← Back to Moscow

Document Moscow_doc_86c27ac4a1

Full Text

RESOLUTION NO. 96- 09 A RESOLUTION OF THE CITY OF MOSCOW, A MUNICIPAL CORPORATION OF IDAHO, ADOPTING A SCHEDULE OF REVISED FEES FOR SERVICES PROVIDED AND REGULATORY CHARGES AS SPECIFIED BY CITY CODE; PROVIDING FOR THE EFFECTIVE DATE OF ALL FEES. WHEREAS, the City Council deems it advisable to adopt existing fees set by earlier ordinances and resolutions in one general fee resolution; NOW THEREFORE, BE IT RESOLVED by the Mayor and City Council of the City of Moscow as follows 1. That the fees set forth in Exhibit attached hereto and made a part hereof, be in force and effect in all matters relating to fees from and after the 1st day of October, !996. 2. That any resolution or provision thereof which is inconsistent with this resolution is hereby repealed. ADOPTED by the Council and APPROVED by the Mayor this Z4th day of September , 1996. ATTEST res/feesidm Paul C. Agidius:;;;; ---PAGE BREAK--- CITY OF MOSCOW FEE SCHEDULE RESOLUTION NO. 96-09 EFFECTIVE I 0-1-96 CODE SECTION 3-1-5 3-2-7A-D 3-9-4 4-5-4 A EXHIBIT SUBJECT Conditional and Special Use ($82.50 of the above amount to be refunded if hearing is denied. A maximum of $82.50 to be refunded less actual costs of advertising public hearing notice, mailing, and administrative costs if request is withdrawn.) Variance Name and address contact fee Appeals (For an appeal of any decision of city board and commissions. The fee shall be refunded in the event the appeal is approved.) Annexation, Deannexation, Zoning, Rezoning and Comprehensive Plan amendment. 00.00 of fee shall be refunded if public hearing is denied by Council.) Zoning Ordinance Amendment Board of Appeals (To determine suitability of alternate materials and methods of construction and to prove reasonable interpretation of various codes adopted by the City.) Planned Unit Developments a. Informal review Preliminary Plan review Final Plan review Engineering inspection - .75% of total costs Fee Schedule; Page I 150.00 120.00 20.00 50.00 300.00 150.00 50.00 100.00 150.00 150.00 ---PAGE BREAK--- *Note - not required if there is a simultaneous review of a subdivision plat, in which case subdivision review fees shall apply. 5-1-11 Subdivision Development 1. Preliminary plat review 150.00 2. Final plat 275.00 264.00 (Plus $5.00 per dwelling unit plus actual cost of all necessary traffic control, pedestrian and street identification signs to be placed in subdivision. The City shall locate and install all signs at cost to developer.) 3. Engineering inspection ( . 7 5% of total construction costs as estimated by the Engineer). 4. Lot divisions 50.00 5-2-1 Vacation Request 275.00 (Costs shall be prorated among property owners receiving vacated land.) Name and address contract fee 25.00 5-3-13 Sewer Permit Fee 25.00 a. Excavation permit 15.00 b. Sewer tapping fee 120.00 The customer will provide the needed excavation to expose the main, pump out ground water, shore or slope hole as needed, provide traffic control as needed, fill/compact, and make temporary street patch as needed. c. General facilities charge (connection) Single family - $500 + $5/PFU over 20* Apartment unit - $375 + $5/PFU over 15* Trailer - $500 + $5/PFU over 20* Commercial - $500 + $5/PFU over 15 * d. Side sewer inspections 30.00 e. Construction inspection for public sewer pipe inspection 30.00 *Equivalent fixture units as established by the adopted Uniform Plumbing Code. 5-3-29 Sewer Rates I. RESIDENTIAL SERVICE a. Single family (including duplex) 17.50 b. Trailer homes 14.18 c. Hotels & motels (per rental unit) 5.25 d. Apartments (per apartment) 14.18 e. Rooming & fraternal housing (per occup.) 2.98 Fee Schedule; Page 2 ---PAGE BREAK--- II. PUBLIC USE BUILDING a. Churches (for first 1500 cubic feet of water 16.93 metered plus $.88 per each 100 cubic feet metered thereafter.) b. Schools (per each 100 students or fraction thereof 32.20 III COMMERCIAL USERS a. Bars and taverns (for first 1500 cubic feet of water 23.63 metered plus $1.23 for each 100 cubic feet metered thereafter*) b. Restaurants (for first 1500 cubic feet of water metered 29.93 plus $1.58 for each 100 cubic feet thereafter*) c. Other commercial (for first 1500 cubic feet of water 21.35 metered plus $1.05 for each I 00 cubic feet metered thereafter*) IV. MIXED USE SERVICE Whenever any user or group of users are served by a single water meter, the City Treasurer shall calculate a sewer rate based on the above rates taking into account each class of user, the number of users being serviced and the probable discharge into the sewer system. * For the purpose of determining the sewer rates based on the volume of metered water, metered water will be averaged periodically using meter readings of normal water use periods. Annual Sewer Rates PUBLIC USE BUILDINGS University ofldaho 147,000.00 5-4-10 Water Rates A Installation costs of service and meters I. 5/8" meter 690.00 2. I" meter 770.00 3. I 112" meter 1070.00 4. 