Full Text
RESOLUTION NO. 97-16::__ A RESOLUTION OF THE CITY OF MOSCOW, A MUNICIPAL CORPORATION OF THE STATE OF IDAHO, ADOPTING A SCHEDULE OF FEES FOR SERVICES PROVIDED AND REGULATORY CHARGES AS SPECIFIED IN THE 1994 UNIFORM BUILDING CODE, APPENDIX CHAPTER 33, PROVIDING FOR THE EFFECTIVE DATE OF SUCH FEES. WHEREAS, the City Council deems it advisable to adopt fees set by earlier ordinances pertaining to grading permits within the 1994 Uniform Building Code; and WHEREAS, the Council has determined that the fees included in this Resolution are appropriate and are reasonably related to the purpose for which such fees are charged; NOW, THEREFORE, BE IT RESOLVED by the Mayor and City Council of the City of Moscow as follows: 1. That the fees set forth in the 1994 Uniform Building Code, Appendix Chapter 33, as set forth in Exhibit A, attached hereto and made a part hereof, be in full force and effect and all matters relating to such fees from and after the date of the passing of this Resolution. 2. That any Resolution or provision thereof which is inconsistent with this Resolution is hereby repealed. ADOPTED by the City Council and APPROVED by the Mayor this 20th day of October , 1997. Elaine Russell, City Clerk Resolution\Fecs\sr RESOLUTION Paul C. Agidius, Mayor Page I ---PAGE BREAK--- ''EXHIBIT RESOWTIQ\f NO. 97-16 APPENDIX CHAPTER 33 1994 UNIFORM BUILDING CODE SECTION 3310- GRADING FEES 3310.1 General. Fees shall be assessed in accordance with the provisions of this section or shall be as set forth in the fee schedule adopted by the jurisdiction. 3310.2 Plan Review Fees. When a plan or other data are required to be submitted , a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be as set forth in Table A -33-A. Separate plan review fees shall apply to retaining walls or major drainage structures as required elsewhere in this code . For excavation and fill on the same site, the fee shall be based on the volume of excavation or fill, whichever is greater. 3310.3 Grading Permit Fees. A fee for each grading penn it shall be paid to the building official as set forth in Table A-33-B. Separate permits and fees shall apply to retaining walls or major drain age structures as required elsewhere in this code. There shall be no separate charge for standard terrace drains and similar facilities. TABLE A·33-A-GRADING PLAN REVIEW FEES 50 cubic yards ( 38.2 ml) or less . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No fee 51 to 100 cubic yards ( 40m3 to 76.5 ml) . . . . . . . . $15.00 lO l to l , 000 cubic yards (77 .2 ml to 764.6 ml) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22.50 1,001 to 10,000 cubic yards (765.3 ml to 7645.5 ml) . 30.00 !0,001 to 100.000 cubic yards (7646.3 ml to 76 455 ml)---$30.00 for the first 10,000 cubic yards (7645.5 ml), plus $15.00 for each additional 10, 000 yards (7645.5 ml) or fraction thereof. 100,001 to 200,000 cubic yards (76 456 ml to !52 911 ml)-$165.00 for the first 100,000 cubic yards (76 455 ml), plus $9.00 for each additional 10,000 cubic yards (7645.5 ml) or fraction thereof. 200.001 cubic yards (I 52 912m3) or more-$255.00for 200,000cubic yards (I 52 9l l ml). plus $4.50 for each additional 10,000 cubic yards (7645.5 ml) or fraction thereof. Other Fees: Additional plan review required by changes , additions or revisions to approved plans . $30.00 per hour* (minimum charge--one-half hour) *Or the total hourly cost to the jurisdiction, whichever is the greatest This cost shall include supervision, overhead, equipment, hourly wages and fringe beneftts of the employees involv<:d. TABLE A-33-B-GRADING PERMIT FEES1 50 cubic yards ( 38.2 m3) or less . . . . . . . . . . . . . . . . . . . . . . . . . $15.00 51 to 100 cubic yards ( 40 ml to 76.5 ml) . . . . 22.50 101 to l ,000 cubic yards (77 .2 ml to 764.6 m3)---$22.50 for the first 100 cubic yards (76.5 ml) plus $10.50 for each additional l 00 cubic yards (76.5 ml) or fraction thereof. 1.001 to lO,OOO cubic yards(765.3m3to 7645.5 l7.00forthe first l ,OOOcubic yards (764.6 m3). plus $9.00 for each additional 1,000 cubic yards (764.6 m3) or fraction thereof . 10.001 to lOO,OOO cubic yards (7646.3 m3 to 76 455 m3)---$198.00 for the first 10,000 cubic yards (7645.5 m3). plus $40.50 for each additional l 0,000 cubic yards (7645.5 m3) or fraction thereof. 100.001 cubic yards (76 456 ml) or more -$562.50 for the first 100,000 cubic yards (76 455m3), plus $22.50 for each additional !0,000 cubic yards (7645.5 m3) or fraction thereof. Other Inspections and Fees: 1. Inspections outside of nonnal business hours (minimum charge°two hours) 1-512 $30.00 per hour2 l0/20/97