CHANGE ORDER CHANGE ORDER NO.: 02 PROJECT: 1912 Moscow High School Historic Renovation- Phase 1 9973 lNITIATION DATE: May 21, 2001 CONTRACT DATE: February 21, 2001 PROJECT NO.: TO: OWNER: ARCHITECT: Citadel Construction, Inc. 10103 N. Division, Suite !05 Spokane, W A 99218 City of Moscow P.O. Box 9203 Moscow, ID 83843 Tel: 208/883-7087 Fax: 208/883-7093 Design West Architects 254 E. Main Tel: 509/466-2993 Pullman, WA 99163 TEL. 509/332-3113 FAX 509/332-3327 Fax: 509/466-4329 Job Site Fax: 208/882-4969 You are directed to make tbe following changes in this Contract CPR-05 2. CPR-06 3. CPR-09, 5.1 4. CPR-09, 5.2 5. CPR-10 6. CPR-12 7. CPR-15 8. CPR-16 9. CPR-19 SUBTOTAL Structural steel modifications . $ 5, 754.73 Structural steel modifications $ (1,871.72) Removal of roof drains at small roofs $ (2,155.76) Revised roof drain and overflow scheme $ 2,266.08 Retaining wall re-bar modifications $ 2,185.00 Removal of sump pump & associated work $ (1,763.90) Plumbing revisions at Kitchen $ 195.50 Metal to plastic laminate-faced toilet partitions $ 743.40) Roofmg substitution- TPO vs. Hypalon $ (2,535.75) $ 330.78 Not valid until signed by both Owner and Architect. Signature of Contractor indicates his agreement herewith, including any adjustment in the contract Sum or contract Time. It is further understood and agreed that this change constitutes compensation in full on behalf of the Contractor and its Subcontractors and Suppliers for all costs directly or indirectly attributable to the changes ordered and for any and all delays, impacts, disruptions, accelerations and/or extensions of time related thereto. No other compensation shall be allowed for the Modifications made herewith. The original Contract Sum $ 1,228,000.00 Net change by previously authorized Change Orders $ 20,879.43 The Contract Sum prior to tbis Change Order was $ 1,248,879.43 The Contract Sum will be increased bv this Change Order $ 330.78 The new Contract Sum including tbis Change Order will be $ 1,249,210.21 The Contract Time will be extended by calendar days by this Change Order. Pagel of2 2001-27 ---PAGE BREAK--- CONTRACTOR: Citadel Construction, Inc. 10103 N. Division, Suite 106 Spokane,VVA 99218 End of Document OWNER: (Date) Page 2 of2 ARCHITECT: Design VV est Architects 254 E. Main Pullman, VV A 99163 (Signat/4)-y (Date) I I c. rz..sc >