2" meter 1340.00 5. Other meters Negotiable rate B. Installation cost of service and meters in subdvision aonroved after 8/01/96. I. 5/8" meter 323.00 2. I" meter 405.00 3. I 1/2" meter 721.00 4. 2" meter 1004.00 Fee Schedule; Page 3 ---PAGE BREAK--- 5 . Other meters Negotiable rate Bl:;. Installation cost of meters (service stub out existing and previously meter at site) I. 5/8" meter 230.00 2. 1" meter 320.00 3. 1 112" meter at cost not to exceed A 3 above 4. 2" meter at cost not to exceed A 4 above GD. Other fees I. a. Tap (fire line or other) and up); customer provides 360.00* the excavation to expose the main, pump out water, traffic control, backfill and temporary (cold mix) street patch, tapping sleeve, gate valve and valve box. b. Tap (fire line or other) or smaller); Water 360 00* Department will provide a corporation elbow and curb stop rather than sleeve and gate valve provided by customer in above and bill customer at current cost Customer is to provide all other work as outlined in above. *If there is no street cut, subtract $225.00. 2. Relocation of meters ( 5/8" to 1 a. No new tap of main 125.00 b. New tap of main I) No street cut 315.00 2) Street cut 670.00 3. Relocation of meters (1 1/2 to a. No new tap of main 150.00 b. New tap at main 1) No street cut 520.00 2) Street cut 870.00 4. Turn on - turn off after regular working hours 35.00 5. Initial inspection and test of back flow assemblies 35.00 6. Labor and materials to repair damage to water at cost distribution system. 7. Labor and materials to repair meter boxes damaged by at cost neglect or careless operation of motor vehicles. Water metered through fire hydrants: Less than 2, 500 cubic feet 50.00 b. 2,500 cubic feet or more, at current rate plus $25.00 9. Turn off and turn on for non payment per each 25.00 occurrence. Fee Schedule; Page 4 ---PAGE BREAK--- Fixed charge BE. Minimum service charge for maintenance of water system - 4.25 per month for each meter service connection. E.E Water rate charge furnished within boundaries of the city Rate Structure Single F amity Residential Duplex 4.25 Multi-Family/ Commercial 8.50 Commodity/cap. charge Winter (8 mo) 100/CCF 100/CCF Summer (4 mo) 1.25/CCF 1.25/CCF Meter Size 5/8" X 3/4" I" I 112" 2" FG. Water rate charge for water furnished outside the boundaries of the city. 200% of the minimum service charge and water rate charge. defined in paragraphs B and G a!Jeve. GH. Water rate charge for Moscow Cemetery Maintenance District - Same as other users. HI. Water rate charge for the University ofldaho water system - $.15 per hundred cubic feet. U Demand (connection fee) Water System Gal/Min.  Eauiv. 20 10 50 2.5 100 5.0 160 8.0 Larger than 2" by special contract with city Fee Schedule; Page 5 High Fire* Demand 12.95 100/CCF 1.25/CCF General Facilities Chanre 545 1,365 2,725 4,360 ---PAGE BREAK--- 5-10-2 6-2-8 6-3-14 6-4-9 JK. Late water charges - notice of delinquency on 16th of month. Notice of discontinuance of service 45 da):'s !)ast due. Discontinue service 60 da):'S. Turn off and turn on for non payment per each occurrence. Kl,. Deposits To be required of residential renters and may be required for other applicants. Public lighting costs - per month - per metered water services Residential Units Commercial Units Mobile Home Park Fees A. Construction Permits To be issued by the Administrative Authority upon approval of all final plans by the City Council to start construction - plus per lot fee of B. Park Operator's Permit To be issued by the Administrative Authority upon completion of development and satisfactory final inspection. C. Space Occupancy Permit To be issued to mobile home park owners to allow occupancy upon completion of development and satisfactory final inspection. Mobile Home Parks in Existence prior to 8/25/72. A. Permit for installation and tie down and occupancy inspection. B. Plumbing as set forth in 7-2-11. C. Electrical as set forth in 7-3-6. Vehicle Parks A GeRstmetiea Peffflits EflFief !e l98;!j +e ee issaed ey the Adffliais!H!Iive Alithefi!y HflS!l ef all fiRal fllaRs by !he Gi!y GeaReil !e start eeRs!me!iea. A. Preliminanr Plan Review Fee Fee Schedule; Page 6 5.00 25.00 40.00 1.90 4.90 375.00 5.00 17.50 7.50 17.50 375.00 150.00 ---PAGE BREAK--- B. PaFI