Existing contract amount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Amount of decrease due to this change order . $124,663.19 1 4 73.16 REVISED CONTRACT AMOUNT • • , • • • • • • • • • $123, 190.03 POE ASPHALT PAVING, INC: CITY OF MOSCOW, IDAHO: PreS